| Person / Time | |
|---|---|
| Site: | San Onofre |
| Issue date: | 05/27/1981 |
| From: | Crews J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Papay L SOUTHERN CALIFORNIA EDISON CO. |
| Shared Package | |
| ML20004C004 | List: |
| References | |
| NUDOCS 8106010398 | |
| Download: ML20004C003 (2) | |
See also: IR 05000361/1981010
Text
.
-
,
ruz
-
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
.o
$
,E
REGION V
o
g
1990 N. CALIFORNIA BOULEVARD
g o , * ,e
SUITE 202, WALNUT CREEK PLAZA
s
WALNUY CREEK, CALIFORNIA 94508
May 27, 1981
Docket No. 50-361
-
Southern California Edison Company
P. O. Box 800
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention: Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject: NRC Inspection of San Onofre Unit No. 2
This refers to the inspection conducted by Mr. T. Young Jr. of this office
on May 11-14, 1981, of activities authorized by NRC Construction Permit
No. CPPR-97, and to the discussion of our findings held by Mr. Young with
Mr. Nunn and other members of your staff at the conclusion of the inspection.
Areas examined during this inspection are described in the enclosed inspection
report. Within these areas, the inspection consisted of selective examinations
of procedures and representative records, interviews with personnel, and
'
observations by the inspectors.
No items of noncompliance with NRC requirements were identified within the
scope of this inspection.
,
In accordance with 10 CFR 2.790 of the Comission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the
NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure
under 10 CFR 9.5(a)(4), it is necessary that you (a) notify this office
,
by telephone within ten (10) days from the date of this letter of your
l
intention to file a request for withholding; and (b) submit within 25
days from the date of this letter a written application to this office
to withhold such information. If your receipt of this letter has been
,
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be established.
l
l
,
,
81060103%
Q
.
- .
. - .
-
-.
.-
. .
.
.. ..
-. -. --
..
.-_ _ _
.
.
Southern California Edison Company
-2-
May 27, 1981
Consistent with section 2.790(b)(1), any such application must be accompanied
by an affidavit executed by the owner of the information which identifies
the document or part sought to be withheld, and which contains a full
statement of the reasons on the basis which it is claimed that the
information should be withheld from public disclosure. This section
further requires the statement to address with specificity the considerations
listed in 10 CFR 2.790(b)(4). The information sought to be withheld
shall be incorporated as far as possible into a separate part of the
If we do not hear from you in this regard within the specified
periods noted above, the report will be placed in the Public Document
Room.
Should you have any questions concerning this inspection, we will be
glad to disuss them with you.
Sincerely,
l
r
ef
'
eactor Operations Projects Branch
Enclosure:
IE Inspection Report
No. 50-361/81-10
cc w/o enclosure:
1
R. Dietch, Vice President
Nuclear Engineering & Operations
,
,
v
- -
-
-
--
-