Forwards Safety Insp Rept 50-029/89-20 on 891107-900102 & Notice of Violation
ML20006C258
Person / Time
Site: Yankee Rowe
Issue date: 01/26/1990
From: Jerrica Johnson
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: St Laurent N
YANKEE ATOMIC ELECTRIC CO.
Shared Package
ML20006C259 List:
References
NUDOCS 9002070212
Download: ML20006C258 (2)


See also: IR 05000029/1989020

Text

,

-

-

_-

.

p n,; , ,

hfMI'2t

pu jm

1,

t.M

JAN 2 61990.

'

'

i.-

,

_ DocketNo.50-29L

g

p$

. Yankee At6mic Electric Company

y

ATTN: Mr. Norman.St. Laurent

F

Manager.of Operations.

F

. 580 Main Street-

jf

Bolton, Massachusetts 01740-1398

64

Gentlemen:

-

5

.

-

t,-

f

Subject:

Inspection Report No. 50-29/89-20

'

o

y

This.~ refers-to the routine resident. safety.-inspection conducted bv Messrs.

'

H. Eichenholz and M. Markley of this officeion November 7,1989 - January 2,

T,'

1990, at-the? Yankee Nuclear Power Station, Rowe, Massachusetts. The inspection-

C

consisted of observation of activities, interviews with personnel and document-

"j

reviews.

The results of the inspection are described in the NRC: Region I In-

.

. spection Report enclosed with this letter and were discussed with you at the

~

r:

conclusion of the inspection.

'

<-

y

During this. inspection,!the NRC identified one case in which commercial grade

-.

~*ts were-used in a ~ safety class application prior to completion of the evalu-

I

r and ciocumentation.

Further, some managers were not fully aware of the

<.

c

'

m :iated procedural requirements.

Installation of these parts is a violation

P

of

) CFR 50,; Appendix B. quality assurance requirements.

'

- inis violation'has been categorived by' severity level in-accordance with " Gene-

ral Statement of Policy and Procedure for Enforcement Actions," 10 CFR 2, .

3

Appendix C-(Supplement I): You are required to respond to this letter and, in

1

so doing,'should follow the instructions in. Appendix A.

!

l'

.

.

L

- Your cooperation with us is appreciated.

1

Sincerely,

Onginal SIEnd W'-

'

lon R. Johnson

j

a

Jon R. Johnson, Chief

"

Reactor Projects Branch No. 3

.

Division:of Reactor Projects

'!

f

- Enclosure:

'

"

, 1 ~.

Appendix A, Notice of Violation

2 .-

.NRC Region I Inspection Report No.- 50-29/89-20

L

l

OFFICIAL RECORD COPY

IR YR 89-20 - 0001.0.0

11/29/80

\\

'

9002070212 900126

"

PDR

ADOCK 05000029

/

nf ;;3

O

PDC-

l

,

,

" '

L

.

. - - ,

. , . .

>

,

.-

.

-

-

,

-.

,-.i

t

',

-

fg-

G.

j

r.. c/

r

,c,

,

Yankee Atomic Electric Company

2

i

~

JAN 2 8 gggp

.

cc w/encls:

N. St. Laurent, Manager of Operations

t

T. Henderson, Plant Superir:tendent

'

,

' G. Papanic, Jr. ... Senior Project Engineer - Licensing

R. Hallisey, Department of Public Health, Commonwealth of Massachusetts.

Public Document Room (PDR)

'

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

Commonwealth of Massachusetts (2)

bec w/encis:

Region I Docket Room (with concurrences)

- M. Perkins, DRMA-(w/o enc 1)

'R. Blough, DRP

,

H. Eichenholz, SRI - Yankee (with concurrences)

T. ' Koshy, DRS

R. Barkley,. DRP (see Paragraph 5.2)

J. Johnson, DRP

_,

G. Grant,: SRI,-Vermont Yankee

!

J. Macdonald, SRI, Pilgrim

P. Sears, NRR

R. Bores, DRSS

R. Keimig, DRSS

,<

.

b

h

4

.

.

-

DRP:RI'

DRP:RI

D

b - M.' Markley/meo

R..

lough

J. Johnson

1/24/90

/ 26 Jo

i'

0FFICIAL EC RD COPY

IR YR 89-20 - 0002.0.0