Forwards IE Insp Rept 50-361/81-09 on 810313-0414 & Notice of Violation
ML20005A848
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 06/16/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20005A849 List:
References
NUDOCS 8107010364
Download: ML20005A848 (2)


See also: IR 05000361/1981009

Text

@ (t0gsq

%

o

UNITED STATES

8"

' ,7.

NUCLEAR GEGULATORY COMMISSION

$

REGION V

s

k'

8

1990 N. CALIFORNI A BOULEVARD

+,'d

,e

SUITE 202, WALNUT CREEK PLAZA

,,e

WALNUT CREEK, CALIFORNI A 94596

June 16, 1981

.

Docket No. 50-361

Southern California Edison Company

c

P. O. Box 800

.A,

2244 Walnut Grove Avenue

'l

'[

Rosemead, California 91770

g

MI 30 iss

%gg,;,g[--J

Attention: Dr. L. T. Papsy, Vice President

d

Advanced Engineering

S

Gentlemen:

Q

Subject: NRC Inspection of San Onofre Unit No. 2

'4 l co

This refers to the inspection conducted by Messrs. R. Pate and L. Miller of

this oifice on March 13, to April 14, 1961, of activities authorized by NRC

-

Construction Permit No. CPPR-97, and to the discussion of our findings held

by Mr. Pate witn Mr. Croy and other members of your staff at the conclusion

of the inspection.

'

-

'

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

i

of procedures and representative records, interviews with personnel, and obser-

l

vations by the inspectors.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Appendix A.

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you believe

to be exempt from disclosure under 10 CFR 915(a)(4), it is necessary that you

(a) notify this office by telephone within ten (10) days from the date of this

letter of your intention to file a request for withholding; and (b) submit

within 25 days from the date of this letter a written application to this office

to withhold such information.

If your receipt of this letter has been delayed

such that less than seven (7) days are available for your review, please notify

this office promptly so that a new due date may be established. Consistent

.

with section 2.790(b)(1), any such application must be accompanied by an affidavit

'

executed by the owner of the information which identifies the document or part

sought to be withheld, and which contains a full statement of the basis on which

l

l

h

to g

8I0701o 3[,y

4

-

.

-

.,

i

.

,.

.

.

1

Southern California Edison Company

-2-

June 16,1981

i

it is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specificity the

considerations listed in 10 CFR 2.790(b)(4). The information sought to be

withneld shall be incorporated as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you,

cerely,

.

~

,

J. L. Crews, Chief

, Reactor Operations Projects Branch

Enclosures:

1.

Notice of Violation-Appendix A

2.

IE Inspection Report

No. 50-361/81-09

'

cc w/o enclosure 2:

.

-

R. Dietch, Vice President

.

Nuclear Engineering & Operations, SCE

.

e-