Advises That Intent of Licensee Condition 2.C.12 to Remove Shift Operating Advisors from Control Room Once Full Power Startup Testing Completed or within 30 Days of Issuance of Met.License Amend Necessary to Remove Condition
ML20005G609
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/03/1990
From: Eng P
Office of Nuclear Reactor Regulation
To: Sylvia B
DETROIT EDISON CO.
References
TAC-59615, NUDOCS 9001190407
Download: ML20005G609 (4)


Text

m 4

}g.g h"j'*"C Q p

S.

. UNITED $TATES jf' 4

y g[s

-Janaury;3, 1989 j,d M

, NUCLEAR REGULATORY COMMISSION i

' WASHINGTON,' D. c. 20666 9

P 3

... g..

Docket No. 50-341 Mr. ' B. Ralph Sylvia -

e,

Senior Vice President - Nuclear Operations-Detroit Edison Company j.'

6400 N. Dixie Highway-s

. Newport,. Michigan 48166-Dear Mr. Sylviaf

SUBJECT:

STATUS OF FERMI-2 LICENSE CONDITION 2.C.12 (TAC NO. 59615)

Reference:

Letter from B. R. Sylvia to U.S.N. R.C., "Shif t Operation '

1 Advisors," (NRC-88-0200) dated August 26, 1988 LThe NRC staff has reviewed Section C_of Facility Operating License.NPF-43 to determine ~the current status of Licensing Condition (LC) 2.C.12' applicable to 4

Fermi-2.

License condition 2.C.12 addresses the retention of persons with-Boiling Water Reactor operating experience:

At 'all times the plant:is -in an operating-condition other than cold

-shutdown or refueling, DECO shall have a licensed senior, operator on each

~

shift who,has had at least six months of hot operating experience on a

= similar. type plant;. including at least six weeks at power levels greater than 20 percent of full power, and who has had start-up and shutdown j

experience.

For those shifts.where such an individual is not available on l

the plant staff, DECO shall provide an advisor who has had at least four i

years of power plant-experience, including two years of nuclear plant-F; experience, and who has had at.least one year of experience on shift as a j

licensed senior operator at a similar type facility.

Use of advisors.who I

were licensed only at the-reactor operator-level or who otherwise do not t

fully meet the criteria for shift. advisor, will be evaluated by the NRC staff on a case-by-case basis.

As a minimum, DECO shall train these advisors on the procedures, Technical Specifications and plant systems for theiFermi-2. facility and DECO shall examine the advisors on these l

topics at a level.which will assure their familiarity with the plant.

'For each -shift, the remainder of the shift crew shall be trained in the role of.the advisors.

These advisors, or suitably qualified replacements, g

shall be retained.until at least one of the senior operators on each shift has the required experience.

The NRC staff shall be notified at least 30 days prior to the release.of any special assigned advisor who has been L

provided in accordance with this license condition.

L By the reference letter, DECO informed the NRC of its intent to remove Shift

4 Operating Advisors (SOAs) from the control room once full power startup testing L

was completed or 30 days from the issuance of the referenced letter, whichever was later.

r

\\

(

9001190407 900103 e

PDR.ADOCK 05000341 iP PNV a

. [:

^

h ad!

't l-The-staff notes that the intent of the license condition was that SOAs would

. enhance BWR operating experience of shift personnel during initial plant operations.j The staff alst, notes that cc.nsiderably more plant evolutions have occurred than was-envisioned in the original license condition.

Consequently, the staff-finds:that-the intent of the license condition has been met and finds DECO's removal'of-the SOAs from shift acceptable.

This letter completes NRC' action on TAC No. 59615.

A license amendment will be necessary to remove this condition from the License.

If you hav~e any question regarding these matters, please direct them to either myself-or John Stang.

Sinc y,

v dzgg4u Patricia L. Eng, P oject Manager Project Directorate'III-1 Division of-Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation-l I

i i

u

.]

4 i

i

Mr. B. Ralph Sylvia Fermi-2 Facility Detroit Edison Company _

t-cc:

Mr. Ronald C. Callen Ms. Lynn Goodman Adv. Planning Review Section Supervisor - Licensing Michigan Public Service Commission Detroit Edison Company 6545 Merenntile Way Fermi Unit 2 P. O. Box 30221 6400 North Dixie Highway Lansing, Michigan 48909 Newport, Michigan 48166 John Flynn, Esq.

Senior Attorney Detroit Edison Company 2000 Second Avenue Detroit, Michigan 48226 Nuclear Facilities and Environmental Monitoring Section Office Division of Radiological Health P. O. Box 30035 Lansing, Michigan 48909 Mr. Thomas Randazzo Director, Regulatory Af f airs Detroit Edison Company Fermi Unit 2 6400 North Dixie Highway Newport, Michigan 48166 Mr. Walt Rogers U.S. Nuclear Regulatory Commission Resident Inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 l

Monroe County Office of Civil L

Preparedness 7

963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region III U.S. Nuclear Regulatory Commission l

799 Roosevelt Road Glen Ellyn, Illinois 60137 e-w

n ( 4; s

7, R

r ed< AI \\3

( (.

i b

f s

s

['h[,,[,

i 2

.f

.The staff notes that the intent of the license condition was that SOAs would enhance BWR operating experience of shift personnel during initial plant-operations.

The staff also notes that considerably more plant evolutions have occurred.than was envisioned in the original license condition.

Consequently -

l the staff finds =that the intent of the license condition has been met.and finds i

DECO's removal.of the SOAs from shift acceptable.

l This letter completes NRC action on TAC No' 59615.

A license amendment will-

-E be necessary to remove this condition from the License.

Ifjyou have any question'regarding these matters, please direct them to either myself or John Stang.

Sincerely, Mghd signed by Patricia L. Eng, Project Man 6ger Project Directorate III-1 Division of Reactor Projects - III, IV, V & Special Projects Office of Nuclear Reactor Regulation DISTRIBUTION

. M es

'NRC & LOCAL PDRs s

PD31 GRAY FILE-

'JSTANG PENGi PSHUTTLEWORTH ACRS(10) i

!OGC.

EJORDAN JZWOLINSKI

<f/! LA/PD31:DRSPPE/

DRSP PM/P

'DRS

( D/P 31:DhSP L.

A;PSHUTTLEWORT PE$

Jf"A.S JTH0 /8{9.~' ~

12/jf/89 12/, /89 Jf 89 12 i4 i f o 44 olf o l/ogg q

61 2

pt

~

r;

o H

yu y

.. "f y

\\

.A_

_b j'

r 6

l