ML20006E497
| ML20006E497 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 01/31/1990 |
| From: | Robert Williams DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20006E495 | List: |
| References | |
| NUDOCS 9002230349 | |
| Download: ML20006E497 (10) | |
Text
$88h \\ +
c5 i'
M S
d' 4 -
1, [y,d*: 7 a
1
~,
fy t
'3;
,, m
.2q
.c m
y f
'-y' ',
v;&,
y k
- g.
~ \\.
< };
'{
f f.
3, A.
- ['
[0PERATIN6DNTAREPORT~
[
^
fs
^
.t i
W
- t
+
J,_
T DOCKET'NO
~ 50-369 o
u' W '
,. DATE February 15. 1990 '
ti J OPERATING STATU31
.-COMPLETEDBY ' R. A. Willians -
TELEPHONE 704-373-5987-N 11.U'nitName:McGuire1:
L(
2[ReportingPeriod: January 1,1990-1anuary 31,,1990~
q l3.,LicensedTherealPower(MWilf
' 3411,
,i 4
- 4. Naseplate Rating (Bross.MWe) l.
Notes *Nasepla_te Rating:
g 13051-
' U.. Design Electrical Rating (Net MWe):.
- 1180
.(Bross MWe) calculated as
- y
6.'Maxinus Dependable Capacity (Bross MWe):
m.
1171
~1450.000 MVA x.90 power-77.MaxieusDepe'ndableCapacity(NetMWe):l 11129'
.NU2E6-0020.:
a factor per Page lii, j
% Q ;tReport. Give Reasonssi 8.IfChangesOccurinCapacityRatings.(ItessNumber3Through7)SinceLast W
j s r 19.' Power Level To Which Restricted, if Any (Net MWe):'
[bi 110 Treason For Restrictions, if any:
j
- g,
4 W
a 9
This Month Yr.-to-Date Cuaulative
- p ells Hoursiin Reporting Period.
744.0 744.0-71616.0; J
% L"12.:NusberOfHoursReactor'WasCritical 178.3
'178.3 51036.4-
$"N+=f13.LReactorReserveShutdownHours-0--
--0--
l
- 14. Hours Senerator On-Line ;
178.3-170.3 50477.1
~
15.iunitReserveShutdownHours
- --0--
--0--
% ?!6. Bross Thermal Energy Generated.(MWH)c 609302 609302 152009035 9
17' Gross Electrical Energy Generated (MWH) 211001-211001' 52438678 :
g ;019. Unit Service Factor 18(NetElectricalEnergyGenerated(MWH) 194291 194291' 50080674 5
24.0 24.0 70.5
. W, 20. Unit Availability Factor 24.0 24.0 70.5' 2
f f 21. Unit Capacity Factor (Using MDC Net)-
23.1 23.1 60.3
[
g 22 : Unit Capacity Factor,(Using DER Net) 22.1 22.1-
-59.3' C_..,,23fUnitForcedDutageRatei 48.4 48.4 12.6 i" ' ~ i24fShugdownSch{duledOverNext6 Months (Type,Date,andDurationofEach):
urren ty Refueling-t. v' 2 25."If, Shut Down At End Of Report Period. Estisated Date of Startup: April 25, 1990 N
2kUnits'InTestStatus(PriortoCossercialOperation):
Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY k
COMMERCIAt.OPERATICN
'+
9002230349 900215 PDR ADOCK 05000369 3,'
..A.
1R,
~
. ; 7, _,., - -
- 1 4
f
= ' '
OPERATING DATA REPORT
-p 4.
DOCKET NO 50-369 UNIT McGuire 1 DATE February 15. 1990 COMPLETED BY R.A. Willians TELEPHONE 704-373-5987 n.
b:
c
- MONTH -
January. 1990 RA.1 AVERABE DAILY POWER LEVEL DA1 AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1141 17 0 1134 18 0
3 1128 19
'O 4
1145 20 0
5 1145 21 0
6-
=1143 22 0
- 7'
-1143 23 0
B-467 24 0
'9 0'
25 0
. 10 0
26 0
11 0
27 0
' 12 '
0 20 0
13 -
0 29 0
14 0
30 0
.y
.15 0
31 0
.. 16 0
=
I l
1
~
..i
. UNIT. SHUTDOWNS AND POWER REDUCTIONS:
DOCKET NO..'50-3'69
' UNIT NAME nu,ulus 1 DATE uz/13/ yv REPORT MONTH January 1990 COMPLETED-BY.
- s. w. aussx TELEPHONE'
(/ueJ->/J-dIez
-(5)
(1) 2)
(3 (4) -
NE -
E HOD T
A OF LICENSE N.
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE ~
O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE-PREVENT RECURRENCE.
1 90 8 F
O.08 A
3 HH PUMPXX-REACTOR TRIP DUE TO TURBINE TRIP ON LOSS OF BOTH FEEDWATER PUMPS HA TURBIN TURBINE / GENERATOR BEARING DAMAGE-2 90 8 F
167.17 A
DUE TO FAILURE OF LUBE OIL SYSTEM.
RC.
FUELXX END-OF-CYCLE
'6' REFUELING OUTAGE 3
90- 1-15 S
398.50 C
(3 (4
(1) Forced (2geason-ethod:
xhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee Event Report (LER File (NUEG-0161))
C-Refueling 3-Automatic Scram D-Regulato W Restriction 4-Other-(Explain)
E-Operator Training & License Examination F-Administrative (5)Exhibit I - Same Source G-Operator Error (Explain)
H-Other (Explain)
j '
I DOCKET NO:
50-369.
UNIT: McGuire 1 DATE: 02/15/90-NARRATIVE
SUMMARY
Month: January 1990 McGuire Unit 1 began the month of January operating at 100% full power. The unit operated at or near 100% full power until 01/08 at 1015 when a reactor / turbine trip occurred due to loss of both feedwater pumps.
During the turbine coastdown, lube oil was lost to main turbine bearings.
Bearing
. temperatures increased to above 200*F before oil pressure was restored. At vi.
1030 on 01/08, upon being notified of oil spilling.from the generator, operators manually purged hydrogen from the generator. At 1035 on 01/08, attempts to put turbine / generator on turning gear failed as turbine was locked.
Investigation of turbine damage was begun. At 0930 on 01/15, due to
- excessiveLbearing damage, the decision was made to begin the End-of-Cycle "6" refueling outage originally scheduled for March, 1990. The unit ended the month shutdown for the refueling outage.
Prepared by: S. W. Moser Telephone:
704-373-5762
z-
.g%
r 39
,a
?
F
"' k MONTHLY REFUELING INFORMATION REQUEST L1.
Facility name: McGuire, Unit 1 2.- Scheduled'next-refueling shutdown:
Currently refueling 3.
Scheduled-restart-following refueling: April 1990 4.. ;Will~-refueling or resumption of operation thereafter require a technical' specification change.or other license amendment? N_o If yes,1what will these be?
If no, has. reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions? N/A
-5.
Schedule'd date(s) for submitting proposed licensing action and' supporting information: N/A
- 6. -Important licensing considerations (new or different design or supplier,
-unreviewed design or performance analysis methods, significant changes in
-design or new operating procedures).
7..
Number of fuel assemblies-(a) in the core:
193 (b) in the spent fuel pool: 369 8.
Present licensed fuel pool capacity:
1463 Size of requested or planned increase:
9.
Projected date of.last refueling which can be accommodated by present licented capacity:
October, 2004 DUKE POWER COMPANY DATE:
February 15, 1990 Name of
Contact:
J. A. Reavis Phone:
704-373-7567 l
..{-:
.).-
t tit DPERATING DATA REPORT n
DOCKET NO;,_
50-370 DATE February 15. 1990-OPERATING STATUS >
COMPLETED BY R.A. Willians
,W TELEPHONE 704-373-5987 -
- 1. Unit Name McGuire 2-c.
,,.2.-Reporting Period: January 1, 1990-January 31,l1990 E
~ 3. Licensed Thereal Power (MWt):-
3411 4.'Naseplate Rating (Gross MWe):
13055-Notes tNameplate Rating
. 5.' Design Electrical Rating (Net MWe),
1180 (Gross MWel calculated as
'6. Marlous Dependable Capacity (Bross MWe):. 1171-14:0.000 MVA
.90 power L. Maxinus Dependable Capacity (Net MWe) :
7 1129 factor per Page 111, L,
'O.'If Changes Occur in Capacity Ratings-(Itees Nueber 3 Through 7) Since Last NUREG-0020..
-Report..SiveReasons:
=1
- 9. Power Level 10 Which Restricted, if Any (Net MWe) -
4 l
10.ReasonForRestrictions,ifany This Month Yr.-to-Date Cuaulative
~
'11. Hours la Reporting Perind -
744.0 744.0
-51912.0
- 12. Nusber Of Hours Reactor Was Critical 744,0 744.0 39446.0 13.ReactorReserveShutdownHours
--0--
0--
--0--
'14. Hours Generator On-Line 744,0 744.0 38672.0
'15.' Unit Reserve Shutdown Hours
--0--
--0--
--0--
- 16. Gross thersal Energy Generated (MWH) 2458034 2458054 125719304 17.. Gross Electrical Energy Generated (MWH) 987275 887275 44069936
- 10. Het Electrical Eriergy.6enerated (MWH) 856429 B56429 42259326
- 19. Unit Service Factor 100.0 100.0 74.5-
-20.UnitAvailabilityFactor 100.0 100.0 74.5
- 21. Unit Capacity. Factor (Using MDC Net) 102.0 102.0 70.7
- 22. Unit Capacity Factor (Using DER Net) 97.6 97.6 69.0
- 23. Unit Forced Outage Rate 0.0 0.0 10.0
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 23. If Shut Down At End Of Report Period. Estimated Date of Startup:
I
- 26. Units in Test Status-(Prior to Ceasercial Operation):
Forecast Achieved INITIAL CRITICALITY lh!TIAL ELECTRICITY COMMERCIAL GFERATION i
j,pby, '
i H'
~
0PERATINGIATAREPORT-DOCEl NO
'50-370-UNIT McGuire 2
- DATE February 15,1990 COMPLETED BY R.A. Willians TELEPHONE 704-373-5987 g,
\\ MONTH-
- Januarvi 1990 -
'LQ AVERABE DAILY POWER LEVEL.
LQ AVERAGE DAILY POWER LEVEL (MWe-Nat)
(MWe-Net)-
I t - -i 1043 17 1165 2.
1162' IB 1165 13 1163 19 1165
-4 1163 20 1166 5-1158 21 1042 6
1115 22 1133' T
1127 23 1165 EJ 1162 24 1165
- 1162 25 1165 5 10 '
't164 26 1164 11 1164 27 1154 t 12 -
1164 28 1164
- 13 -
1164 29 1165 14 '
1136-30 1165 115 1164 31 1166 16 1165 ti i
' ^ ^
3
'~
g
~ 2%
o
' UNIT SHUTDOWNS AND POWER-' REDUCTIONS
~ DOCKET NO.; 5%-37W.
~ " - '.
~
. UNIT-NAME-nwu1Ms z -
DATE uz/13/ y u REPORT: MONTH
' January 1990.
COMPLETED BY s.-w.
nuszM-
- TELEPHONE t/usj-aiJ-dIez (1)
{2) g.-
(4)
(5)
E HOD T
A OF-LICENSE' N
Y S
SHUT EVENT SYS-
- CAUSE AND CORRECTIVE-
'O P
DURATION O
DOWN REPORT' TEM COMPONENT
-ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE
' PREVENT.' RECURRENCE NO SHUTDOWNS OR REDUCTION S l (1)
(2)
(3)
(4)
F Forced Reason-Method:'
Exhibiti G - Instructions A-Equipment FailureB-Maintenance or test (Explain)
S Scheduled 1-Manual for Preparation of, Data-2-Manual Gcram
'Ent W-Sneets For Licensee C-Refueling
.4-Other (Explain)
File'(
G-0161))
3-Automatic Scram Event Re rt (LER D-Regulaton Restriction E-Operator Training & License Examination-F-Administrative
.(5)
G-Operator Error (Explain)
Exhibit I - Same Source--
H-Other (Explain)
.J.-...
i_..
y
. _. _ ~ ~,
_ _ _ _,.- J.
y,;ggw ;
O!:" p.
r_
s
{?
~
t;a -
r.
t DOCKET N0:
50-370.
.i (UNITi McGuire'2 DNTE:
02/15/90 NARRATIVE
SUMMARY
]
..t Month: January 1990
~McGuire Unit 2 began the_ month.of-January ' operating at 87% power per
... _ dispatcher request. The unit began a power increase at 1702 on 01/01 per.
e dispatcher request, and. reached 100% full power at 2210 on 01/01.
The unit operated ~at or near 100% full power'for the remainder of the month..
1 I
L
!.1.-
L Prepared by: S. W. Moser Telephone:
704-373-5762
(9%?RT99'.
y
~
^
p m ;.. wL.
~ w no:
7 n'
g Y
y r
\\
y: '
. MONTHLY REFUELING INFORMATION REQUEST e,
m jl n
r L1.,lFacilitytname: McGuire, UnitJ2 W>
T2i: Scheduled:next refueling-shutdown: -September 1990 W
+
' L3.
. Scheduled restart following refueling:
November 1990' g
3, 5
4;.~Will: refueling orfresu'mption of operation thereafter require a technical 1
. specification changelor other license amendment? No
- nI#
.If.yes, what'will~these be?
l
.IfLno,;has reload design and core configuration been reviewed'by Safety ~
l
- p
-Review Committee regarding unreviewed safety questions? N/A i
Un l
- 5. ' Scheduled date(s);for submitting proposed licensing action and supporting information: -N/A-i L
- 6.
Important licensing considerations. (new or different' design or supplier,-
unreviewed-design or performance' analysis methods,-significant changes in design or new operating procedures).
l7; _ Number =of fuel assemblies (a) in the core: 193 (b).in the spent fuel pool:
590
[
18.
Present licensed fuel pool capacity:
1463 l;
Size of. requested or planned increase:
.9. - Projected date of last refueling which can be accommodated by present licensed capacity: July, 2002