ML20004C003

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-361/81-10 on 810511-14.No Noncompliance Noted
ML20004C003
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 05/27/1981
From: Crews J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20004C004 List:
References
NUDOCS 8106010398
Download: ML20004C003 (2)


See also: IR 05000361/1981010

Text

.

-

,

ruz

-

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

.o

$

,E

REGION V

o

g

1990 N. CALIFORNIA BOULEVARD

g o , * ,e

SUITE 202, WALNUT CREEK PLAZA

s

WALNUY CREEK, CALIFORNIA 94508

May 27, 1981

Docket No. 50-361

-

Southern California Edison Company

P. O. Box 800

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention: Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection of San Onofre Unit No. 2

This refers to the inspection conducted by Mr. T. Young Jr. of this office

on May 11-14, 1981, of activities authorized by NRC Construction Permit

No. CPPR-97, and to the discussion of our findings held by Mr. Young with

Mr. Nunn and other members of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the enclosed inspection

report. Within these areas, the inspection consisted of selective examinations

of procedures and representative records, interviews with personnel, and

'

observations by the inspectors.

No items of noncompliance with NRC requirements were identified within the

scope of this inspection.

,

In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the

NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure

under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office

,

by telephone within ten (10) days from the date of this letter of your

l

intention to file a request for withholding; and (b) submit within 25

days from the date of this letter a written application to this office

to withhold such information. If your receipt of this letter has been

,

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be established.

l

l

,

,

81060103%

Q

.

- .

. - .

-

-.

.-

. .

.

.. ..

-. -. --

..

.-_ _ _

.

.

Southern California Edison Company

-2-

May 27, 1981

Consistent with section 2.790(b)(1), any such application must be accompanied

by an affidavit executed by the owner of the information which identifies

the document or part sought to be withheld, and which contains a full

statement of the reasons on the basis which it is claimed that the

information should be withheld from public disclosure. This section

further requires the statement to address with specificity the considerations

listed in 10 CFR 2.790(b)(4). The information sought to be withheld

shall be incorporated as far as possible into a separate part of the

affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document

Room.

Should you have any questions concerning this inspection, we will be

glad to disuss them with you.

Sincerely,

l

r

ef

'

eactor Operations Projects Branch

Enclosure:

IE Inspection Report

No. 50-361/81-10

cc w/o enclosure:

1

R. Dietch, Vice President

Nuclear Engineering & Operations

,

,

v

- -

-

-

--

-