ML20004D849
| ML20004D849 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/06/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML20004D845 | List: |
| References | |
| NUDOCS 8106100212 | |
| Download: ML20004D849 (2) | |
See also: IR 05000348/1981006
Text
. _ _ _ _ _ -
.
_ - _ _ _ _ _ _ ,
.
.
,
[
UNITED STATES
o
'
. 8
k
NUCLEAR REGULATORY COMMISSION
REGION 11
'
$
r[f
101 MARIETTA ST., N.W.. SUITE 3100
-
o,
ATLANTA, GEORGIA 30303
n,,,,
o)
(' '
-
APR 0 61981
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nue: lear Generation
P. O. Box 2641
Birmingham, AL,35291
Gentlemen:
Subject: Report No. 50-348/81-06
This refers to the special inspection conducted by W. H. Miller, Jr., of this
office on March 10-13, 1981, of activities authorized by NRC License No. NPF-2
for the Farley facility. Our preliminary findings were discussed with W. G.
Hairston, III at the conclusion of the inspection.
Areas examin ed during the inspection and our findin% are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
.
Within the scope of this inspection, no violations were disclosed.
During the inspection it was found that certain activities under your license
appear to deviate from commitments to the Commission and have safety signifi-
cance. This item is identified in the Notice of Deviation enclosed herewith as
Appendix A.
Please provide us in writing your comments including a description
of corrective actions that have been or will be taken, corrective actions which
will be taken to avoid further deviations, and the date your cor-ective actions
will be completed.
We have examined actions you have taken with regard to previously identified
enforcement matters and unresolvea items. The status of these items is discussed
in the enclosed report.
Three new unresolved items are identified in the enclosed inspection report.
These items will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Roem.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary information
should ba contained in a separate part of the document.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
t
810 610 0.2/J--
r
- 1
APR 0 6 7961
.
'
l
]
Alabama Power Company -
2
~
~Should you have any questions concerning this lette , we will be glad to discuss
+
them with you.
!
'
Sincerely,
[
J'
,- m
Lewyy, Acting Director
a.
o.
Division 6F Resident and
Reactor Project Inspection
-
Enclosures:
1.
Appendix A, Notice of Violation
-
2.
Inspection Report No. 50-348/81-06
cc w/ enc 1:
l
W. O. Whitt, Executive Vice President
F. L. Clayton, Jr. , Senior Vice President
H. O. Thrash, Manager-Nuclear Generation
0. D. Kingsler, Jr., Manager, Nuclear Engineering
and Technhal Services
t
J. W. McGowan, Manager-Operations
Quality Assurance
W. G. Hairston, III, Plant Manager