Text
@ (t0gsq
%
o
UNITED STATES
8"
' ,7.
NUCLEAR GEGULATORY COMMISSION
$
REGION V
s
k'
8
1990 N. CALIFORNI A BOULEVARD
+,'d
,e
SUITE 202, WALNUT CREEK PLAZA
,,e
WALNUT CREEK, CALIFORNI A 94596
June 16, 1981
.
Docket No. 50-361
Southern California Edison Company
c
P. O. Box 800
.A,
2244 Walnut Grove Avenue
'l
'[
Rosemead, California 91770
g
MI 30 iss
%gg,;,g[--J
Attention: Dr. L. T. Papsy, Vice President
d
Advanced Engineering
S
Gentlemen:
Q
Subject: NRC Inspection of San Onofre Unit No. 2
'4 l co
This refers to the inspection conducted by Messrs. R. Pate and L. Miller of
this oifice on March 13, to April 14, 1961, of activities authorized by NRC
-
Construction Permit No. CPPR-97, and to the discussion of our findings held
by Mr. Pate witn Mr. Croy and other members of your staff at the conclusion
of the inspection.
'
-
'
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
i
of procedures and representative records, interviews with personnel, and obser-
l
vations by the inspectors.
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in
the Notice of Violation, enclosed herewith as Appendix A.
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you believe
to be exempt from disclosure under 10 CFR 915(a)(4), it is necessary that you
(a) notify this office by telephone within ten (10) days from the date of this
letter of your intention to file a request for withholding; and (b) submit
within 25 days from the date of this letter a written application to this office
to withhold such information.
If your receipt of this letter has been delayed
such that less than seven (7) days are available for your review, please notify
this office promptly so that a new due date may be established. Consistent
.
with section 2.790(b)(1), any such application must be accompanied by an affidavit
'
executed by the owner of the information which identifies the document or part
sought to be withheld, and which contains a full statement of the basis on which
l
l
h
to g
8I0701o 3[,y
4
-
.
-
.,
i
.
,.
.
.
1
Southern California Edison Company
-2-
June 16,1981
i
it is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity the
considerations listed in 10 CFR 2.790(b)(4). The information sought to be
withneld shall be incorporated as far as possible into a separate part of
the affidavit.
If we do not hear from you in this regard within the specified
periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you,
cerely,
.
~
,
J. L. Crews, Chief
, Reactor Operations Projects Branch
Enclosures:
1.
Notice of Violation-Appendix A
2.
IE Inspection Report
No. 50-361/81-09
'
cc w/o enclosure 2:
.
-
R. Dietch, Vice President
.
Nuclear Engineering & Operations, SCE
.