Forwards IE Insp Repts 50-277/80-28 & 50-278/80-20 on 800801-31 & Notice of Violation
ML20002C384
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 10/16/1980
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20002C380 List:
References
NUDOCS 8101100218
Download: ML20002C384 (3)


See also: IR 05000277/1980028

Text

'

.

j[

d ,f

UNITED ST ATES

e

,

t

NUCLEAR REGULATORY COMMisslON

[a-

5

4" I

o

REGION 1

$

631 P ARK AVENUE

,oNo or rausst A, PENNSYLV ANI A 19406

OCT 161980

Docket Nos. 50-277

50-278

Philadelphia Electric Company

ATTH: Mr. S. L. Daltroff

Vice President

Electric Production

2301 Market Street

Philadelphia, Pennsylvania 19101

Gentlemen:

Subject:

Combined Inspection 50-277/80-28 and 50-278/80-20

This refers to the routine inspection conducted by Messrs. A. R. Blough and C.

J. Cowgill of this office on August 1-31, 1980 at Peach Bottom Atomic Power

Station, Units 2 and 3, Delta, Pennsylvania of activities autho-ized by NRC

License Nos. DPR-44 and DPR-56 and to the discussions of our findings held by

Mr. Blough with Mr. W. T. Ullrich of your staff at the conclusion of the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, measurements made by the

inspector, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your activi-

ties were not conducted in full compliance with NRC requirements, as set forth

in the Notice of Violation, enclosed herewith as Appendix A.

These items of

noncompliance have been categorized 'nto the levels as described in our corres-

pondence to you dated December 31, i974.

This notice is sent to you pursuant to

the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2. Title

10, Code of Federal Regulations.

Section 2.201 requires you to submit to this

office, within twenty (20) days of your receipt of this notice, a written state-

(1) corrective steps which have been

ment or explanation in reply including:(2) corrective steps which will be taken

taken by you and the results achieved;

to avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

Since Items B and C of the Appendix A Notice of Violation enclosed with this

letter have been corrected as noted in the enclosed inspection report, your

response to this letter need not address those items.

Item A of Appendix B in the Notice of Violation enclosed with this letter was

identified during a previous inspection of your licensed activities on December

18, 1979 and was documented in an enclosure to our letter dated April 21, 1980.

Your letter to this office dated May 12, 1980 stated that the responsible individ-

uals had been counse'ed and that vehicular control was to receive additional

f!O

,

l

.-_ --

_=

-

.

. _ -.

-.

- ._ .

-_ .

- - .

.

'

l

Philadelphia Electric Company

2

OCT 161980

,

!

emphasis in site training programs.

From our August 14, 1980 inspection it

appears that the stated corrective actions were not effective since this item

l

has recurred.

Recurrent and uncorrected items of noncompliance are given addi-

i

tional weight in the consideration and selection of appropriate enforcement

action. Therefore, ir. your response to this letter, you should give particular

attention to those actions taken or planned to ensure that identified items of

noncompliance will not recur.

During the period covered by this inspection, your responses to IE Bulletin 80-

17 dated August 14, 1980 and August 21. 1980 were received.

The results of the

tests conducted, along with those received from other licensees, are currently

under review by the NRC.

Regarding the prompt notification requirements of the

subject Bulletin, this letter confirms your comitment to comply with the prompt

notification requirement of Item 6.a of the Bulletin in accordance with the

telephone conversations on August 20, and August 22, 1980, between Mr. W. T.

Ullrich of your staff and Mr. A. R. Blough of this office.

If our understanding

of this conmitment is not correct, please contact Region I.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10. Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room.

If this report contains

any infomation that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure.

Any such application must be

accompanied by an affidavit executed by the owner of the information, which

identifies the document or part sought to be withheld, and which contains a

statement of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b) (4) of Section

2.790. The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you in

-

this regard within the specified period, the report will be placed in the Public

Document Room.

',

Additionally, and in accordance with Section 2.790(d) of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, documentation of

findings of your control and accounting procedures for safeguarding special

nuclear materials and your facility security measures for physical protection

are deemed to be commercial or financial infonnation within the meaning of 10 CFR 9.5(a)(4) and shall be subject to disclosure only in accordance with the

provisions of 10 CFR 9.12; therefore, the pertinent section of the enclosed

inspection report and Appendix B. will not be placed in the Public Document Room

and will receive limited distribution.

.

. -

- . .

_ _ =.

_.

_ . _ - -

_-_.

.

_

._. - _ - - .- .

. _ - .

-- . _ .

-

- . .

- _ .

1

'

1

007 1 8 1980

Philadelphia Electric Company

3

Should you have any questions concerning this inspection, we will be pleased to

,

j

discuss them with you.

Sincerely,

l

}

f

.o x

don

. Brunner, Chief

l

'

Reactor Operations and Nuclear

l

Support Branch

!

Enclosures:

l

1.

Appendix A, Notice of Violation

,

!

2.

Combined Office of Inspection and Enforcement Inspection

i

i

Report Number 50-277/80-28 and 50-278/80-20 (Contains 2.790 Info)

3.

Appendix B, Notice of Violation (Contains 2.790 Info)

l

cc:

!

W. T. Ullrich, Station Superintendent (Without Page 13 of Report and Appendix

B)*

!

l

Troy B. Conner, Jr., Esauire (Without Report) (Without Appendix B)*

Eugene Bradley, Esquire (Without Report) (Without Appendix B)*

Raymond L. Hovis, Esauire (Without Report) (Without Appendix B)*

Michael J. Scibinico,

I', Assistant Attorney General (Without Report) (Without

,

Appendix B)*

  • Contains 2.790 Information