Text
,
..o
=,.
/
UNITED STATES
[
l' NUCLE AR REGULATORY COMMISSION
-2 WASHING TON. D. C. 20666 th
\\,',,,
December 21, 1989 Docket Nes.
50-325 and 50-524
'!4r Lynn W. Eury Executive Vice Presicent Power Supply-Carolina Power f. Light Company Post Office Cox 1515 Raleigh, North Carolina 27002
Dear Pir Eury:
SUBJEC1: GENERIC LETTER 88-01, "t:RC POSITION ON IGSCC IN BWR AUSTEN! TIC STAINLESS STEEL PIPING" (TAC N05, 69128 A!O 69129)
The staff and its contractor, Viking Systems International, have completed the review of your submittals in response to Generic Letter 88-01 for the Brunswick Steam Electric Plar.t, Units 1 ano 2.
The Carolina Power & Light Cunpany (CP&L) submittal is acceptable with the exception of leak detection surveillance requirerrents. CPt.L proposed to monitor leakage at apprcrimately four hour inte.rvals by using administrative controls.
The staff believes that leakage ronitoring should be a technical specification requirement. The staf f, however, has reconsioered the monitoring frequency and has concluded that monitoring every eight hours is sufficient. This new
.it the BWR.lmproved Standard Technical Specifications. position will be reflected Details 'of the staff and contractor evaluations are enclosed, it should be noted that the Technical Evalb6 tion Report states that one of CP&L's submitt61s is dated July 29, 1989.
The staff acknowledges that the correct date is June 29, 1989.
The subr.ittal to the staff of future IGSCC inspection plans will not be required. However, if flaws are found that do not meet Paragraph IWB-3500 criteria of Section XI of ASME BXPV Code for continued operation without evaluation the evaluation of the flaws and repair plans should be subinitted to the staff Ior review prior to startup.
The staff agrees with your proposal to include a statement in the technical specification section on 151 to reference this Generic Letter. The wording of the draft technical specification you included with your response to the Generic Letter can now be submitted formally.
p, _ ADO _CK 050_0o324 m
o s.,
December 21, 1989
-2 Within thirty days of your receipt of this letter, please advise the staff of the date that the staff can expect submittal of the technical specification changes discussed above.
l The reporting anc/cr recordkeeping requirements of this letter affect fewer than 10 respondtnts; therefore, OMB clearance is not required under P. L.
96 511.
j Sincerely, p
n Or19nal signed by:
E. G. Tourigny, Senior Project Manager Project Directorate 11-1 Division of Reactor Projects - 1/11 Office of Nuclear Reactor Regulation
Enclosures:
As stated cc w/tn'.1:
See next page DISTRIBUTION 5ee next pagt f
b l
F DIC :PDIl I
)
- FDII.1
- P
{.1 p
l hAME':PAnde n
u i ny:sw:E sam
.....:..........:............:....g/89
- 12/ p/89
- 124 DATE :12/h/89
/
OFFICIAL RECORD COPY Document Name: LTR. EURY 9/29/89 2 e
T December 21, 1989
.9 2-Within thirty days of your receipt of this letter, please advise the staff l
of the date that the staff can expect submittal of the technical specification
)
changes-discussed above.
i The reporting and/or recordkeeping requirements of this letter affect fewer than 10 responhnts; therefore, OMB clearance is not required under P. L.
96 511.
Sincerely, Orignal signed by:
e E. G. Tourigny, Senior Project Manager J
Project Directorate !!.1 1
Division of Reactor Projects. 1/11 l
Office of Nuclear Reactor Regulation i
Enclosures.
As stated cc w/ enc 1:
See next page DISTRIBUTION See next page i
t m n DIC :PDI]I y
- FDll.1
- P I-l 7
NAME :PAnae n
- . u i ny:sw:E sam
.....:....r......:............:....g.......:............:............:............:.........
- 12/ p/89
- 12d
/89 DATE :12/h/89
/
OFFICIAL RECORD COPY Document Name: LTR. EURY 9/29/89 2
e.
I i.e.
7 DISTRIBUTION i
n
-~~-
endMudW4WS40mmu NRC PDR 3
' Local PDR t
S. Yarga 14-E-4 G. Lainas 14-H-3 l
E. Adensam 14-B-20 P. Anderson 14-B-20 E. Tourigny 14 -B-20 i
OGC (For inform. Only) 15-B-18 1
E. Jordan
~
MNBB-3302 T. McLellan 9-H-15 W. Koo 9-H-15 ACRS(10).
P-315 Brunswick File 6
1 5
9 i
i
/
i Mr. L., W. Eury Brunswick Steam Electric Plant Ccrolina Power & Light Comphny Units 1 and 2 CC' Mr. Russell B. Starkey, Jr.
Mr. H. A. Cole Project Manager Special Deputy Attorney General Brunswick fluclear Project State of North Caroline L
P. O. Box 10429 P. O. Box 629 Southport, North Carolina 28461 Raleigh, North Carolina 27602 Mr. R. E. Jones, General Counsel Mr. Robert P. Gruber Carolina Power & Light company Executive Director P. O. Box 1551 Public Staff - tlCUC Raleigh, North Carolina 27602 P. O. Box 29520 Raleigh, North Carolina 27626-0520 Ms. Frankie Rabon Board of Commissioners P. O. Box 249 Bolivia, North Carolina 28422 Pesident inspector U.
. Nuclear Regulatory Commission Star Route 1 P. O. Box 208 Southport, horth Carolina 28461 Regional Administrator, Region 11 U. S. Nuclear Regulatory Comission 101 Marietta Street, Suite 2900 Atlanta, Georgia 30323 Mr. Dayne H. Brown, Chief Radiation Protection Branch Division of Facility Services fl. C. Department of Human Fesources 701 Berbour Drive Raleigh, North Carolina 27603-2008
' Mr. J. L. Harness Plant General Manager Brunswick Steam Electric Plant P. O. Eox 10429 Southport, North Carolina 28461
-