MONTHYEARML19309B0301978-01-20020 January 1978 Forwards Completed NRC 771228 Questionnaire Re Standby Diesel Generators & Addl Info About Util Insp Procedures. Sp 206.03B, Diesel Generator B Synchronization Surveillance Test, Encl Project stage: Other ML20244B5561978-01-31031 January 1978 Forwards Questionnaire Completed by Tv Greene Re Diesel Generator Per NRC Project stage: Other ML20004C2551981-05-22022 May 1981 Requests Extension Until 810617 to Ensure Thorough Assessment of Existing/Planned Emergency Procedures for Blackouts & Training Per NRC 810225 Request Project stage: Other ML20004D4741981-06-0101 June 1981 Comments on NRC 810225 Request Re Licensee Review of Station Blackout Events.Total Loss of Ac Power Was Not Considered as Dba.Specific Procedures & Operator Training in Prescribed Course of Action Are Not Necessary Project stage: Other ML20004D1471981-06-0202 June 1981 Memo to Operating Reactor & Licensing Project Managers Re NRC Review of Emergency Procedures & Training for Station Blackout.Licensee 90-day Responses to Generic Ltr 81-04 Should Be Provided Project stage: Approval ML19350E2121981-06-15015 June 1981 Forwards Station Blackout Rept, in Response to 810225 Generic Ltr 81-04 Re Emergency Procedures & Training for Station Blackout Events.Extension of Implementation Schedule Per NUREG-0737 Emergency Procedures Requested Project stage: Other ML19350E2211981-06-17017 June 1981 Station Blackout Rept Project stage: Other ML20009C3571981-07-0909 July 1981 Forwards Questionnaire Re Unresolved Safety Issue A-44 Concerning Station Blackout.Requests Response & Review of Encl LER Documentation within 90 Days to Allow NRC to Meet Schedule Requirements for Resolution of Issue Project stage: Approval ML20009H1811981-07-21021 July 1981 Requests That Encl Tabular Questionnaire Be Completed,In Support of Resolution of Unresolved Safety Issue A-44 Re Station Blackout & Reliability of Onsite Standby Diesel Generators.Ler Documentation Docketed for Facility Encl Project stage: Approval ML20010E3231981-08-26026 August 1981 Informs That Util Response to Generic Ltr 81-04 Re Emergency Procedures & Training for Station Blackout Events Has Been Reviewed.Implementation Schedule Acceptable Project stage: Other ML20031B6161981-09-29029 September 1981 Responds to NRC 810903 Request for Addl Actions Re Station Blackout Procedures & Training.Plant Training Dept Will Issue Procedures to Operations Personnel Before End of Sept. Special Blackout Training Will Be Conducted by 811115 Project stage: Request ML20031F2931981-10-0909 October 1981 Forwards Diesel Generator Reliability Info Re Unresolved Safety Issue A-44,Station Blockout, Per NRC 810709 Request Project stage: Other ML20031F3011981-10-0909 October 1981 Diesel Generator Reliability Info Re Unresolved Safety Issue A-44,Station Blackout Project stage: Other ML20032C8161981-10-30030 October 1981 Requests Addl 60 Days to Respond to 810721 Info Request Re Unresolved Safety Issue A-44,station Blackout.Due to 810813 Turbine Damage,Engineering Effort Has Been Directed Toward Getting Unit Back in Svc Project stage: Other ML20040C2601982-01-20020 January 1982 Forwards Tables 1,2 & 3 of Diesel Generator Operations Data for CY76-80,in Response to NRC 810721 Request for Info Re Unresolved Safety Issue A-44 Concerning Station Blackout Project stage: Request ML20041C0511982-02-0808 February 1982 Informs That Implementation Schedule for Emergency Procedures & Training for Station Blackout Events Provided in Util 810929 Response to Generic Ltr 81-04 Is Acceptable Project stage: Other ML20028B1951982-11-24024 November 1982 Commits to Review of Current Training Program to Determine Requirements for Addl Matl Re Emergency Procedures & Training for Station Blackout Events Project stage: Other ML20195G2821988-06-16016 June 1988 Responds to 880322 Request Re Status of Various Safety Issues.Thirty Issues Involve Tech Spec Amends for Which NRC Requesting Confirmation That Amends Have Been Implemented. Status of Issues Shown on Encl List Project stage: Other 1981-06-02
[Table View] |
Similar Documents at Hatch |
|---|
|
Text
. ____._._
Georgia Power Comowy 333 P ecrror t Ave %e Avanta, Georg a 30308 Teteoncre 404 5264526 Va hng Accress P:st omce Son 4545 A:!ama. Georgia 30302 GeorgiaPower Power oeneration Departr.ient ch k 19p /*
. Mt
<,r
? [*
h
\\\\
Director of Nuclear Reactor Regulation t
f,,[,__ JUN 01198W U. S. M3 clear Regulatory Commission 42 Washington, D. C.
20555
- .*a soawJaeles u.a - m M1C 00CKETS 50-321, 50-366 5
f OPERATING LICENSES CPR-57, NPF-5 d
EDWIN I. HATCH NUCLEAR PLANT UNITS 1, 2 to PROCEDURES FOR STATION BLACKOUT Gentlenen:
Georgia Power Coropany is currently reviewing our existing emergency procedures as requested bf your letter of February 25, 1981.
In order to ensure a thorough assessment of our existing and planned precedures and training for this event, we request an extension until June 17, 1981, for submittal of the 90-day response as outlined in your letter.
This has been discussed with the Hatch Licensing Project Manager.
- Evaluations to date indicate that existing procedures address many of the ccncerns identified.
In addition, the 'systen grid which supplies offsite power to Plant Hatch is historically stable, with six separace lines feeding the switchyard.
- Thus, an extremely low probability for this event exists at Plant Hatch.
Thank you for your consideration Jn this matter.
Sincerely, 0
=N J. T. Beckham, Jr.
REB /mb xc: Mr. Max Manry Mr. R. F. Rogers, III