Amend 47 to License DPR-35,adding Requirement to Maintain Guard Training & Qualification Plan Per 10CFR73.55b within 60 Days of Approval
ML20003E486
Person / Time
Site: Pilgrim
Issue date: 03/24/1981
From: Ippolito T
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20003E487 List:
References
NUDOCS 8104030608
Download: ML20003E486 (2)


Text

bq

+*

'o,,

UNITED STATES NUCLEAR REGL'LATORY COMMISSION

,e e

)'

w AsmNoTON, D. C. 20$55

\\*..../

BOSTON EDISON COMPANY DOCKET NO. 50-293 PILGRIM NUCLEAR POWER STATION UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 47 License No. DPR-35 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The filings (which are being handled by the Commission as an appli-cation) by the Boston Edison Company (.the licensee) dated August 18, 1979, May 27, 1980, September 18, 1980, and October 24,198L, comply with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Consnission's rules and regulations set forth in 10 CFR Chapter I; B.

The facility will operate in conformity with the filings, the provisions of the Act, and the rules and regulations of the Comission.

C.

There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the coninon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is H accordance with 10 CFR Part 51 of the Commiss*'on's regulations and all applicable requirements have been satisfied.

O O

8.104030 4

. 2.

Accordingly, FEl eity Operating License No. DPR-35 is hereby amended by combining, renumbering, and refonnating the existing Paragraphs 3.G (Security Plan) and 3.H (. ontingency Plan) and C

by adding a new Paragraph, all of which are to be numbered and are to read as follows:

3.G Physical Protection The licensee shall fully implement and maintain in effect all provisions of the following Commission approved documents, including amendments and changes made pursuant to the authority of 10 CFR 50.54(p):

(1) " Security Plan for the Pilgrim Nuclear Power Station,' dated November 7, 1977 with Revision 2 dated May 26,.1978 and Revision 3 dated January 8,1979.

(2) " Pilgrim Nuclear Power Station Safeguards Contin-gency Plan," dated April 5, 1979 and revised by letters dated December 20, 1979 and April 22, 1980, submitted pursuant to 10 CFR 73.40. The Contingency Plan shall be fully implemented, in accordance with 10 CFR 73.40(b), within 30 days of the approval by the Comission.

(.3) " Pilgrim Nu; lear Power Station Guard Training and Qualificati^n Plan," Revision 3, dated October 1980 includes pages dated August 18, 1979, May 28, 1980, and October 1,1980. This Plan shall be followed in accordance with 10 CFR 73.55(b)(4), 60 days after.

approval by the Comission. All security personnel, as required in the above plans, shall be qualified within two years of this approval. The licensee may make changes to this plan without prior Commission approval if the changes do not decrease the safeguards effectiveness of the plan. The licensee shall maintain records of and submit reports concerning such changes in the same manner as required for changes made to the.

Safeguards Contingency Plan pursuant to 10 CFR 50.54(p).

These approved documents consist of information withheld from public disclosure pursuant to 10 CFR 2.790(d).

3.

This license amendment is effective as of its date of issuance.

FOR THE NUCLEAR REGULATORY CO M ISSION

.71Yp

, Chief Operating Reactors Branch #2 Division of Licensing Date of Issuance: March 24 1981.