ML20004F165

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-443/81-05 & 50-444/81-05 on 810406-0508 & Notice of Violation
ML20004F165
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 05/26/1981
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Tallman W
PUBLIC SERVICE CO. OF NEW HAMPSHIRE
Shared Package
ML20004F166 List:
References
NUDOCS 8106160573
Download: ML20004F165 (2)


See also: IR 05000443/1981005

Text

.

naou

-.

,

<

A

UNITED STATES

I

j

NUCLEAR REGULATORY COMMISSION

E

REGION I

S

[

631 PARK AVENUE

%

,e

KING OF PRUSSIA, PENNSYLVANIA 194o6

Docket Nos. 50-443

MAY 2 61981

4 , t po,

50-444

,

b

Public Service Company of New Hampshire

!

1'

ATTN: Mr. W. C. Tallman

2

Q

_ ISg7

m

20

fe?

Chairman and Chief Executive Officer

i u%

M

1000 Elm Street

C

bD

Manchester, New Hampshire 03105

\\.

Gentlemen:

Subject:

Inspections 50-443/81-05; 50-444/81-05

This refers to the routine safety inspection conducted by Mr. A. Cerne of

this office on April 6-May 8, 1981 at the Seabrook Station, Units 1 and 2,

Seabrook, New Hampshire of activities authorized by NRC License Nos. CPPR-

135 and CPPR-136 and to the discussions of our findings held by Mr. Cerne

with Messrs. Singleton, philbrick and others of your staff at the conclusion

of the inspection.

Areas examined,during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, and

observations by the inspector.

Based on the results of this inspection, it appears that certain of your

activities were not conducted in full com?liance with NRC requirements, as

set forth in the Notice of Violation, enclosed herewith as Appendix A.

_

These items of noncompliance have been categorized into the levels described

in the Federal Register Notice (45 FR 66754) dated October 7,1980. You

are required to respond to this letter and in preparing your response, you

should follow the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosures will be placed in the NRC's Public Occument

Room.

If this report contains any information that you (or your contractors)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this lette'r of your intention to file a request for withholding;

and (b) submit within 25 days from the date of tqis letter a written application

to this office to withhold such information.

Consistent with section

Sk'8f

Q

SI{

.

810616067]

.. - - -.

-

. . - .

.

,.

26561

Public Service Company of New Hampshire 2

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is :laimed that the information should be

withheld from public disclosure. This section further requires the statement

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within the specified periods noted above, the report will be

placed in the Public Document Room. The telephone notification of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

-

. - , - _ _

,

Eld

J. Brunner, Chief, Projects

Bra 6ch #1, Division of Resident

and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office or Inspection and Enforcement Inspection

._

Report Numbers 50-443/81-05 and 50-444/81-05

cc w/encis:

John DeVincentis, Project Manager

.

,

-.

-

-

-

,.

. ..,. --

- - - - _ - -

- - _ - -

-