ML19343C505

From kanterella
Jump to navigation Jump to search

Application for Amend 76 to License DPR-54,changing Tech Specs Sections 2.1,2.3,3.5.2.4 & 5.3 to Assure Operation of Cycle 5 Core within Fuel Design & Performance Criteria. Class III Amend Fee Encl
ML19343C505
Person / Time
Site: Rancho Seco
Issue date: 03/13/1981
From: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19343C506 List:
References
TAC-43369, NUDOCS 8103240395
Download: ML19343C505 (2)


Text

,

\\

tSMUD SACRAMENTO MUhlCIPAL UTILITY DISTRICT C 6201 S Street, Box 15830, Sacramento, Califomia 95813; (916) 452-3211 N

/

'b March 13, 1981 f

L gv 4 g3 D

Director of Nuclear Reactor Regulation Attention: Darrell G. Eisenhut, Director r

[.

8 Division of Licensing

/ vqn U. S. Nuclear Regulatory Commission Washington, D. C.

20555 Re: Docket 50-312 Rancho Seco Nuclear Generating Station, Unit No. 1 Proposed Amendment No. 76

Dear Mr. Eisenhut:

In accordance with 10 CFR 50.59, the Sacramento Municipal Utility District hereby proposes to amend its Operating License DPR-54 for Rancho Seco Nuclear Generating Station, Unit No. 1, by submitting forty (40) copies of Proposed Amendment No. 76.

The purpose of these revisions is to assure operation of the Rancho Seco Nuclear Generating Station, Unit No. 1, Cycle 5 core within applicable fuel design and performance criteria.

The proposed changes are shown in Attachment 1 as replacement pages for the Rancho Seco Nuclear Generating Station Technical Specifications:

2.1 SAFETY LIMITS, REACTOR CORE, Figure 2.1-2 2.3 LIMITING SAFETY SYSTEM SETTINGS PROTECTIVE INSTRUMENCATION, Figure 2.3-2 3.5.2.4 THE QUADRANT POWER TILE, Figures 3.5.2-1 through 12 5.3 REACTOR Also attached are Babcock & Wilcox Reports BAW-1667, " Rancho Seco Unit No. 1, Cycle 5 Reload Report" and BAW-1664, " Axial Blanket Lead Test Assembly Licensing Report".

The Reload Report includes a summary of Cycle 4 operating parameters and cont: tins the safety analyses supporting the operating of Lancho Seco Unit No. 1 Cycle 5 core at rated power in accordance with the Technical Specifications provided.

8108240 M5 i

AN ELECTRfC SYSTEV S E RVIN G MORE TH\\N 600.000 IN THE HEART OF C A ll F O R N I A

srjC l

4' C '

Darrell G. Eisenhut 2

March 13, 1981 i :

-The District considers this Amendment request to be defined under 10 CFR 170.22 Class Ill. The required fee of $4,000 for your prompt. review and approval is attached to this letter.

if you have any questions concerning this matter, please contact Mr. R. W. Colombo at the Rancho Seco Nuclear Plant.

i Respectfully submitted, John' Mattimoe Assistant General Manager and Chief Engineer JJM:RWC:rm Subscribed and sworn to before-me this 17th day of March, 1081.

OFFICIAL SEAL l

em:E PATRIC!A K.GEISLER

?iiij.f tote.u m;au-: ctt c.x:A
w.-

r.wun crms a l

ner.,u'uvo ccuary k9.Cememn D;.;u Ne.tmter 22.1983

..........................e

.e 7

Notary Public i

4 W -

4

  • i k

y

- ' - - +

-y-n y

p g

e --

4,--,

y w

, + -

+

w

+---