Forwards IE Insp Rept 50-206/81-02 on 810119-23.No Noncompliance Noted
ML20003C854
Person / Time
Site: San Onofre Southern California Edison icon.png
Issue date: 02/13/1981
From: Book H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20003C855 List:
References
NUDOCS 8103180586
Download: ML20003C854 (2)


See also: IR 05000206/1981002

Text

N

J'

%'n

8

UNITED STATES

NUCLEAR REGULATORY COMMISSION

U

E

REGION V

1990 N. CALIFORNIA BOULEVARD

o

SUITE 202. WALNUT CREE K PLAZA

so,e

WALNUT CR EE K. CALIFORNIA 94596

February 13, 1981

.

Docket No. 50-206

co

03

C

k ,.gD

p D)

Southern California Edison Company

-

P. O. Box 800

J g198

,.

' %,$, /g fjl

2244 Walnut Grove Avenue

%=

y

Rosemead, California 91770

9,

g

Attention:

Dr. L. T. Papay

g

Vice President, Advanced Engineering

-

m

Gentlemen:

Subject:

NRC Inspection - San Onofre Unit 1

This refers to the inspection conducted by Mr. G. P. Yuhas of this

office on January 19-23, 1981 of activities authorized by NRC License

No. DPR-13, and to the discussion of our findings held by Mr. G. P. Yuhas

with Mr. J. M. Curran and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, in-

terviews with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In- accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you believe to be

proprietary it is necessary that you submit a written application to

this office, within 20 days of the date of this letter, requesting that

such information be withheld from public disclosure. The application

must include a full statement of the reasons why it is claimed that the

information is proprietary. The application should be prepared so that

any proprietary information identified is contained in an enclosure to

the application, since the application without the enclosure will also

be placed in the Public Document Room.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

C3 0318 0 6D

Q-

.

.

Southern California Edison Company -2-

FEB 131981

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely,

.

f.

&

a

H. E. Book, Chief

Fuel Facility and Materials

Safety Branch

Enclosure:

IE Inspection Report

No. 50-206/81-02

cc w/o enclosure:

J. M. Curran, SCE

- R.'Dietch, Vice President.

Nuclear Engineering & Operations