Text
.
s l
v.
4 s
g'
^
DA 6 MS-Clh mew
\\
Di str_ib.ution :
dE83at w r
% gi, R
D
- ~
Docket Nos. 50-31
> 'f g'f #
h ORB #3 Rdg N dl/,y2
[V79 D. Eisenhut OELD 44 k'*,bte6pN N)
OI&E (3)
!(4
/
C.
Mr. A. E. Lundvall, Jr.
R. A. Clark
'N M"
Vice President - Supply M. Conner Baltimore Gas & Electric Company P. Kreutze P. O. Box 1475 NSIC i
Baltimore, Maryland 21203 TERA ACRS (10) i
Dear Mr. Lundvall:
J. Heltemes 1
l By letter dated May 28,1981, Mr. Olson officially notified the NRC of the suspension of all LNG shipping operations at the Cove Point Teminal. This suspension, since about April 1980, is due to contractural problems (related to the price of LNG) with the Government of Algeria. Mr. 01 son's specific request is to suspend the daily operability checks of the " hot line" between the Calvert Cliffs Nuclear Power Plant and the Cove Point LNG Teminal. This comunication daily check is required by Paragraph 2.1 of the LNG Contingency P1an (Appendix H of the Emergency Response Plan).
The subject requirement resulted from a comitment requested by the NRC 3
staff and agreed to by your staff in preparation for issuance of our June 13,1978 Safety Evaluation. The " hot line" commitment was Item (b) of seven items to be addressed in the contingency plan (Page 12 of the Safety Evaluation).
l We find it acceptable to suspend the daily operability checks of the hot line and any other active requirements previously agreed to by our staffs.
a However, we do not believe it would be prudent to discard all procedures
]1 (such as Appendix H of the Emergency Response Plan), special instrumentation, comunication equipment, etc. until the Cove Point Terminal is completely 1
j deactivated. As a result of the May 28,1981 notification, we plan no further review of the LNG potential risk question.
.\\
We request early notification when any ct.nge in the projected LNG ship traffic occurs in the future.
Sincerely,
'f A nj
?5 l
Robert A. Clark, Chief Operating Reactors Branch #3 a
I Division of Licensing
[
cc: See next page DL:0RBd3 DL:0RB#3 DL50RB#3 r.,,s
. x.. w s '
PKreu,tzer MConner:ms RAClark j
~
6/;.. /81 6/ /81 6//c /81.,
=:
l*---
Q gfggg3g3
/_~u..
~
P
- o. }
j 3altimore Gas and Electric Company cc:
James A. Biddison, Jr.
Ms. Mary Harrison, President Calvert County Board of County Commissioners Genersl Counsel Baltimore Gas and Electric Company Prince Frederick, MD 20768 P. O. Box 1475 U. 5. Environmental Protection Agency Baltimore, MD 21203 Region III Office George F. Trowbridge, Esquire Attn:
EIS Coordinator Shaw, Pitt: nan, Potts and Trowbridge Curtis Building (Sixth Floor)
Sixtn and Walnut Streets 1800 M Street, N. W.
Washington, D. C.
20036 Philadelphia, PA 19106 Mr. R. C. L. Olson, Principal Engineer Mr. Ralph E. Architzel Nuclear Licensing Analysis Unit Resident Reactor Insoector Baltimore Gas and Electric Company NRC Inspection and Enforcement P. O. Bos 437 Rocm 922 - G3E Building P. O. Box 1475 Lusby, MD 20657 Baltimore, MD 21203 Mr. Charles 3. 3rinkman Manager - Washington Nuclear O'perations Mr. Leon 3. Russell Coeustion Engineering, Inc.
Plant Su::erintendent 4853 Cordell Avenue, Suite A-1 Calvert Cliffs Ne.:ledar Power ?lant Sethesca, MD 2001A Maryland Route's 2 & 4 Lusby, MD 20657 Mr. J. A. Tierman, Manager Nuclear Power De;: art ent Eechtal Power Corporation Calvert Cliffs Nuclear Pcwer Plant Attn: Mr. J. C. Judd Chief Nuclear Engineer Maryland Routes 2 & a 15740 Shady Grove Road Lusby, MD 20657 Gaitnersburg, MD 20750 Director, Criteria and Standards Division Office of Radiation Programs (ANR-460)
Com::ustion Engineering, Inc.
U. S. Environmental Protection Agency A::n:
Mr. P. W. Kruse, Manager Engineering Services Washington, D. C.
20460 P. O. Box 500 Mr. W. J. Lipoold, Suoervisor Windsor, CT 06095 Nuclear Fuel Management Baltimore Gas and Electric Comoany Public Document Room Calvert Cliffs Nuclear Power Plant Calvert County Library Prince Frederick, MD 20678 P. O. Box 1475 Baltimore, Maryland 21203 Director, Departnent of State Planning 301 West Preston Street Mr. R. E. Denton, General Suoervisor Saltimore, MD 21201 Training & '.~echnical Services Calvert Cliffs Nuclear Power Plant Mr. R. M. Douglass, Manager Maryland Routes 2 & 4 Ouality Assurance Decartnent.
Lusby, MD 20657 Fort Smallwood Road Cceplex P. O. Box 1475 3altimore, MD 21203 Mr. T. L. Syndor, Gcneral Su::ervisor Administrator, Pcwer Plan: Siting Prograa 0;:erations Quality Assurance Energy and Coastal Zone Acainistration Ca:ver. Cliffs :Nclear Power Plant Decartment of ';atural Resources Maryl and Routes 2 & -
, awes State Office Building Lusby, MD 20657 Annapolis, MD 21204 P00RORBlNAL
-