Letter Sequence Other |
|---|
|
|
MONTHYEARML19260A0041979-10-11011 October 1979 Advises of NRC Requirements for Auxiliary Feedwater Sys. Generic & plant-specific Requirements Encl Project stage: Other ML19210D0331979-11-15015 November 1979 Forwards Response to Re NRC Requirements for Auxiliary Feedwater Sys.Refueling Shutdown Will Commence on 791201.Some Testing Recommendations Will Not Be Scheduled Until Startup Testing Performed Project stage: Other ML19210E6511979-11-30030 November 1979 Forwards Results of Analysis & Info Re Response of Containment Pressure to Steam Break Accident Inside Containment W/Extended Auxiliary Feedwater Flow to Affected Steam Generator Project stage: Other ML19256G1081979-12-18018 December 1979 Notifies That Requested Info Re Auxiliary Feedwater Sys Automatic Initiations & Flow Indications to Steam Generators Was Provided During 791213 Site Visit Project stage: Other ML19294B2131980-01-22022 January 1980 Forwards Request for Addl Info & Positions Re NRC Requirements for Auxiliary Feedwater Sys.Licensee Must Provide Info That Describes How Auxiliary Feedwater Automatic Initiation Sys Signals Meet Requirements Project stage: RAI ML19309A8821980-03-25025 March 1980 Forwards Response to NRC 800122 Request for Addl Info Re Requirements for Auxiliary Feedwater Sys.Complete Response Not Available Until Completion of Engineering Evaluation Project stage: Request ML19323A5031980-04-14014 April 1980 Forwards Revised Tables 1B-1,2-1 & 3-1 to Util 800325 Response Re Auxiliary Feedwater Sys Project stage: Other ML19323C5621980-05-14014 May 1980 Application for Amend 46 to Ol,Providing Proposed Tech Spec Changes.Revisions Include Addition of safety-related Hydraulic Snubbers to Table 3.7-4 & Mod of Surveillance Requirements for Auxiliary Feedwater Sys.Affidavit Encl Project stage: Request ML19338E8451980-09-30030 September 1980 Forwards Addl Info on Auxiliary Feedwater Sys,In Response to NRC 800122 Request Project stage: Other ML20037C8521981-02-0707 February 1981 Forwards Safety Evaluation of Licensee Implementations of NRC 791011 Recommendations for Auxiliary Feedwater Sys. Responses Satisfy NRC Requirements,W/Exception of Five Items Project stage: Approval ML19343C4351981-03-20020 March 1981 Application for Amend 59 to License DPR-66,changing App a Tech Specs to Ensure Redundancy of Auxiliary Feedwater Flow During Normal & Accident Conditions.Class III Fee Encl Project stage: Request ML19350C8251981-03-27027 March 1981 Informs That Auxiliary Feedwater Sys Can Provide Required Flow for Feedline Rupture & for Main Steam Line Break Inside Containment W/O Operator Intervention for 10 Minutes Project stage: Other ML20004B9001981-05-22022 May 1981 Forwards Rept, Auxiliary Feedwater Pumps Presently Installed at Beaver Valley Power Station,Unit 1 Project stage: Other ML20009F7371981-07-21021 July 1981 Responds to 810715 Telcon Requesting Util Position Re Primary Plant Demineralized Water Storage Tank Level Transmitters.Both Transmitters Are Seismically Qualified & Powered from Vital Bus 2.No Need to Modify Power Supply Project stage: Other ML20039D5731981-12-30030 December 1981 Provides Info Re NUREG-0737 Items Scheduled for Implementation on 820101.Mods Requiring Station Shutdown Will Be Completed During Second Refueling Outage Scheduled 821225 Project stage: Other ML20058D0301982-07-21021 July 1982 Submits Results of Evaluation Re Potential for Damage to Auxiliary Feedwater Pumps Due to Operation at Runout Flow for 30 Minutes.Pump Would Not Be Damaged.Evaluation Based on 10-minute Run Test Data Project stage: Other ML20062H2211982-08-0404 August 1982 Informs That Review of Responses to IE Bulletin 80-04, Main Steam Line Break W/Continued Feedwater Addition, Complete. Analysis Acceptable Project stage: Approval 1980-09-30
[Table View] |
Text
.-
'Af sta 4se-sooo
==.-
,,m May 22, 1981 Director of Nuclear Reactor Regulation United States Nutlear Regulatory Commission p\\ 8 ' A Attn:
Mr. Steven A. Varga, Chief Operating Reactors Branch No. 1 Division of Licensing
)s Washington, DC 20555
UI.l
.q..,
s
Reference:
Beaver Valley Power Station, Unit No. 1 7
O)38Ib fy D,p g Docket No. 50-334, License No. DPR-66 Report - Auxiliary Feedwater Pumps i%
. g~4 p,
Gentlemen-4 Enciosed are four (4) copies of a report on the " Auxiliary Feedwater Pumps" as requested by your letter of October 11, 1979. This report describes the test results and conclusions of the tests performed on the Auxiliary Feed-Water Pumps after refueling to aseure the long term operability of the pumps.
We believe that the Auxiliary Feedwater Pumps are fully capable of performing their design function and will provide long term reliable operation if and when required.
If you have any questions, please contact my office.
Very tru
- yours,
/
L j
J.
Carey Vice President, Nuclear cc:
D. A. Beckman, Resident Inspec. tor United Stae.es Nuclear Regulatory Commission Beaver '.' alley Power Station Shippingport, PA 15077 United States Nuclear Regulatory Commission c/o Document Management Branch Washington, DC 20555 I
al I(,s
!8106 010 N O
l t
--