Forwards IE Insp Rept 50-412/81-02 on 810505-07 & Notice of Violation
ML20005B084
Person / Time
Site: Beaver Valley
Issue date: 06/15/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Woolever E
DUQUESNE LIGHT CO.
Shared Package
ML20005B085 List:
References
NUDOCS 8107060295
Download: ML20005B084 (2)


See also: IR 05000412/1981002

Text

_

/

o

UNITED STATES

'

8

k

NUCLEAR REGULATORY COMMISSION

O

j

REGION I

S

&

631 PARK AVENUE

          • ,o#

KING QF PRUSSIA, PENNSYLVANIA 19408

Docket No. 50-412

JUN 151981

Duquesne Light Company

ATTN: Mr. E. J. Woolever

Vice President

435 Sixth Avenue

Pittsburgh, PA 15219

Gentlemen:

Subject:

Inspection 50-412/81-02

This refers to the routine safety inspebtion conducted by Mr. R. Feil of

this office on May 5-7, 1981 at the Becer Valley Power Station, Unit 2,

Shippingport, Pennsylvania of activities authorized by NRC License No.

CPPR-105 and to the discussions of our findings held by Mr. Feil with Mr.

R. Washabaugh of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that one of your act-

ivities was not conducted in full compliance with NRC requirements, as set

forth in the Notice of Violation, enclosed herewith as Appendix A. This

item of noncompliance has been categorized into the levels described in the

Federal Register Notice (45 FR 66754) dated October 7, 1980.

You are

required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

In addition to the need for

I

corrective action regarding this specific item of noncompliance, we are

!

concerned about the implementation of your management control systems that

permitted it to occur. Consequently, in your reply, you should describe in

particular, those actions taken or planned to improve the effectiveness of

your management control systems.

I

Violations contrary to 10 CFR 50, Appendix B, Criterion XIII were identified

during previous inspections of your licensed activities on November 6-8,

l

1979, and June 2-6, 1980, and were documented in the enclosure to our

'

letters dated December 28, 1979 and July 7, 1980.

Your letters to this

office dated January 29, 1980 and August 6, 1980 stated that your Field

Construction Procedure was revised to re-emphasize the need for controls of

,

j

stored materials and the contractor responsible for the storage has assigned

l

specific personnel to perform inspections to assure correct storage conditions

are met.

l

l

8107060295 810615

PDR ADOCK 05000412

i

,

G

PDR

gg

t

.

,

.

.

Duquesne Light Company

2

JUN 151981

From our'May 5-7, 1981 inspection it appears that the stated corrective

actions were not effective since this item has recurred.

Recurrent and uncorrected items of noncompliance are given additional

veight in the consideration and selection of appropriate enforcement action.

Ti'erefore, in your response to this letter, you should give particular

atvention to those actions taken or planned to ensure that identified items

of noncompliance will be completely corrected and will not recur.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this 1stter of your intention to file a request for withholding;

and (b) submit, within 25 days from the date of this letter a written application

to this offica to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by *.he owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with :cecificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room.

The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

f

_

.on

Eldo

J. Brunner, Acting Director,

Div sion of Resident and Project

In pection

Enclosures:

1.

Appendix A, Notice of Violatica

2.

Office of Inspection and Fr.iorcement Inspection

Report Number 81-02

cc w/encis:

R. J. Washabaugh, Quality Assurance Manager

I

-

.

_

-