Forwards IE Insp Repts 50-413/80-27 & 50-414/80-27 on 800929-1003.No Noncompliance Noted
ML20002B459
Person / Time
Site: Catawba  
Issue date: 10/27/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20002B455 List:
References
NUDOCS 8012110618
Download: ML20002B459 (2)


See also: IR 05000413/1980027

Text

7_

';

,

L.s'

/

o

UNI!ED STATES

[

~,{

NUCLEAR REGULATORY COMMISSION

,

,

-

- r

REGION 11

h

101 MARIETTA sT.. N.W., sulTE 3100

ATLANTA, GEORGI A 30303

  • ~*

OCT 2 71980

In Reply Refer To:

RII:JRH

50-413/80-27

50-414/80-27

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice ' cesident, Steam Production

P. G. Box 21,8

Charlotte, NC 28242

Gentlemen:

This refers to the inspection conducted by J. R. Harris of this office on

September 29 - October 3,

1980, of activities authorized by NRC Construction

Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility and to the discussion

of our findings held with D. G. Beam at the conclusion of tue inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items. The status of these items is discussed in the enclosed report.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) bclieve to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any ouch

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the si> :ified period, the report will be placed in the Public Document Room.

Shoula you have any questions concerning this letter. we will be glad to discuss

them with you.

Sincerely,

il

1

C. E. Murphy, Chief

Reactor Constructica and Engineering

Support Branch

Enclosure:

(See Page 2)

801211ol0 T

_

,

Duke Power Company

-2-

'

0M 2 713G

Enclosure:

Inspection Report Nos. 50-413/80-27

and 50-414/80-27

cc w/ encl:

J. W. Hampton, Station Manager

D. G. Beam, Project Manager