Special Rept:On 891120,Div 1 Diesel Generator 1A Failed During Surveillance Testing.Caused by Erratic Start Times. Diesel Generator Governors Readjusted
ML20005E081
Person / Time
Site: Clinton Constellation icon.png
Issue date: 12/20/1989
From: Holtzscher D
ILLINOIS POWER CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-601577, NUDOCS 9001030223
Download: ML20005E081 (3)


Text

g M

U.601577 L ,

=

(: L47 89(12 20) LP 8E.100c

-itLINDIS POWER COMPANY CLINToN POntR STATION. P.o. BOX 678. CLINTON. ILLINOIS 01727 M10n11Y RMIR December 20, 1989 %d

\ L5

. c C aw? -*-k-gqrlV P

_ _.K k -

k 10CFR50.36 U g . R' * [h4 Q- -

O-$M~1 f it16v_

Docket No. 50-461 Mr. A. B. Da'ris

-Regional Administrator

' Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 e

Subject:

frectal Report: Test Failure of Division I Diesel Generator at Clinton Power Station (CPS)

Dear Mr. Davis:

CPS Technical Specification 4.8.1.1.3 requires all diesel generator failures, valid or non valfd, to be reported to the NRC pursuant,to Specification 6.9.2, SPECIAL REPORTS. Due to a failure of the Division I Diesel Generator'(DG1A) during surveillance testing on November 20, 1989,ethis SPECIAL REPORT is being submitted in accordance with the CPS Technical Specifications to provide the information required by Regulatory Gufde 1.108, Revision 1 " Periodic Testing of Diesel Generator Units Used as Onsite Electric Power Systems at Nuclear Power Plants," Regulatory Position C.3.b.

Descriotion of Event At 1256 hours0.0145 days <br />0.349 hours <br />0.00208 weeks <br />4.77908e-4 months <br /> on November 20, 1989, during the performance of CPS Procedure 9080.01, " Diesel Generator 1A (IB) Operability - Manual," DG1A failed to reach rated speed in less than or equal to 12.0 seconds as required by Technical Specification 4.8.1.1.2.a.4. The recorded time to reach rated speed was 12.77 seccnds. DG1A was declared inoperable and 'y the appropriate Technical Specification ACTION was entered. ,

At approximately 1400 hours0.0162 days <br />0.389 hours <br />0.00231 weeks <br />5.327e-4 months <br />, Nuclear Station Engineering and a vendor, Woodward Governor, were contacted. After consultation with g

Woodward representatives and a careful review of the data recorded I during the start, the decision was :nade to compare the speed controller settings of DG1A with those of the Division II Diesel (DG1B). The as-found speed controller settings of DG1A were noticeably different than those of DG1B. With DG1A still operating subsequent to the slow start, fjjlOgOCK223 891220 s 05000461 PDC h ,1 t

i adjustments to the DGlA speed controller were made under Engineering guidance to more closely match the DGlA speed controller settings with l those of the Division II Diesel. Following these adjustments, DG1A  !

would not stabilize under no load conditions. Woodward Governor was i

, then contacted to provide a service representative on site. Continued adjustments of the DGlA speed controller under Engineering guidance achieved better stability. DGlA was then shut down and allowed to cool j to ambient temperature.

l At 2258 hours0.0261 days <br />0.627 hours <br />0.00373 weeks <br />8.59169e-4 months <br />, plant personnel initiated another maintenance start of DGlA. Rated speed was achieved in 9.54 seconds. DGlA was then shut down to await arrival of the Woodward Governor service representative.

At approximately 0900 hours0.0104 days <br />0.25 hours <br />0.00149 weeks <br />3.4245e-4 months <br /> on November 21, 1989, the Woodward Governor service representative arrived on site and was briefed on the current status of the investigation. At approximately 1100 hours0.0127 days <br />0.306 hours <br />0.00182 weeks <br />4.1855e-4 months <br />, Maintenance, Engineering and the service representative met with Operations to discuss further actions to be performed.

At 1300 hours0.015 days <br />0.361 hours <br />0.00215 weeks <br />4.9465e-4 months <br />, a maintenance start of DGlA was performed to allow the service representative to monitor the starting characteristics. The resulting start time for this run was 9.84 seconds. Maintenance personnel performed adjustments as directed by the service representative. The engine was then monitored in a no load condition, as well as at 20% load. DG1A was then shut down and allowed to cool to  ;

ambient temperature.

At 1744 hours0.0202 days <br />0.484 hours <br />0.00288 weeks <br />6.63592e-4 months <br />, a post maintenance testing start of DG1A was performed with a resulting start time of 9.69 seconds. At 1746 hours0.0202 days <br />0.485 hours <br />0.00289 weeks <br />6.64353e-4 months <br />, DG1A was shut down and allowed to cool.

At 2104 hours0.0244 days <br />0.584 hours <br />0.00348 weeks <br />8.00572e-4 months <br />, the Surveillance run was successfully completed l

with a resulting start time of 9.69 seconds. DG1A was subsequently l

declared OPERABLE at approximately 2330 on November 21, 1989.

l Cause of Event A review of the start times for all three diesel generators was conducted. The Division 1 diesel genertor start times are noticeably more erratic than the start times of the other divisional diesel generators. While the solution to this event appears to be the readjustment of the diesel generator governors, other potential I concributing causes need to be evaluated and resolved. An Action Plan for resolution of the DG1A slow start times has been developed and is currently being implemented. The objectives of this Action Plan are to I identify the root cause and resolve those factors which may impact the ,

l ability of DGlA to routinely meet its starting requirements. The design l- and operating data currently available and observations made during these troubleshooting tests suggest a number of potential contributors to the problem. Under this Action Plan, Illinois Power will investigate these potential contributors to develop a basis for corrective actions.

Other factors that may be identified will be addressed appropriately.

l (2)

i 4.

Corrective Action As identified above, speed controller adjustments under the direction of the Woodward Governor service representative provided adequate corrective action to restore DG1A to OPERABLE status. The Action Plan teing developed will provide long-term generic corrective action. The objective of the action plan is to install instrumentation on the diesel generator fuel oil and air start systems and gather  ;

technical data. This will require scheduling the data gathering and inspections around the required surveillances and scheduling appropriate ,

diesel generator outage times. l Additional Information 1 i

This event represents the second valid failure in the last 20 valid tests for DG1A (and the fifth valid failure in the 60 valid tests  !

that have been performed for DG1A since receipt of the operating )

license). Therefore, the surveillance frequency for DG1A has been  ;

increased to once per 7 days in accordance with Technical Specification 1 Table 4.8.1.1.2 1. )

On December 11, 19E9, DG1A experienced an additional slow start.

The SPECIAL REPORT prepared in response to that event will be submitted on or before January 10, 1990, and will include additional information regarding the available results obtained from the DGIA Action Plan discussed in this letter as they apply to the root cause determination of the November 20, and December 11, 1989 failures. The Action Plan will be completed and a final report will be submitted describing the root cause and corrective actions taken to correct the DG1A slow starting condition on or before March 30, 1990. In the meantime, the diesel will be tested at the frequency in accordance with the Technical Specifications.

Sincerely yours,  :

A D. L. Holtzscher Acting Manager -

Licensing and Safety DAS/ktm cc: NRC Clinton Licensing Project Manager NRC Resident Office NRC Document Control Desk Illinois Department of Nuclear Safety (3)