p;-
p b
yY'
-e>
'.c ~*[
" = 7 NUCLEAR REGULATORY COMMISSION
/
i 7,;
4 WASHINGTON, D C 20555
'*g Danuary 12, 1990 Dceket No. 50-298
~
Mr. George A. Trevors, Division Manager - Nuclear. Support Nebraska Public Power District
. Post Office Box 499 l Columbus,~Nebrasks 68601-0499-1
Dear Mr. Trevors:
REVIEW 0F60-DAYRESPONSETOGENERICLETTER88-20)
SUBJECT:
INDIVIDUALPLANTEXAMINATIONS(IPE)(TACNO.74400 Pe:-
Ceeper Nuclear' Station Cercric Letter 88-20 requires, in part, that each. operating reactor licensee.
and-ccnstruction permit holder: (1) identify the approach and method selected forperformingtheIPE,(2)describethemethodtobe.used,and(3) identify; the scheoule for performing.the IPE and sutmitting the results to:the NRC.
This information was to be submitted to the NRC within 60 days of issuar.ce of Supplercent 1.of the generic letter, j
We have reviewed your letter-dated October 31, 1989, submitted in response to Lthe reporting requireirents of the generic letter. We conclude that your IPE t
approach, methodology and schedule are acceptable. We anticipate that any
- l i.
possible additional analysis or reporting requirements, such as those from l
external. events or from the Containment Performance Improverent Program, will not have any adverse effect on your schedule.
However, if your schedule should
~
change,;please notify the NRC of the proposed change and the reason for the i
i change.
i
-a l
Should you have any questions concerning the requirements of the generic letter, o
please contact Mr. Nichael L. Boyle, NRR at'(301) 492-1308 or Mr. John H. Flack, RES-at(301)~492-3979.
Sincerely, l
G M aul W. O'Connor, Project Manager P
3 Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation ec: See next page 9001260097 900112 PDR ADOCK 05000298
\\
P PDC i
S m
y
.-,_----m,-,.,
,,, _ ~..,.. -
c6-
^
QV ',
+ ;
^
i 4., 11 7
1 January 12, 1990 4
Docket No. 50-298, s.o J
~ Mr. George A. Trevors, Division Manager - Nuclear Support i
. Nebraska Public Power District Post Office Box 499 Columbus, Nebrasks 68601-0499 l
Dear Mr. Trevors:
Y
SUBJECT:
REVIEW 0F 60-DAY RESPONSE TO GENERIC LETTER 88-20, INDIVIDUALPLANTEXAMINATIONS(IPE)(TACNO.74400)
Re:
Cooper Nuclear Station Generic Letter 88-20 requires, in part, that each operating reactor licensee and construction permit holder: (1) identify the approach and method selected forperformingtheIPE,(2)describethemethodtobeused,and(3) identify the schedule for performing the IPE and subraitting the results to the NRC.
This information was to be submitted to the NRC within 60 days of issuance of
' Supplement 1 of the generic letter.
.We have reviewed your letter dated October 31, 1989, submitted in response to the reporting requirements of the generic letter. We conclude that your IPE approach. methodology and schedule are acceptable. We anticipate that any possible additional analysis or reporting requirements, such as those from external events or from the Containment Performance Improvement Program, will
.not have any adverse effect on your schedule. However, if your schedule should change,,please notify the NRC of the proposed change and the-reason for the l
- change, Should you have any questions concerning the requirements of the generic letter, please contact Mr. Michael L. Boyle, NRR at (301) 492-1308 or Mr. John H. Flack, RES at (301) 492-3979.
Original signed by Frederick J. Hebdon for j
Sincerely, 1
Paul W. O'Connor, Project Manager Project Directorate IV Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation cc: See next page
. DISTRIBUTION Docket FiTC NRC PDR Local PDR PD4 Reading G. Holahan F. Hebdon P. Noonan P. O'Connor 0GC-Rockville E. Jordan ACRS(10)
PD4 Plant File M. Boyle J. Flack
' Pb47 F ~ ~JiPb47 F "
I UTabT/IE)"L '::......k:FHebdon.....M...::.....___..::....._...::_........
...... :. _ W
- P0'Connor lNAME :PNoonan:bj lDATEi:01/q /90-
- 01/ll/90
- 01/tL/90 OFF1 tral RttDWtDW~"~~~~-~-~~~ "~~~"~~-~~~~ ~~~~~~~~ ~~- ~ ~
Document Name:
IPE COOPER
a.
Ka, Mr. George-A.:Trevors Nebraska Public Power District Cooper Nuclear. Station 4
i cc:-
. Mr. G. D. Watson, General' Counsel Nebraska Public Power District P.:0. Box 499
- Columbus, Nebraska 68601-Cooper Nuclear Station ATTH: Mr. Guy R. Horn, Division Manager of flucir:ar Operations t
P. O. Box 98-Brownville, Nebraska 68321
- Dennis Grams, Director Nebraska Department of'Environrental Control P. O. Box-98922 Lincoln, Nebraska 68509-8922
- Mr.. Larry Bohlken, Chairman Nestaha County Board of Counissioners Nemaha County Courthouse 1824 N Street Auburn,-Nebraska 68305
. Senior Resident. Inspector L'
U.S. Nuclear Regulatory Connission P. 0.1 Box 218 L
Brownville, Nebraska 68321-Regional Administrator, Region IV l
U.S. Nuclear Regulatory Conr.ission E
611.Ryan Plaza Drive, Suite 1000 Arlington Texas 76011 Mr. Harold Borchart, Director Division of' Radiological Health Departinent of Health o
. 301 Centennial Mall, South L
- P. 0.' Box 95007 Lincoln, Nebraska 68509-5007 4
r 4
- - ~ >
,,n.,
v.-n--,.
- - +