Letter Sequence Approval |
|---|
|
|
MONTHYEARML20003B9721980-12-12012 December 1980 Requests Review of Reactor Sys Branch Position Re SRP 15.4.6 Acceptance Criteria on Procedures for Boron Dilution Event Project stage: Approval ML19343C5091981-03-13013 March 1981 Proposed Tech Specs Sections 2.1,2.3,3.5.2.4 & 5.3 Re Reactor Core Safety Limits,Limiting Safety Sys Settings, Protective Instrumentation,Quadrant Power Tilt & Reactor, Respectively Project stage: Other ML19343C5051981-03-13013 March 1981 Application for Amend 76 to License DPR-54,changing Tech Specs Sections 2.1,2.3,3.5.2.4 & 5.3 to Assure Operation of Cycle 5 Core within Fuel Design & Performance Criteria. Class III Amend Fee Encl Project stage: Request ML19343C9621981-03-31031 March 1981 Cycle 5 Reload Rept Project stage: Other ML20003E8381981-04-10010 April 1981 Forwards Addl Info Requested by NRC Re Facility Cycle 5 Reload Rept.Comparison of FSAR & Cycle 5 Accident Doses Encl Project stage: Other ML20008F6051981-04-17017 April 1981 Proposed Changes to Tech Specs 2.1 & 2.3 for Reactor Core Safety Limits & Limiting Safety Sys Settings Protective Instrumentation Project stage: Request ML20008F6031981-04-17017 April 1981 Application for Proposed Amend 76,Revision 1 to License DPR-54,assuring Operation of Facility Cycle 5 Core within Applicable Fuel Design & Performance Criteria Project stage: Request ML20003J0811981-04-23023 April 1981 Safety Evaluation Supporting Amend 33 to License DPR-54 Project stage: Approval ML20003J0791981-04-23023 April 1981 Amend 33 to License DPR-54,changing Operating Limits for Cycle 5 Operation & Approving Insertion of Four Axial Blanket Lead Test Assemblies Into Core Project stage: Other ML20003J0761981-04-23023 April 1981 Forwards Amend 33 to License DPR-54,safety Evaluation & Notice of Issuance & Availability Project stage: Approval ML20003J0821981-04-23023 April 1981 Notice of Issuance & Availability of Amend 33 to License DPR-54 Project stage: Other 1981-03-31
[Table View] |
Text
)
500I~l kb 8
8 j
NUCLEAR REGULATORY COMMISSION g
E WASHINGTON, D. C. 20556 a
- CCP/
December 12, 1980 to m
p p
n MEMORANDUM TO: Frank Schroeder, Acting Director
( n 4gggi e r Division of Safety Technology z gg0 ps ;9 FROM:
Thomas Novak, Assistant Director h v.5 Y' h
O for Operating Reactors, DL Y
SUBJECT:
APPLICATION OF SRP 15.4.6 ACCEPTANCE CRITERI iG OPERATING REACTORS.
In recent reload application reviews RSB has taken the position described in the last paragraph of Enclosure 1. (i.e. "It is our position that a positive means of alerting-the operator to a boron dilution event be installed in the control room as soon as practical.")
We request your review of this position as related to its safety significance and "back-fitting" implications for all PWRs.
& w>r Thomas Novak, Assistant Director for Operating Reactors, DL cc:
D. Eisenhut D. Ross P. Check T. Speiss S. Varga T. Ippolito R. Clark R. Reid D. Crutchfield l
f 81022609ey L _