ML20003H005

From kanterella
Jump to navigation Jump to search
Forwards Request for Addl Info for Review of Leak Detection Sys on Emergency Condenser Piping on 75-ft Elevation of Reactor Bldg.Cites Discussion at 810325 Meeting
ML20003H005
Person / Time
Site: Oyster Creek
Issue date: 04/16/1981
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
References
TASK-03-05.B, TASK-3-5.B, TASK-RR LSO5-81-04-026, LSO5-81-4-26, NUDOCS 8105040526
Download: ML20003H005 (3)


Text

-

.i

,,(pa arroyjo,,

UNITED STATES NUCLEAR REGULATORY COMMISSION 3

o g

j WASHINGTON, D. C. 20555 April 16,1981 Docket No. 50-219 e

to LS0-581-04-026 Lt.os-rct-$ 4 - 4W O

D 7

Mr. I. R. Finfrock, Jr.

2

]

Vice President M

Jersey Central Power & Light Company C " 3. NRggIS8/Ah Mfgrg Post Office Box 388

\\

Forked River, New Jersey 08731 e

t

Dear Mr. Finfrock:

N=

6 RE: SEP TOPIC III-5 B. Pipe Break Outside Containment (0yster Creek Nuclear Generating Station)

Your letter dated October 6,1980, proposed the installation of a leak detection system on the emergency condenser piping on the 75 foot elevation of the reactor building. Your proposed plant modification is in response to our letter of July 10, 1980 which requested that you provide a schedule for modifications to provide adequate pro-tection against postulated high energy line breaks for this piping.

We are continuing our review of this subject and find that additional information described in the enclosure to this letter is needed. We request your response within 30 days of your receipt of this letter.

The information contained in the enclosure was discussed with your representative at a meeting on March 25, 1981.

Sincerely, Dennis M. Crutchfield, ief Operating Reactors Branch #5 Division of Licensing l

Enclosure:

j Request for Additional r

Information I

cc w/ enclosure:

See next page 1

8105040526 f

e Mr. I. R. Fi nf rock, J r. April 16,1981 cc G. F. Trowbridge, Esquire Gene Fisher Shaw, Pittman, Potts and Trowbridge Bureau Chief 1800 M Street, N. W.

Bureau of Radiation Protection Washington, D. C.

20036,

380 Scotts Road Trenton, New Jersey 08628 GPU Service Corporation AfiN: Mr. E. G. Wallace Ccmmissioner Licensing Manager New Jersey Department of Energy 260 Cherry Hill Rcad 101 Commerce Street Parsippany, New Jersey 07054 Newark, New Jersey 07102 Natural Resources Defense Council Plant Superintendent 91715th Street, N. W.

Oyster Creek Nuclear Generating '

Washington, D. C.

20006 Station P. O. Box 388 Forked River, New Jersey 08731 Steven P. Russo, Esquire O'S 'r!ashington Street Resident Inspector P. O. Box 1060 c/o U. S. NRC Tons River, New Jersey 08753 P. O. Box 445 Forked River, New Jersey 08731 Joseph W. Ferraro, Jr., Esquire Deputy Attorney General Director, Criteria and Standards i

State of New Jersey Division Department of Law and Public Safety Office of Radiatjen Prograns 1100 Raymond Boulevard (ANR-460)

Newark, New Jersey 07012 U. S. Environmental Prctection Agency 4

Ocean County Library Washington, D. C.

20460 Brick Township Branch 401 Chambers Bridge Road U. S. Environmental Protection Brick Town, New Jersey 08723 Agency Region II Office Mayor ATTN: EIS COORDINATOR Lacey Township 26 Federal Plaza P. O. Box 475 New York, New York 10007 Forked River, New Jersey 08731 Ccanissioner Department of Public Utilities State of New Jersey 101 Commerce Street Newark, New Jersey 07102 O

l REQUEST FOR ADDITIONAL INFORMATION s

High Energy Line Breaks Outside Containment (SEP logic III-5.B)

Emergency Condenser Piping on the 75 foot level of the reactor building 1.

Provide justification for not proposing barriers, separation, and/or installation of an isolation valve inside containment on the steam supply lines as methods for mitigating the effects of high energy line breaks for this piping.

2.

Provide a schedule for submitting analyses to demonstrate that if this piping does fail. " leak before break" would be the expected failure mode.

3.

The NRC staff position is that an augmented inservice inspection program must be instituted for those lines that rely on a leakage detection system to detect through wall leakage. Provide a schedule for submitting a proposed inservice inspection program.

l s

t i

t

,