Category:CORRESPONDENCE-LETTERS
MONTHYEARML20138H3831999-10-25025 October 1999 Forwards Draft Model of Renewed License for Calvert Cliffs, Unit 2 to Illustrate How List of Minimum Requirements Could Be Incorporated Into License Condition ML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20217M1721999-10-19019 October 1999 Forwards NRC Rept Number 17, Requal Tracking Rept Form Operator Licensing Tracking Sys.Rept Was Used by NRC to Schedule Requalification Exam for Operators & Record Requal Pass Dates ML20212M2631999-10-0404 October 1999 Informs That Staff Concluded That Licensee Responses to GL 97-06 Provides Reasonable Assurance That Condition of Util SG Internals in Compliance with Current Licensing Bases for Calvert Cliffs Nuclear Power Plant ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20212J7811999-09-30030 September 1999 Requests That Licensee Address Potential Aging Mgt Issue Re Effects of Void Swelling of Rv Internals by Making Plant Specific Commitment to Implement Focused age-related Degradation Insp for Evidence of Void Swelling in Future ML20212J5611999-09-29029 September 1999 Informs That on 990916,NRC Completed mid-cycle Plant Performance Review of Calvert Cliffs.No Areas in Which Util Performance Warranted Addl Insp Beyond Core Insp Program Identified.Historical Listing of Plant Issues,Encl ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20212A2001999-09-0808 September 1999 Forwards Insp Repts 50-317/99-06 & 50-318/99-06.Two Violations Being Treated as Noncited Violations ML20211N8971999-09-0707 September 1999 Responds to Ltr to D Rathbun of NRC Dtd 990720,in Which Recipient Refers to Ltr from Wc Batton Expressing Support on Renewal Application of Baltimore Gas & Electric Co for Calvert Cliffs Plants ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20211K3091999-08-27027 August 1999 Informs That During 990826 Telcon,L Briggs & B Bernie Made Arrangements for NRC to Inspect Licensed Operator Requalification Program at Calvert Cliffs Npp.Insp Planned for Wk of 991025 ML20211J1611999-08-17017 August 1999 Documents Bg&E Consultations with MD Dept of Natural Resources Re Potential Impacts to Chesapeake Bay Critical Area & Forest Interior Dwelling Bird Habitat,Per Ccnpp License Renewal.Telcons Ref Satisfy Consulting Requirement ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210Q1941999-08-11011 August 1999 Informs That Info Submitted in 981130 Application Re CEN-633-P,Rev 03-P,dtd Oct 1998,marked Proprietary,Will Be Withheld from Public Disclosure,Per 10CFR2.790(b)(5) & Section 103(b) of AEA of 1954,as Amended ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N1291999-08-0505 August 1999 Forwards NRC Response to W Batton Ltr Expressing Support of Renewal Application for Calvert Cliffs Plants as Requested in Ltr ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20211C0951999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20211B5381999-07-30030 July 1999 Expresses Appreciation for Support in Y2K Training & Tabletop Exercise Held on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by NRC ML20210J0741999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise on 990714.Suggests Referral to NRC Y2K Web Site to View Issues & Lessons from Tabletop That Will Be Tracked by Nrc.Web Site Should Reflect Info within 2 Wks ML20211C3251999-07-30030 July 1999 Expresses Appreciation for Participation in Y2K Training & Tabletop Exercise Held on 990714 ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210D0911999-07-22022 July 1999 Responds to to Chairman Jackson Referring to Ltr from New 7th Democratic Civic Club,Inc.Forwards Staff Response to W Batton,President of New 7th Democratic Civic Club,Inc ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20210A5021999-07-20020 July 1999 Responds to ,Expressing Support for Renewal of Operating Licenses for Calvert Cliffs Plant & to Concerns Re Lack of Specificity for License Renewal Regulations & Length of Time Set Aside for Public Comment ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20210B7651999-07-15015 July 1999 Forwards SER Denying Licensee Proposed TS Amend Dtd 981120, to Delete TS Requirements for Tendon Surveillance & Reporting Because TS Requirements Duplication of Requirements in 10CFR50.55a.Notice of Denial Encl ML20209G2081999-07-13013 July 1999 Forwards Insp Repts 50-317/99-05 & 50-318/99-05 on 990509- 0626.No Violations Noted ML20210A6311999-07-0606 July 1999 Discusses Closure of TACs MA0532 & MA0533 Re Response to Requests for Addl Info to GL 92-01,rev1,suppl 1, Reactor Vessel Structural Integrity, for Plant,Units 1 & 2 ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20211H8431999-06-23023 June 1999 Ack Participation of Calvert Cliffs Nuclear Engineering Dept in NRC Cooperative Research Project with Univ of Virginia. Copy of Relevant Portion of NRC Cooperative Agreement with Univ of Virginia Encl ML20196C6831999-06-21021 June 1999 Discusses Proposed Alternative Submitted by Bg&E for Calvert Cliffs NPP to Requirements of 10CFR50.55a(g)(4) in Regard to Compliance with Latest Approved Edition of ASME Code,Section XI for Third Ten Year Insp Interval Beginning on 990701 ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J8271999-06-16016 June 1999 Ack Receipt of to Jackson,Chairman of NRC Re Environ Impacts of Increased Patuxtent River Complex Flight Operations on Ccnpp.Clarification & Correction of Listed Statement Found on Page Two,Provided 1999-09-08
[Table view] Category:INCOMING CORRESPONDENCE
MONTHYEARML20217M9991999-10-22022 October 1999 Forwards Response to NRC 990930 RAI Re Void Swelling Degradation Mechanism,Per License Renewal Application for Ccnpp,Units 1 & 2 ML20216J8671999-10-0101 October 1999 Forwards Rev 52 to QA Policy for Calvert Cliffs Nuclear Power Plant. Rev Accurately Presents Changes Made Since Previous Submittal,Necessary to Reflect Info & Analyses Submitted to NRC or Prepared,Per to NRC Requirements ML20216H7831999-09-28028 September 1999 Forwards Addl Info Re NRC SER for Ccnpp,Units 1 & 2,per License Renewal Application ML20212D5361999-09-20020 September 1999 Forwards Rev 1 to Calculation CA04048, Fuel Handling Accident During Reconstitution, as Agreed During 990909 Telcon ML20212C1861999-09-15015 September 1999 Requests That NRC Complete Review of TR CED-387-P,Rev 00-P, Abb Critical Heat Flux Correlations for PWR Fuel, by 000201.Util Expects to Use ABB-NV Correlation for Current non-mixing Vane Fuel in Reload Analyses in 2000 for Ccnpp ML20211H9841999-08-31031 August 1999 Provides Comments Re Data Entered in Rvid for Ccnpp,Units 1 2,per GL 92-01,Rev 1,Suppl 1, Reactor Vessel Structural Integrity ML20210V1181999-08-17017 August 1999 Forwards Toxic Gases Calculations for Control Room Habitability,As Discussed During 990713 Telcon.Util Will Make Final Submittal for Toxic Gases After NRC Has Completed Review of ARCON96 ML20210T5061999-08-16016 August 1999 Forwards Rev 0 to Ccnpp COLR for Unit 2,Cycle 13, Per Plant TS 5.6.5 ML20210U2761999-08-13013 August 1999 Forwards Listed Info Re Guarantee of Payment of Deferred Premiums for Ccnpp,Units 1 & 2,IAW 10CFR140.21 Requirements ML20210S7901999-08-12012 August 1999 Forwards semi-annual Fitness for Duty Program Performance Data for Period of 990101-990630,IAW 10CFR36.71(d) ML20210S8131999-08-12012 August 1999 Forwards Summary of Various Open Licensing Actions for Bg&E That Were Completed During Unit 2 Refueling Outage Ending 990506 ML20210S8101999-08-12012 August 1999 Forwards Application Requesting Renewal of License for Mv Seckens,License SOP-10369-2.Without Encl ML20210N5881999-08-0606 August 1999 Forwards ISI Rept for Ccnpp,Unit 2,fulfilling Intentions & Requirements Stated in Program Plan & Commitment to Comply with ASME Code Section XI ISI Requirements ML20210N5491999-08-0505 August 1999 Requests That License SOP-10371-2,for RW Scott,Be Renewed IAW 10CFR55.57.Individual Has Satisfactorily Discharged License Responsibilities Competently & Safely.Without Application ML20210N5471999-08-0505 August 1999 Requests That License SOP-10031-3,for DF Theders,Be Removed from Active Files for Ccnpp,Due to Individual Being Reassigned to Position No Longer Requiring License ML20210N9291999-08-0404 August 1999 Forwards Clarification to Initial Response to Biennial Rept on Status of Decommissioning Funding,As Required by 10CFR50.75(f)(1) ML20210E4941999-07-23023 July 1999 Informs That 1999 Emergency Response Plan Exercise Objectives Is Scheduled for Wk of 991025.Exercise Scenario Will Test Integrated Capability & Major Portion of Elements Existing within Emergency Response Plan ML20210C5011999-07-21021 July 1999 Informs That SL Walters,License OP-10096-3 & CC Zapp,License Number SOP-2188-9,have Been Reassigned within Organization & No Longer Require NRC License,Per 10CFR50.74(a).Removal of Subject Licenses from Active Files for Ccnpp,Requested ML20211N9101999-07-20020 July 1999 Forwards Correspondence Author Received from New 7th Democratic Club Civic,Inc Raising Some Serious Concerns About Renewal of Nuclear Reactor Licenses for Calvert Cliffs Power Plant ML20210C2681999-07-20020 July 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsement,Per 10CFR140.15(e) ML20210C8461999-07-19019 July 1999 Informs That CF Farrow,License OP-10648-1,will No Longer Be Employed with Bg&E,As of 990709,per 10CFR50.74(a).Removal of Subject License from Active Files for Ccnpp,Requested ML20209J5171999-07-16016 July 1999 Forwards Comments from Accuracy Review of License Renewal Application SER ML20209C1391999-07-0202 July 1999 Forwards Responses to Open & Confirmatory Items Based on Review of SER for Bg&E Application for Renewal of Operating Licenses for Calvert Cliffs.Bg&E Intends to Forward Comments Based on Accuracy Verification in Near Future ML20210D1531999-06-30030 June 1999 Informs of Receipt of from New 7th Democratic Civic Club,Inc Expressing Support for License Renewal. Requests Consideration in Addressing Concerns & Recommendations ML20209B5781999-06-29029 June 1999 Submits Response to GL 98-01, Y2K Readiness of Computer Sys at Nuclear Power Plants. GL 98-01 Requested Response on Status of Facility Y2K Readiness by 990701.Disclosure Encl ML20210D1741999-06-24024 June 1999 Expresses Opinions on Renewal of Nuclear Reactor Licenses Re Plant & Support Renewal Application of Bg&E.Requests That NRC Revise Procedures to Allow Sufficient Time for Public to Review,Evaluate & Respond to Info ML20196C4291999-06-21021 June 1999 Forwards Rev to ERDS Data Point Library for Ccnpp,Unit 2,per 10CFR50,App E,Section VI.3.a.Table Provides Brief Summary of Changes ML20195J6591999-06-16016 June 1999 Submits Proposed Alternative to Requirements of 10CFR50.55a(g)(4) (Automatic Compliance with Latest Approved Edition of ASME Code Every 120 Months).Proposal Will Apply Third ten-year ISI Interval,Scheduled to Begin 990701 ML20207F0201999-06-0101 June 1999 Forwards Third Interval Inservice Insp Program Plan for Ccnpp,Units 1 & 2, for NRC Review.Plan Satisfies Commitment Contained in Licensee to NRC 05000317/LER-1999-002, Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b)1999-05-28028 May 1999 Requests That Cover Page for LER 99-002,dtd 990525,be Corrected to Indicate Rept Is Submitted Per Requirements of 10CFR20.2201(b) ML20195B3751999-05-25025 May 1999 Forwards ECCS Codes & Methods Rept, as Required by 10CFR50.46(a)(3)(ii) ML20195B2521999-05-25025 May 1999 Submits Response to RAI Re LAR for Tube Repair Using Leak Limiting Alloy 800 Sleeves for Ccnpp,Units 1 & 2.Test Repts Encl ML20195B2271999-05-24024 May 1999 Forwards Certified Copy of Nuclear Liability Policy NF-216, Endorsement 128 ML20206U3051999-05-19019 May 1999 Submits Written Rept as Required follow-up to Verbal Rept Given to NRC Regional Administrator on 990419 of SG Tube Insps Conducted,Cause of Tube Degradation & Corrective Measures Taken as Result of Insp Findings ML20206U8281999-05-18018 May 1999 Forwards Missing Pages C-30,C-31,C-114 & C-115 from 990319 Response to NRC RAI, Wind Tunnel Modeling of Calvert Cliffs NPP Cpp Project 94-1040. Complete Copy of 1985 Rept, Wind Flows & Dispersion Conditions of Calvert Cliffs, Encl ML20212G9751999-05-12012 May 1999 Forwards Draft write-up Re OI 16 for F Grubelich to Consider ML20206K6921999-05-10010 May 1999 Forwards Certified Copy of Listed Nuclear Liability Policy Endorsements,In Compliance with 10CFR140.15(e).Without Encl ML20206K1711999-05-0707 May 1999 Informs That on 990430 Util Filed Encl Articles of Share Exchange with Maryland Dept of Assessments & Taxation to Form Holding Company,Constellation Energy Group,Inc (Ceg). CEG Is Parent Company of Bg&E ML20206C7521999-04-29029 April 1999 Provides Rept of Number of Tubes Plugged in Calvert Cliffs Unit 2 SGs During Recently Completed Isi,As Required by Calvert Cliffs Unit 1,TS 5.6.9.a ML20212G9891999-04-28028 April 1999 Forwards Current Draft Response to Ci 3.3.2.2-1 to Be Used as Example for OI Vs License Condition Vs Commitment Situation ML20206C7271999-04-28028 April 1999 Forwards Occupational Radiation Exposure Repts for 1998, as Required by Units 1 & 2 Tech Specs 5.6.1 & 6.1 of Isfsi. Repts Contain Tabulation of Number of Station,Util & Other Personnel Receiving Exposures Greater than 100 Mrem ML20206C7211999-04-27027 April 1999 Forwards Addl Info Which Is Being Made Available in Encl Licensed Operators Fitness for Duty Questionnaire.Encl Specifics of Personal Info Are Withheld,Per 10CFR2.790 ML20212G9851999-04-26026 April 1999 Provides Proposed Response to OI 4.1.3-1 for B Elliott to Consider ML20206U6691999-04-26026 April 1999 Advises That Documents Re Operation of Calvert Cliffs Nuclear Power Plant Should Be Addressed to Listed Natl Marine Fisheries Svc Office ML20205F8851999-04-0202 April 1999 Provides First Annual Amend to Bg&E License Renewal Application for Ccnpp,Units 1 & 2,as Required by 10CFR54 ML20205J0691999-04-0202 April 1999 Forwards Response to NRC 990129 RAI Re GL 96-05, Periodic Verification of Design-Basis Capability of Safety-Related Movs ML20205G2971999-04-0101 April 1999 Requests That NRC Complete Review of Rev 0 to CENPD-396-P, Common Qualified Platform TR & Rev 0 to CE-CES-195-P, Software Program Manual for 'Common Q' Sys, by 990930 ML20205D7471999-03-30030 March 1999 Forwards Biennial Rept on Status of Decommissioning Funding, IAW 10CFR50.75(f)(1) ML20207G4391999-03-30030 March 1999 Responds to from Cl Miller,Requesting Assistance of FEMA in Addressing Concerns Received by NRC Involving Offsite Emergency Preparedness at Plant NPP ML20205C4091999-03-26026 March 1999 Submits Info Related to Scope,Risk Mgt & Summary of Risk for Performing Preventive Maintenance on P-13000-2 Unit Transformer Re License Amend 205 1999-09-28
[Table view] Category:UTILITY TO NRC
MONTHYEARML20064A7471990-09-18018 September 1990 Discusses Response to Generic Ltr 88-17, Loss of Dhr. Development of Appropriate Tech Spec Changes for Reducing Cooling Flow Rate in Process.Changes Will Provide Increased Margin to Vortexing Conditions ML20059K1951990-09-18018 September 1990 Clarifies Auxiliary Feedwater Sys Commitments Concerning Ability of Sys to Prevent Total Loss of Feedwater Following Various Pipe Breaks & Component Failures ML20059H2811990-09-0707 September 1990 Forwards Rev 4 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Rev Creates Std Format for Action Plans Which States Scope, Deliverables & Overall Objectives of Action Plan ML20059F4761990-09-0707 September 1990 Forwards Rev 5 to Security Training & Qualification Plan.Rev Withheld ML20059H4241990-09-0707 September 1990 Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900905 05000317/LER-1989-023, Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture1990-08-24024 August 1990 Advises That Licensee Plans to Complete Detailed Design for Automatic Isolation Sys Upgrade by 910401,per NRC Request for Schedule for Enhancement Implementation as Discussed in LER 89-23 Re Postulated Pipe Rupture ML20059B7481990-08-21021 August 1990 Forwards fitness-for-duty Program Performance Data for Jan-June 1990 ML20058Q2211990-08-14014 August 1990 Forwards Performance Improvement Plan Implementation Program Schedule Status as of 900807.Synopsis of Activities Since Last Update & Updated List of Key Action Plan Info Also Encl ML20058L8811990-08-0101 August 1990 Withdraws License Amend Request Changing Tech Spec Pages 3/4 25a & 25b, RCS Pressure-Temp Limitations. Change Would Have Revised Min Reactor Vessel Flange bolt-up Temp from 70 F to 90 F ML20058L7271990-08-0101 August 1990 Forwards Plant Performance Improvement Plan Implementation Program Schedule Status as of 900724 ML20058L2151990-07-27027 July 1990 Responds to NRC Re Unresolved Item Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Action: Evaluation of Battery Charger Determined That Provisions Adequately Verify Requirements of Tech Spec 4.8.2.3.2 ML20055H9241990-07-26026 July 1990 Forwards Decommissioning Plan for Calvert Cliffs Isfsi ML20055G9981990-07-20020 July 1990 Responds to NRC Re Generic Implications & Resolution of Control Element Assembly Failure at Plant on 900607.New Control Element Assemblies Ordered.Addl Response Will Be Submitted at Least 60 Days Prior to Restart ML20044B0401990-07-13013 July 1990 Forwards Rev 3 to Calvert Cliffs Nuclear Power Plant Performance Improvement Plan Implementation Program. Brief Summary of Changes Listed ML20055E0801990-07-0303 July 1990 Responds to NRC Re Violations Noted in Insp Repts 50-317/90-08 & 50-318/90-08.Corrective Actions:Instruction CCI-309B Re Control of Locked Valve Revised to Clarify Required Documentation and Verification of Locked Valves ML19298E2271990-06-29029 June 1990 Confirms That Work Intended to Resolve Unresolved Items & Incorporate Improvement Suggestions Completed,Per Insp Repts 50-317/90-04 & 50-318/90-04 ML20055D0311990-06-25025 June 1990 Submits Corrections to Commitments Re Hydrogen Analyzer Sys. Under Worst Case Condition,Hydrogen Recombiners Would Be Started Prior to Hydrogen Concentration Inside Containment Reaching 3.0% Hydrogen ML20043G1771990-06-12012 June 1990 Forwards Monthly Operating Repts for May 1990 for Calvert Cliffs Nuclear Power Plant Units 1 & 2 & Revised Operating Rept for Apr 1990 for Calvert Cliffs Unit 1 ML20043G5931990-06-0808 June 1990 Requests one-time Exemption from Requirement of 10CFR50.71(e) to Allow 3-month Extension to Schedule for Submitting 1990 Rev to Updated Fsar,Per NRC 1989 QA Audit & Insp Repts 50-317/89-27 & 50-318/89-28 Noting Weaknesses ML20043F7101990-06-0606 June 1990 Suppls 900330 Response to Station Blackout Rule (10CFR50.63).Two Addl Class 1E Diesel Generators Added to Reduce Required Coping Duration.Required Coping Duration Is 4 H for One Unit ML20043D7281990-06-0404 June 1990 Responds to NRC 900404 Ltr Re Weaknessess Noted in Maint Team Insp Repts 50-317/90-80 & 50-318/90-80.Efforts to Clean,Insulate & Paint Plant Areas to Improve Cleanliness Being Undertaken ML20043C9051990-05-31031 May 1990 Notifies of Relocation of Ofcs,Effective 900604.New Addresses & Telephone Numbers Listed ML20043C5971990-05-29029 May 1990 Forwards Startup Review Board Self-Assessment Rept:Apr 1990 Unit 1 Startup. Based on Assessment,Mgt Efforts Taken Through Performance Improvement Plan Appears Substantially on Track ML20043B9341990-05-25025 May 1990 Advises of Licensee Progress to Date Re Unresolved Item Noted in Inps Repts 50-317/90-04 & 50-318/90-04 & Identify Slippage Past 900601 Target Date.Completion Date Extended to 900701 ML20043B4691990-05-21021 May 1990 Reaffirms Licensee Intention to Submit Rept Re Deletion of Tech Spec 3/4.6.1.8, Containment Sys - Containment Vent Sys, Upon Receiving Notification That Vent Valves 1(2)-MOV-6900 & 1(2)-MOV-6901 Established ML20043A3381990-05-15015 May 1990 Responds to NRC 900409 Ltr Re Violations Noted in Insp Repts 50-317/90-01 & 50-318/90-01.Corrective Actions:Detailed & Specific Directions for Radiography Will Be Incorporated in Radiography Procedures within NDE Program ML20043A3321990-05-14014 May 1990 Responds to SALP Rept Dtd 900404 Covering Util Performance During 1989.Feedback Mechanisms Established to Improve Training & 10CFR50.59 Screening Procedure & Training Revised ML20042G3751990-05-10010 May 1990 Forwards Changes 1-3 to Rev 0 to Program Plan for Second Insp Interval for Calvert Cliffs Nuclear Plant,Units 1 & 2. Plan Revised to Include Volumetric & Surface Exams of Class 2 Piping Welds in Containment Spray & Shutdown Cooling Sys ML20042G6141990-05-0505 May 1990 Requests Regional Temporary Waiver of Compliance to Provide Relief from Provision of Limiting Condition for Operation of Tech Spec 3.4.10.1, Structural Integrity of ASME Code Class 1,2 & 3 Sys. ML20042G4581990-05-0404 May 1990 Responds to Request for Addl Info Concerning Tech Spec Amend Re Emergency Diesel Generators.Preventive Maint Procedures Prepared on 900411 & Final Approval Will Be Completed After Issuance of Amend ML20042F5771990-05-0404 May 1990 Responds to NRC 900404 Ltr Re Violations Noted in Insp Repts 50-317/90-80 & 50-318/90-80.Corrective Actions:Surveillance Test Procedure M-538-1 Revised to Include Verification of Alarm Function & Alarm Testing Reviewed ML20042F0101990-04-30030 April 1990 Forwards Update of Tables 1C,2A,2B,3A & Page 7 of Semiannual Effluent Release Rept for Second Half of 1989 & Table 3A for Second Half of 1988 & First Half of 1989.Update Includes Strontium Results for Fourth Quarter for Gaseous Releases ML20042E8271990-04-30030 April 1990 Forwards Rev 2 to Calvert Cliffs Performance Improvement Plan Implementation Program. Accountability Improvements, Engineering Planning & Sys Circles Action Plans Completed. New Sections to Rev Listed ML20042F0391990-04-19019 April 1990 Submits Initial Response to SALP Rept Dtd 900404.Licensee Devoted Substantial Senior Mgt Attention & Resources to Improving Facility Performance & Committed to Continue Efforts to Attain High Stds of Safety & Quality ML20012F5511990-04-0606 April 1990 Responds to NRC 900306 Ltr Re Notice of Violation & Proposed Imposition of Civil Penalty in Amount of $100,000.Corrective Actions:Operating Procedures Changed to Prohibit Testing of ECCS When in Solid Water Condition ML20012F2991990-04-0404 April 1990 Revises Scheduled Completion Date for Implementation of Computerized Trending of Surveillance Test Data,In Response to Special Team Insp Repts 50-317/89-200 & 50-318/89-200 from 900601 to 901228 ML20042D8101990-03-30030 March 1990 Forwards Supplemental Info,Clarifying Util 890414 Response to Station Blackout Rule Noting That Util Followed NUMAR-87-00 Methodology ML20012F0211990-03-29029 March 1990 Responds to NRC 900227 Ltr Re Violations Noted in Insp Rept 50-317/89-25.Corrective Actions:Plugging Error Identified & Correct Tube Plugged & Corrective Action Procedures Revised ML20012D3111990-03-19019 March 1990 Provides Followup Response to Violation Noted in Insp Repts 50-317/89-24 & 50-318/89-24.Corrective Actions:Radiation Safety Technicians Responsible for Safety Procedures Trained in Jan 1990 & Radwaste Scaling Factors Approved on 900201 ML20012D1871990-03-16016 March 1990 Discusses Readiness for Restart of Facility ML20012B9121990-03-0909 March 1990 Withdraws 891113 Request for Relief from ASME Code Section XI Requirements ML20012B9221990-03-0909 March 1990 Responds to NRC 900207 Ltr Re Violations Noted in Insp Repts 50-317/89-27 & 50-318/89-28.Corrective Actions:Demineralized Water & Chemicals Added to Steam Generators to Restore Chemical Concentrations to Required Specs ML20012B6111990-03-0707 March 1990 Responds to NRC 900229 Ltr Re Violations Noted in Readiness Assessment Team Insp Rept 50-317/89-81.Corrective Actions: Memo Issued re-emphasizing Importance of Mgt Controls & General Supervisor Counselled ML20012D7271990-03-0505 March 1990 Responds to Violations Noted in Insp Repts 50-317/90-03 & 50-318/90-03 on 900108-12.Corrective Actions:Medical Svcs Tested All Members of Nuclear Security Force for Glaucoma & field-of-vision Requirements ML20011F4251990-03-0101 March 1990 Forwards Page 4-9 of Rev 25 to Security Plan,Originally Submitted on 900228.Encl Withheld (Ref 10CFR73.21) ML20011F4491990-02-28028 February 1990 Forwards 1989 Steam Generator Insp Results Rept.Rept Includes Number & Extent of Tubes Examined,Imperfections Noted & Identity of Tubes Plugged.No Steam Generator Tube Exams Conducted on Unit 1 During 1989 ML20012A1481990-02-28028 February 1990 Forwards Rev 25 to Security Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) ML20012A1531990-02-28028 February 1990 Forwards Rev 11 to Safeguards Contingency Plan & Details of Changes Made by Rev.Encls Withheld (Ref 10CFR73.21) ML20011F4141990-02-27027 February 1990 Forwards Rev 2 to, Evacuation Time Estimates within Plume Exposure Pathway EPZ for Calvert Cliffs Nuclear Power Plant. Evacuation Time Estimates Updated to Reflect Population & Road Network Changes Since 1981 ML20012A2331990-02-26026 February 1990 Advises That Erosion/Corrosion Program Controlling Implementing Procedure 5.05, Secondary Sys Piping Erosion/ Corrosion Insp Program, Fully Implemented on 891229 1990-09-07
[Table view] |
Text
- BALTIMORE GAS AND ELECTRIC -
CHARLES CENTER.P. O. BOX 1475 BALTIMORE, MARYLAND 21203 ARTHum E. LUNDVALL. JR.
vice PmtsioENT
June 15,1981 sD I IW
- Director 8- '/
Region I, U.S. Nuclear Regulatory Commission 9
- 2) ( . A4%[ Ur .
Office of Inspection and Enforcement 631 Park Avenue -
King of Prussia, PA 19406 C* ' ,ks D gl)
'Y jkyl r,\ s.v
Subject:
Calvert Cliffs Nuclear Power Plant '
Units Nos.1 & 2, Docket Nos. 50-317 & 50-3 q1 a j i v[,-[ j Report of Changes, Tests and Experiments Gentlemen:
As required by 10 CFR Part 50 Paragraph 50.59, attached is a report of all changes, tests and experiments made on Calvert Cliffs Units 1 and/or 2 under the provisions of that Part and covering the period from our last such report through May 1, 1981. It is our intent at this time to submit another report in hter 1981.
Items in the attached are referred to by " Facility Change Request (FCR)"
number.
Very tr yours, .
_fe .
- &Wb cc: Director of Inspection and Enfo. cement (39 copies)
U.S. Nuclear Regulatory Commission Washington, D.C. 20555
- 3. A. Biddison, Esquire G. F. Trowbridge, Esquire T6>y
.s
/!/
8107080189 810615 p PDR ADOCK 050003170 l R PDR)
L
S:
Attachment to Lundvall letter t
of June 15,1981 Page 1 of 6 Changes, Tests and Experiments Made In Accordance With 10 CFR 50.59 for Calvert Cliffs Units 1 and/or 2 74-131 This FCR provided for the redesign and change of materials of the CEA Extension Shafts and Gripper Operating Tool. Because there is no change in the function or operation of the equipment and Ikewise no decrease in the quality of material or performance, no unreviewed safety question exists.
3 75-144 This FCR repired the Tave indication on MCB 1&2C05 with an autioneered Odghest) T indication. The safety analysis concluded that this FCR does not conshitute an unreviewed safety question because: T
.output is theislimiting condition isolated from the remainderfor safe operations of RPS, so no adverse and efnot Tave; the T[ec RPS or ESFAS; no new systems are being added.
75-1093 This FCR added a bypass damper around the Emergency Core Cooling System and ' the spent fuel pool charcoal filter. The new damper was required because the leak rate of the existing damper was too high. The change did not constitute an unreviewed safety question since it restored the system to a condition consistent with original design criteria.
75-1105 This FCR replaced the purification filter isolatioi gate valves with globe valves in order to induce flow throtgh the boronometer with a clean filter. The valve type change does not change the safety related function of the valve or the system and thus does not increase accident probability.
76-83 This FCR added pre-engineered metal buildings at the Containment Structure Equipment Hatch Access Openings. These metal buildings provide a laydown area for shielding and equipment during maintenance, modification and refueling periods. These buildings provide protection from the elements and improve cleanliness and security. These buildings
! were erected independently of the containment structure, and as a result, this FCR does not constitute an unreviewed Safety question.76-119 ~ TMs FCR was to modify 2-CV-306 to remove jadscrew, thus eliminating means to lo& open the valve. Removal of ja& screw does not affect ability of the valve to operate. Further, the seismic design is not affected as the weight of the ja& screw is negligible compared to the weight of the valve.
p 76-148 This FCR provided shielding to reduce exposure in vicinity of the reactor
- head laydown area during Vessel Head "0" -Ring replacements. Since
, there was no change to safety related equipment and since the only safety related. portion 'was concrete drilling in the Elevation 69'-0" slab, consistent with original design, the effect was negligible and does not i constitute an unreviewed safety question.
i-1
-,,._,m-- ~. - , . . . - - _ _ _ . - . . - . , .-
76-152 To minimize interference with upper guide structure (UGS) ir.spection,
. ladder #3 in the refueling pool was modified to make a portion removable above the flange elevation. There is no real change in the function or strength of the ladder, and hence, there is no unreviewed safety question.76-167 This FCR modified the containment atmosphere radiation monitoring
, systern. The technical specifications require this system to be operable for reactor coolant system leakage detection. The loss of both the particulate and gas detectors in this system requires the reactor to be in hot standby within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />. The addition of bypasses around each detector allows maintenance woA on one detector while the other is still operable. Also the installation of a second sampling pump in parallel with the existing one allows essentially continuous operation should one of the pumps fail. This modification is not an unreviewd safety question since the system is non safety related but shown in the FSAR.76-183 Original condenser fan motors for the switchgear room HVAC were replaced with more reliable motors. A high failure rate of the original dripproof type motors required replacement with weatherproof type motors. The change increased the reliability of the switchgear room HVAC system, thcrefore, it does not constitute an unreviewed safety question.
76-1010 This FCR added isolation amplifiers for signal transmission from the Nuclear Instrument (NI) channels to the Fourier Analyzer. The safety analysis concluded that this change did not constitute an unreviewed safety question, because the isolation amplifiers prevent equipment interaction (between safety-related and non safety-related), and because the equipment is seismically qualified.
76-1011 This FCR replaced the diaphragm, 0-rings, air regulator, solenoid valve, and limit switches on CV-517. The safety analysis concluded that this FCR does not constitute an unreviewed safety question, because the change does not degrade the functioning of RPS, ESFAS, nor CV-517 and because no new systems, equipment, or operations are being added.
76-1067 This FCR relocated the steam generator snubber tubing to avoid interference with other piping. The safety analysis concluded that this FCR does not constitute an unreviewed safety question because the rerouting was done in accordance with the original design criteria.
i 77-81 This FCR revised four piping and instrumentation diagrams, bringing the drawings up to date, adding information and clarity. No physical wo&
was involved.77-142 This FCR added flanges to lines on either side of relief valves RV-430 and RV-431 (safety injection system) to facilitate their removal for periodic testing. The safety analysis concluded that the stresses in the system with this change will remain essentially the same as before. The modification is performed in accordance with the governing codes. This change did not constitute an unreviewed safety question.
l 77-144 This FCR added flanges to the lines on either side of relief valve RV-311 (CVCS) to facilitate removal for periodic testing. The safety analysis i
l t
4 concluded that the stresses in the system with this change remain essentially the same as before. The modification is performer' in accordance with the governing codes. This change did not constitute an unreviewed safety question.77-175 This FCR designed and installed steel resting pads for storage of the core support barrell lift rig. There is no unreviewed safety question concerning this FCR. Since there was no change in the location of the rig, no structural review was required and the structural integrity of the plant systems was not impaired. Anchor bolts in safety-related concrete were installed per existing civil standards.77-176 This FCR replaced a heat exchanger relief valve in the component cooling system with a temporary valve until the original valve could be repaired.
The temporary replacement was set at the same pressure. The safety analysis concluded that the modification did not constitute an unreviewed safety question since the temporary replacement valve exceeded requirements.
78-35 Fabricated hanger brackets for the weld inspection pole and mounted on -
reinforced concrete wall. The hanger brackets were designed and located to prevent damage to the pole. Concrete anchors were installed in safety-related reinforced concrete wall in accordance with existing civil standards. Safe shutdown of the plant is not impaired and hence there is no unreviewed safety question.
78-77 This FCR replaced the existing main steam flow transmitter root valves with sealed diaphragm-type valves. The previous valves were non-isolable. The safety analysis concluded that the modification did not constitute an unreviewed safety question. The replacement valves had higher pressure ratings than the previous one.
78-98 This FCR provided a portable elapsed time indication for the Emergency Diesel Generator. It does not constitute an unreviewed safety question since this equipment plugs into circuitry (via relay cabinet) of the specific EDG being tested. The equipment is only used during tests.78-102 This FCR was issued to fabricate and install weld sleeve to repair cracked heat exchanger piping at RCP cover housing. The sleeve acts to reduce stresses in the heat affccted zone of the repair weld and reduce nossibility of weld failure. Safety analysis concluded no unreviewed safety question because effect of the failure would be to create a leak similar to that being repaired.
0
/8-119 This FCR encapsulates a 45 lateral tee on the suction line from #22 charging pump. Since neither the function nor the operation of the system is affected by this modification and the line has axial restraint to prevent separation, this is not an unreviewed safety question.78-121 The packing of the salt water pumps was replaced with a Chesterton-style packing to prevent damaging the shaf t sleeves on the pumps. Since the operation and function of the salt water pumps were not changed, it was concluded that this FCR did not constitute an unreviewed safety question.
_ 15 _
78-138 This FCR replaces piano hinge on containment cooling duct fusible lirk doors with storage hinges. The door must open on LOCA. Stronger hinges will not affect opening therefore, no unreviewed safety question e::ists.78-153 15/16" nuts were installed on the reactor coolant pump seal vent valves in place of handwheels. Opening and closing of the valves is done with the use of a wrench. Safety analysis concluded that this modification did not constitute an unreviewed safety question.
78-1023 This FCR repaired the damage on the main steam isolation valve ,
hydraulic piping supports and evaluated other main steam isolation valves to determine if generic problems existed. The design was analyzed and found to be consistent with the original design so this FCR did not constitute an unreviewed safety question.
78-1032 This FCR ailowed for the installation of replacement cam followers to be r used in the containment personnel air lod <s. The safety analysis concluded that this FCR does not constitute an unreviewed safety question because there was no change in design or function.
78-1034 This FCR changed the material of the conmonent cooling pump impeller wear ring at the recommendation of the pump vendor. The safety analysis concluded that this does not constitute an unreviewed safety question because the pump operation is unchanged, no pressure retaining parts are affected and the new material is equally resistant to wear and corrosion.
79-8 This FCR revised drawings to show the correct size for the condenser neck extraction piping. A minor drafting error had been made. Safety analysis concluded that this modification did not constitute an unreviewed safety question.
79-15 Various relief valves on the component cooling side of the sample coolers were replaced. The new valves were capable of being adjusted when the lift setpoint is out of tolerance. This FCR did not constitute an unreviewed safety question since the replacement relief valves are suitable for the design conditions.
79-17 This FCR changed the tensile st ength of the fuel transfer tube blark flange 0-ring from 1500 psi to IC00 psi at the recommendation of the manufacturer. The safety analysis concluded that this did not constitute an unreviewed safety question. The tensile strength of the subject gaket i is irrelevant for this application since the gaiet is under compression.
The new 1000 psi tensile strength will still control the fillers in the gaAet material within the desirable limits to insure the important physical properties are not affected.
79-24 This FCR allowed "Furmanite" repairs to the feedwater check valve (FW-130). Keeping the size of the injection holes to 5/16" dia maximum and at least 6 inches apart, the stresses in the valve body are still below the allowable limit. The safety analysis concluded that this FCR does not constitute an un eviewed safety question.
l 79-36 This FCR allowed for drilling and tapping various locations on the l auxiliary feedwater pump turbine trip and throttle valve operators to accommodate alemite grease fittings. Routine lubrication would reduce
_5_
failures of operating mechanisms. The safety analysis concluded that the valve operation is unchanged and the modification did not constitute an unreviewed safety question.
79-57 This FCR deleted spare limit switches and gear boxes from 1 & 2-MOV-403 and 405. These spare limit switches were not wired and were not necessary. The MOV's are safety related from a pressure boundary standpoint only. The removal of the spare limit switches were not significant to the seismic qualification of the MOV's.
79-62 This FCR allowed for the machining of the low pressure safety injection pump bearing housing / stuffing box extension interface. This was done to reduce clearances that wc4e excessive. Safety analysis concluded that this FCR did not constitute an unreviewed safety question.
1 79-149 This FCR placed a temporary shield wall for the high level primary sampling station as required by the TMI LLTF requirements. The wall provides no -safety . related function and structurally could not damage Safety Related equipment if it did fall and therefore no unreviewed safety question exists.
79-1005 This FCR allowed a change of material of the cylinder of Type B Crosby relief valves from SS 316 to SS 316 '.. The change was suggested by the vendor. The safety analyr.is concleded that the substitute material has better corresion resistance and the same physical strength properties.
The change does not affect operation of the relief valve. This is not an unreviewed safety question.
79-1014 This FCR changed the material to be used for the packing gland studs and bonnet retainer screws of the main steam isolation valves. TSe operation of the main steam isolation valve is unchanged and the FCR did not constitute an unreviewed safety question.
79-1026 Change drawing to reflect "as-built" condition of spray ring. The Unit 1 inner ring has 89 instead of 90 nozzles. The function of the ring remains
!~
unchanged and the design conditions are still met. Therefore, no unreviewed safety questions exist.
79-1055 This FCR modified the control circuits for the containment isolation valves so that resetting ESFAS will not inadvertantly reopen the valves.
The safety analysis concluded that this FCR doa not constitute an unreviewed safety question, because: the change does not affect RPS; the original design criteria for ESFAS regarding separation and seismic still applies; fail-safe on loss of power still applies to the containment isolation valves and control circuits; design does not allow inadvertant l closure of containment isolation valves; no new systems nor operations l are being added; and, the containment isolation valves' closure times are l not charged.
l 79-1065 This.FCR replaced the existing H.P. Pump Unloader Solenoid valves in the MSIV Hydraulic Unit with environmentally qualified solenoid valves and
- provided vital power to them. Valve replacement improved the qual!!y of the system. Accumulawrs serve as adequate redundancy should existing unloader valves fail. This is not an unreviewd safety question.
30-76 This FCR replaced a worn section of Wide Range NI drawer test signal cable with a jumcor. Replacement is at drawer connection. The change did not affect E.sincered Safety Features and is being done in accordance with the original design criteria for the RPS. The Signal Path was recalibrated after modification.
80-94 This FCR provided flanges for the letdown heat exchanger inlet relief valve so that repairs and testing would be more easily accor.iphshed. The addition of the flanges maintained the integrity of the piping sys'sem and the FCR did not constitute an unrevir:wed safety question.