ML20008E810

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-413/80-37 & 50-414/80-37 on 801209-11.No Noncompliance Noted
ML20008E810
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 02/04/1981
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20008E809 List:
References
NUDOCS 8103090761
Download: ML20008E810 (2)


See also: IR 05000413/1980037

Text

'

r

  • ..

.

MU4

%

(

g#e,,

UNITED STATES

,([/ a y

NUCLEAR REGULATORY COMMISSION

'

g

,

REGION 11

0,

g

101 MARIETTA ST., NA, SulTE 3100

'

  1. g

j'

ATLANT A, GEORGI A 30303

,

.....

FEB -41931

l

In Reply Refer To:

!

RII:ALC

50-413/80-37

f

50-414/80-37

l'

l'

Duke Power Company

Attn:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, NC

28242

Gentlemen:

This refers to the inspection conducted by A. L. Cunningham of this office on

December 9-11, 1980, of activities authorized by NRC Construction Permit Nos.

CPPR-il6 and CPPR-ll7 for the Catawba Nuclear Station, and to the discussion

of our findings held with S. B. Hager at the conclusion of the inspection.

- Areas examined during the inspection and our findings are discussed in t?.e

enclosed inspection report.

Within these areas, the inspection consisted of

r

selective examinations of procedures and representative records, interviews

I

with personnel, and observation 5 by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined ~ actions you have taken with regard to previously identified

-

enforcement matters.

These are discussed in the enclosed inspection report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

!

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

'

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this' office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the : document.

If we do not hear from you in this regard within

the specified period, th, report will be placed-in the Public Document Room.

903090181

.

m .. --

. - _ _ _ _ , .

.

..

.

.

FEB - 41981

Duke Power Company

-2

Should you have an/ questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

c

.

. Philip Vechr, Chief

ruel Facility and Materials

Safety Branch

Enclosure:

Inspection Report

tios. 50-413/80-37 and 50-414/80-37

cc w/ enclosure:

D. G. Beam, Project Manager

J. W. Hampton, Station Manager

.

.

.