e
,
UNITED STATES
8% '
'$
NUCLEAR REGULATORY COMMISSION
c
REGION 11
g
.., [
101 MARIETTA ST., N.W., SUITE 3100
p
ATLANTA, GEORGIA 30303
JUN 10 ism
"***
D([
'
Duke Power Company
ATTN:
Mr. W. O. Parker, Jr.
{
9
191 b-(.
h
Vice President, Steam Proauction
Charlotte, NC 28242
-
g O'I Op. S--
P. O. Box 2178
,
Si
Gentlemen:
S
6
h
,j
Subject: Report Nos. 50-413/81-09 and 50-414/81-09
O
This refers to the routine safety inspection conducted by Mr. J. R. Harris of
this office on May 19-22, 1981, of acti'.ities authorized by NRC Construction
Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion
of our findings held with Mr. D. G. Beam, Project Manager, at the conclusion of
the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported unre-
solved items. The status of these items is discussed in the enclosed inspection
report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosed report will be placed in the NRC's Public Document Room.
If the report contains any information that you believe to be exempt from disclo-
sure under 10 CFR 9.5(a)(4), it is necessary that you: (a) notify this office by
telephone within ten days from the date of this letter of your intention to file
a request for withholding; and (b) submit within twenty-five days from the date
of this letter a written application to this office to withhold such information.
If your receipt of this letter has been delayed such that less than seven days
are available for your review, please notify this office promptly so that a new
due date may be established. Consistent with section 2.790(b)(1), such applica-
~
tion must be accompanied by an affidavit executed by the owner of the information
which identifies the document or part thereof sought to be withheld, and a full
statement of the reasons on the basis of which it is claimed that the information
should be withheld from public disclosure.
This section further requires the
statement to address with specificity the considerations listed in 10 CFR 2.790-
(b)(4). The information sought to be withheld shall be incorporated as far as
T 60 !
.s
7 8107080363 810610
OPDR ADOCK 05000413
dG
,
..
>
.
J':N 10 test
Duke Power Company
2
possible into a separate part of the affidavit. If we do not hear from you in
this regard within the specified periods noted above, the report will be placed
in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
T. [.S. .
C
s, Acting Director
Divis en of Resident and
Rear. tor Proje::t Inspection
- Enclosure:
Inspection Report Nos. 50-413/81-09
and 50-414/81-09
-