Text
7.ZG
c
4
UNITED STATES
g
})g
NUCLEAR REGULATORY COMMISSION
7'i*
E
REGIO *l IV
m
k,
p
611 RYAN PLAZA DRIVE. SulTE 1000
ARUNGToN. TEXAS 78011
,
,,
In Reply Refer To:
March 20, 1981
i
'
RIV
Docket No. 50-445/Rpt. 81-02
Docket No. 50-446/Rpt. 81-02
Texas Utilities Generating Company
ATTN: Mr. R. J. Gary, Executive Vice
President and General Manager
2001 Bryan Tower
Dallas, Texas 75201
Gentlemen:
'
This refers to the inspection conducted by our Resident Reactor Inspector,
Mr. R. G. Taylor, during February 1981, of activities authorized by NRC
Construction Pennits No. CPPR-126 and No. CPPR-127 for the Comanche Peak
facility, Units No.1 and No. 2, and to the discussion of our findings with
Mr. R. G. Tolson and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records, interviews
with personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your
license appear to be in violation of Appendix B to 10 CFR Part 50 of the
NRC Regulation, " Quality Assurance Criteria for Nuclear Power Plants."
The Notice of Violation for the violation reported in the enclosed
inspection report was forwarded to you by our letter, dated February 25,
1981; therefore, this letter does not require further response regarding
this matter.
One new unresolved item is discussed in paragraph 6 of the enclosed report.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If the
report contains any information that you believe to be proprietary, it is
necessary that you submit a written application to this office, within 25 days
of the date of this letter, requesting that such information be withheld from
public disclosure. The application must include a full statement of the reasons
why it :s claimed that the information is proprietary. The application should
be prepared so that any proprietary information identified is contained in an
enclosure to the application, since the application without the enclosure will
also be placed in the Public Document Room.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
(
8105080 @ 7
-
.
.
-.
.
-
.
- _ .
.
.
. -
._
.
-
-
-
.
.
Texas Utilities Generating Company
2
March 20, 1981
Should you have any questions concerning this inspection, we will be pleased
to discuss them with you.
Sincerely,
.
,$
'
M'
' (C
_
W.Chdle, Chief
Engineering Inspection Branch
9
Enclosure:
IE Inspection Report
50-445/81-02; 50-466/81-02
cc: w/ enclosure
Texas Utilities Generating Company
ATTN: Mr. H. C. Schmidt, Project. Manager
2001 Bryan Tower
Dallas, Texa
75201
.