Forwards IE Insp Repts 50-445/81-02 & 50-446/81-02 During Feb 1981
ML20003J174
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/20/1981
From: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Gary R
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
Shared Package
ML20003J175 List:
References
NUDOCS 8105080533
Download: ML20003J174 (2)


See also: IR 05000445/1981002

Text

7.ZG

c

4

UNITED STATES

g

})g

NUCLEAR REGULATORY COMMISSION

7'i*

E

REGIO *l IV

m

k,

p

611 RYAN PLAZA DRIVE. SulTE 1000

ARUNGToN. TEXAS 78011

,

,,

In Reply Refer To:

March 20, 1981

i

'

RIV

Docket No. 50-445/Rpt. 81-02

Docket No. 50-446/Rpt. 81-02

Texas Utilities Generating Company

ATTN: Mr. R. J. Gary, Executive Vice

President and General Manager

2001 Bryan Tower

Dallas, Texas 75201

Gentlemen:

'

This refers to the inspection conducted by our Resident Reactor Inspector,

Mr. R. G. Taylor, during February 1981, of activities authorized by NRC

Construction Pennits No. CPPR-126 and No. CPPR-127 for the Comanche Peak

facility, Units No.1 and No. 2, and to the discussion of our findings with

Mr. R. G. Tolson and other members of your staff at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted

of selective examination of procedures and representative records, interviews

with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in violation of Appendix B to 10 CFR Part 50 of the

NRC Regulation, " Quality Assurance Criteria for Nuclear Power Plants."

The Notice of Violation for the violation reported in the enclosed

inspection report was forwarded to you by our letter, dated February 25,

1981; therefore, this letter does not require further response regarding

this matter.

One new unresolved item is discussed in paragraph 6 of the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 25 days

of the date of this letter, requesting that such information be withheld from

public disclosure. The application must include a full statement of the reasons

why it :s claimed that the information is proprietary. The application should

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

(

8105080 @ 7

-

.

.

-.

.

-

.

- _ .

.

.

. -

._

.

-

-

-

.

.

Texas Utilities Generating Company

2

March 20, 1981

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

.

,$

'

M'

' (C

_

W.Chdle, Chief

Engineering Inspection Branch

9

Enclosure:

IE Inspection Report

50-445/81-02; 50-466/81-02

cc: w/ enclosure

Texas Utilities Generating Company

ATTN: Mr. H. C. Schmidt, Project. Manager

2001 Bryan Tower

Dallas, Texa

75201

.