ML20003H228
| ML20003H228 | |
| Person / Time | |
|---|---|
| Site: | Bellefonte |
| Issue date: | 03/18/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parris H TENNESSEE VALLEY AUTHORITY |
| Shared Package | |
| ML110870763 | List: |
| References | |
| NUDOCS 8105050371 | |
| Download: ML20003H228 (2) | |
See also: IR 05000438/1981007
Text
/
o
UNITED STATES
- ,,
!
NUCLEAR REGULATORY COMMISSION
o
O"
I
REGION 11
\\
101 MARIETTA ST., N.W.. SUITE 3100
,
ATLAN TA. GEORGIA 30303
.....
MAR 18 08I
Tennessee Valley Authority
ATTN:
H. G. Parris
Manager of Power
500A Chestnut Street Tower II
Chattanooga, TN 37401
.
Gentlemen:
1
Subject: Report Nos. 50-438/81-07 and 50-439/81-07
This refers to the routine safety inspection conducted by J. D. Wilcox, Jr., of
this office on January 31 - February 28, 1981, of activities authorized by NRC
Construction Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility. Our
preliminary findings were discussed with W. R. Dahnke at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedJres and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your licensa
appear to violate NRC requirements.
This item and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
Three new unresolved items are identified in the enclosed inspection report.
These items will be examined during subseouent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Titie
10, Code of Federal Regulations, a copy of this letter and the enclosed inspec-
tion report will be placed in the NRC Public Document Room.
If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 days to this office to withhold such
information from public disclosure. Any such application must include the basis
for claiming that the information is proprietary and the proprietary information
should be contained in a separate part of the document. If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Roem.
h/6f6fD N /
l
i
, _ _--
- . . . _ _
_ _ _ - _ ,
_
_ ,
.
. .
-
-
.
.
.
&
1
Tennessee Valley Authority
2
MAR 1 8 981
.
Should you have any questions concerning this letter, we will be' glad to discuss
them with you.
Sincerely,
[R.C.
.47.
s, Acting Director
Divis on of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report' Nos. 50-438/81-07
50-439/81-07
cc w/ enc 1:
A. M. Qualls, Plant Superintendent
!
W. R. Dahnke, Project Manager
D. L. Terrill, Project Engineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief, Nuclear Safety
Review Staff
H. J. Green, Division Director-
.
- - - - -
-
.
-