Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Repts 50-460/80-16 & 50-513/80-16
ML20003E008
Person / Time
Site: Washington Public Power Supply System
Issue date: 03/02/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mazur D
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20003E002 List:
References
NUDOCS 8104020042
Download: ML20003E008 (1)


See also: IR 05000460/1980016

Text

_

3

1

2 KEGg

.

.

o

UNITED STATES

A ,'() ",(

/ g

NUCLEAR REGULATORY COMMISSION

. ,,

g

E

REGION V

e '-

'8

1990 N. CALIFORNIA BOULEVARD

'V

SulTE 202. WALNUT CREEK PLAZA

o

  • ,,,e

WALNUT CREEK, CALIFORNIA 945%

,

MAR

21981

Docket Nos. 50-460

50-513

Washington Public Power Supply System

P. O. Box 968

Richland, Washington 99252

Attention: Mr. D. W. Mazur

WNP 1/4 Program Director

.

Reference: Letter from G. S. Spencer to R. L. Ferguson, NRC

Inspection at WNP 1/4 Site, dated January 8,1981

Thank you for your letter of February 3,1981, which providos your

response to the Notice of Violation contained in the referenced letter.

Your corrective actions will be verified during a future inspection.

I have noted in your letter of February 3,1981, that a more complete

response to Finding B will be submitted to the NRC on or before March 5,

1981.

Your cooperation with us is appreciated.

Sincerely,

D

Y1: -

B. F. Faulkenberry, hiefk

Reactor Constructi

Projects Branch

.