ML20008E404

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-298/80-14 on 800915-18.Details Withheld (Ref 10CFR2.790)
ML20008E404
Person / Time
Site: Cooper Entergy icon.png
Issue date: 10/10/1980
From: Joseph Kelly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20008E403 List:
References
NUDOCS 8010270547
Download: ML20008E404 (2)


See also: IR 05000298/1980014

Text

i

7f

'

s

.

UNITED STATES

  1. p ucoq'o,*

NUCLEAR REGULATORY COMMISSION

'

O\\s

-

REGloN IV

E

I)"

o

611 RYAN PLAZA DRi\\ E, SUITE 1000

3 'r

,

'l

ARLINGTON,TEXA3 76012

-

\\l:

/

October 10, 1980

+....

Docket No. 50-298

Nebraska Public Power District

ATTN:

Mr. J. M. Pilant, Director

of Licensing and Quality Assurance

P. O. Box 499

Columbus, Nebraska 68601

Gentlemen:

This letter refers to the September 15-18, 1980, routine inspection conducted by

Mr. R. A. Caldwell of NRC's Region IV Office. The activities inspected were

those that are authorized under NRC License No. DPR-46.

It further refers to

the discussion that he had with your staff concerning his findings at the

conclusion of the inspection.

The inspection related to your program and activities designed to protect

against industrial sabotage and to safeguard special nuclear material. The

inspection was based on the applicable provisions of Title 10, Part 50, of

the Code of Federal Regulations, entitled, " Licensing of Production and

Utilization Facilities," within Part 73 entitled, " Physical Protection of

Plants and Materials," and the specific r2quirements of NRC License No. DPR-46.

The inspection consisted of selective examinations of procedures and records,

personnel interviews, and observations by the inspector.

Within the scope of this inspection, an apparent item of noncompliance relative

to the frequency of review of your security plan was identified. However, in

view of an apparent conflict between the "words and meaning" of 10 CFR Part 73.55

and the applicable words of your security plan, this matter will not be treated

as an item of noncompliance.

Instead, resolution has been accomplished in

accordance with our Immediate Action Letter to you, dated October 9, 1980

as discussed in the Details Section of the attached report.

The documentation of findings of your security procedures for safeguarding

special nuclear materials and your facility's security procedures are exempt

from disclosure.

This exemption is covered within Title 10 CFR, Part 2,

Section 2.790(d), entitled, " Rules of Practice for Domestic Licensing

l

8010270 5 4h

-

_

'

(.

.

.

L

o

,

Nebraska Public Power District

2

October 10, 1980

Proceedings." Therefore, the inspection report will not be placed in the

Public Document Poom and distribution will be limited.

If you have any

questions concern *..ng this report, we will be pleased to discuss them with you.

Sincerely,

-

,

es A. F. Kelly

Chief, Physical Security Branch

Enclosure:

IE Inspection Report No. 50-298/80-14

cc w/ enclosure:

L. C. Lessor, Superintendent

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska, 68321

,