05000327/LER-1981-016-03, /03L-0:on 810206,diesel Generator 2B-B Breaker Tripped Twice While Attempting to Synchronize W/Tva Power Grid for Surveillance Test SI-7.Caused by Overcurrent During Paralleling Operation.Target Reset & Parallel Repeated
| ML20008E916 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/05/1981 |
| From: | Maddox S, Mcgriff J TENNESSEE VALLEY AUTHORITY |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML20008E914 | List: |
| References | |
| LER-81-016-03L, LER-81-16-3L, NUDOCS 8103100504 | |
| Download: ML20008E916 (3) | |
| Event date: | |
|---|---|
| Report date: | |
| 3271981016R03 - NRC Website | |
text
...... --............
y,.
~
h (PLEAsE raint on Tvrt Att nEathiato ineonuationi conTaot si.ocx: Il l
l l
l l
ITTTl IT lN IS IN le li QI n i o l I n f o l o l o lo I lo lo l@l 4111 i l i l il@L l' I g i
8 9 LICENSEg CQQE l.
86 UCENSE NUM9 ER 29 26 UCENSE Tvrt 40 63 cas w i cou r
~~
lolil
,"l,$$ d lo 15 lo 10 I o l 31217 @l o f 2 l O l 6 l 811 @l 0131 ni s l a li l@
t 8
60 60 OOCatET NUUS EM GS 69 EVENT DATE 3.
76 ftEPOAT DAT E so
^
" ' EVEN* DESCRIPTION AND PAOB A8LE CONSECUENCES h D'TT1 I At 0915 (c) on 2/6/81. with toit 1 in mode 4 at 2100F and cooling to s de 5, diesel I.
lo ls] l generator (D/C) 2B-B' breaker tripped twice while attempting to synchronize with the l
I o 14 l l TVA power crid for ' Surveillance Test SI-7.
The diesel generator startdd and accelerated l [oisl l properiv; however.tfie diesel generator breaker tripped on overcurrent relay opera
- tion.
l o 6 l This is reportable per Technical Specification 3.8.1.1 and 6.9.1.13.b.
There was no l
loTTl I danger to the health and safety of the public.
l 10181I l
so r..
es SYST E M CAUSE,
CAUSE
Cou*.
vatyt CODE CODE SUSCQUE Cou*CNENT CODE SUSCODE SUSCCOE l E l'E lh Wh l Z lh l.C l K I T l B lR lK lh l A lh 'lZ l @
l019l 9
iO 18 12 IJ 18 19 20 3
- ftE POR T REVf33.N LE EVENTYEAR REponT No.
. cons TYPE No O",aj;mino I 811I l_I Io il l6 [
y l oi 31 g
g g,
- g
_2.
n u
2.
n n
n n
n 2.
u n'J," 'ACWe!
o'A'ST
$0'Wa" lo lo lo @lo I
^'J.'1"M'
,K"id..
'",'",h',ir-of "IfCTU.'E.
Nouas E
LsJ@l zi@
l zi@
lzl@
L.Ll@
lN l@
W@
l1 [2 l0 l2 l u
2 n
n 2,
o u
o CAUSE DESCRIPrf 0N AND CORRECTIVE ACTIONS I i i o 1 I Th6 'dle.,el ' cenerator breaker trinned immediately after closing dkiring manual syn *chroni-
)
L'_L.i_j l zation of the D/G to the TVA power grid. The D/G alienment was checked: however, on a
^
g l second attempt to parallel, the breaker tripped again on overcurrent. The target was Iii3l l reset and the diesel generator was successfully paralle' led with the grid. The over-11,.; l current relay. synchroscone,and voltmeters were checked and verified to operate correctly.
I s %
's^r'MiE ovnEnsTATus @ $isEviN s PowEn oiscovEnv oEsCniPTioN M l,,Hlh l0l0IOl@l NA l
l A lhl operator Observation I
' 9 Co'0 RENT ActiveTv RELE ASED or nELEast AMoVNT OF ACTivlTY LOCATION CF AttEASE l i l 6 l [2] h l Z lhl NA I
l NA e 9 io is u
.s so pen 50NNEL EXPosumEs NVUS E R TYPE DESCRIPTICN li121lolofol@lzl@l l
NA
~
l 7
8 9 14 82 la to PERSONNE L INJUfttES Nuve E m DESCmiPTION lololol@l NA l
i 7
8 9 it 12 90 LOSS OF on OauaCE TO 8ACsLITY Q Tv'E CESCnie TION v
M LzJ@l l
NA l
l 7
8 9 to
" ' " ~
~*
Punt eCITV 1'
NRC USE ONL v 17 l a l WhlOESCmePflON 955Uto wi l
llltif11IIIll e 9 io es e9 Name of Preparer S.C.Maddox/J.M.McGriff Phone (615) 842-8317 _
l
@l 0810 056Y
Tennessee Valley Authority Sequoyah Nuclear Plant LER SUPPLEMENTAL INFORMATION SQRO-50-327/81016 Technical Specification Involved:
3.8.1.1 Reported Under Technical Specification:
6.9.1.13.6, 4.8.1.1.4 Date of Occurrence: 2/6/81 Time of Occurrence: 0915 CST Identification and Description of Occurrence:
During the conduct of Sarveillance Instruction SI-7 to verify operability of diesel generator (D/G) 2B-B, the D/G was started on a simulated loss of off-site power signal. The D/G started and accelerated properly; however, when the diesel was being synchronized with the TVA grid, the D/G breaker tripped twice. The breaker remained closed on the third attempt and the D/G was successfully loaded.
Conditions Prior to Occurrence:
Unit 1 in mode 4 at 210 F and cooling to mode 5.
Apparent Cause of Occurrence:
The D/G breaker apparently tripped on overcurrent during the paralleling operation which ties the D/G to the TVA grid for loading of the D/G for Surveillance Test SI-7.
Analysis of Occurrence:
During the performance of SI-7, the D/G started properly in response to a simulated loss of of fsite power signal. The D/G was being manually synchronized with the TVA grid when the D/G breaker was closed. The D/G breaker tripped immediately. The paralleling operation was attempted again and the breaker tripped again. On the third attempt the breaker remained closed and D/G 2B-B was successfully loaded.
Corrective Action
The immediate corrective action takenwas to verify that the D/G system align-ment was correct. The overcurrent relay, synchroscope and voltmeters were checked and verified to be correct. No further corrective actions are planned.
The overcurrent-relay and synchronizing circuits are cut out of the diesel generator control and logic for an emergency condition.
. Failure Data:
The following additional information is submitted in accordance with Technical Specification 4.8.1.1.4 and Regulatory Guide 1.108:
D/G Involved: 2B-B
a.
Failure Data: (Continued)
Failure No: N/A. The diesel generator breaker tripped on an overcurrent relay operation. This circuit and the synchronizing circuit are cut out during the emergency operation of the diesel generator. This was classified as an invalid test in accor-dance with Regulatory Guide 1.108, Position C.2.3.(2).
Cause of Failure: The D/G breaker tripped on an overcurrent relay operation.
The exact cause for the overcurrent condition is unknown.
The diesel generator system alignment was verified Corrective Measures:
The overcurrent relay, synchroscope,and volt-to be correct.
meters were verified to operate properly.
Length of Tine Inop:
34 minutes Surveillance Frequency: The present frequency is every seven (7) days.
This is in compliance with Regulatory Position C.2.d of Regulatory Guide 1.108 for three (3) failures in the last 100 valid tests.