NOTICE OF VIOLATION Maine Yankee Atomic Power Company Docket No. 50-309 Maine Yankee Atomic Power Station License No. DPR-36
^
During an NRC special inspection conducted on November 24, 1989, the NRC reviewed the circumstances associated with an apparent violation of the NRC-approved Physical-Security Plan which was identified by the licensee _and reported to the NRC. Two violations were subsequently identified by the l
inspector, one involving failure by the Operations. Department to properly control emergency spare security vital area keys and the other involving a failure of the Operations Department to inventory security keys in accordance I
with the NRC-approved Physical Security Plan.
In accordance with the " General j
Statement of Policy and Procedure for NRC Enforcement Actions", 10 CFR Part 2, 3
Appendix C, (Enforcement Policy) the violations are set forth below:
TBS PlM"?I" CT:'",3 EW33 i
W "7 ;
- T i;D a n. w n
- r pu ww., n u, m
. Llii U PY..
TU$ Fl,?.lDIC C?'lilll5 5l]DiliR$
[ 5 E i O i" ' "' ")1 Q HJ K i
M3CE.I, li is i:J3mElm
~
LEfi BLtdin.
j Tms FMf9n eng;g Sy,.,.y
[P (im o g'
ua1"
!M '" '
hL
~
v 1
10 CFR 73.21, Appendix G, I(3)(c), states, in part, that.any failure, degradation, or the discovered vulnerability in a safeguard system that could allow unauthorized or undetected access to a protected area or vital area for which compensatory measures have not been employed are events to be reported to the NRC within one hour of discovery, followed by a written report within 30 days.
Contrary to the above, from approximately November 19, 1989 at 8:00 a.m. until November 21, 1989 at 1:00 p.m.,
the emergency spare security vital area keys, assigned to the Operations Department, could not be, accounted for, the Security Shift Captain was not 9001160163 891229 PDR ADOCK 05000309 G!
PDC n.v N.
s l,,_
1
,t
} N; h' s
~-
.. e n.g g
,9
=
s,
,. 4 et$d0w.
L..~,r. J h dth?k$
^
su,
l
~
-.2' Appendix A ~
notified, therefore the proper. compensatory measures were not taken, and-the NRC was not notified of the event:within one hour per the requirements;of 10 CFR 73.71.
9 This is a Severity Level IV_ violation.
IUi3 F/E TG* O.s-N.r',n t e,. u.. w, t,
~n
. m)
~ ~-
Li.li:YC :1052 O 13 0 7.((" [ igg 15!8CE, If IS Ini3m0MLY
.Lifi W K m y. :m- -.v w e m.. mme wpurg, u
m
-['.,,5: ty q r,
r - y e p q,r,u' rx,m
,?
=
.n 4 mt m 3
tw
, ', n w it.%p a e m n.tjr s
Wi W~
This is a Severity Level IV violation.
Pursuant to the provisions of 10 CFR 2.201, Maine Yankee Atomic Power Company'
':is hereby required to submit to this office withih thirty days of the date of-the letter'which transmitted this Notice, a written statement or explanation in reply,. including:--(1) the corrective. steps which have been taken and the results achieved; (2) corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Where good cause is shown, consideration will be given:to extending this response time.
c i
_ _ er=w,w.e s-ry,,,w..
u+
m
,3.%,.
.,,,,,,,,,,,gg, g (= r"
- b.
TNe ui L; c i.
., y ;
-s, t.
s
-~..--,_-_._.i
.._ _