Forwards IE Insp Repts 50-321/80-36 & 50-366/80-36 on 800916-19 & Notice of Violation
ML20002B418
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 10/27/1980
From: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML20002B415 List:
References
NUDOCS 8012110534
Download: ML20002B418 (2)


See also: IR 05000321/1980036

Text

.

.

.y

/

'o

UNITED STATES

8

NUCLEAR REGULATORY COMMISSION

^

,

n

N M

.E

REGION 11

8

101 MARIETTA sT., N.W., SUITE 3100

ATL ANT A, GEORGI A 3C3o3

o..,*

OCT 2 7 Foo

Is Rrply Refer To:

RII:WHM

30-321/80-36

50-3:6/80-36

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by W. H. Miller, Jr., of this office on

September 16 through 19, 1980 of activities authorized by NRC Operating License

No. DPR-57 and License No. NPF-5 for the Hatch facility, and to the discussion

of our findings held with M. Manry at the conclusion of the inspection.

Arecs examined during the inspection and our findings are discussed in the

cncle. sed inspection report.

Within these areas, the inspection consisted of

celective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is dis-

cussed in the ene .osed report.

Four new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

During the inspection, it was found that certain activities under your license

cppear to be in noncompliance with NRC require:eents. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Titic 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In s ccordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

cny information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application mast

include a full statement of the reasons on the basis of which it is claimed that

!

8012110

g

_

.

.

.

'

.

.

Georgia Power Company

-2-

OCT 2 7 90

the information is proprietary, and should be prepared so that proprietary infor-

nation' identified in the application is contained in a separate part of the

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to L euss

them with ycu.

Sincerely,

t[ !

,

,

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/80-36

and 50-366/80-36

cc w/ enc 1:

'

M. Manry, Plant Manager

C. E. Belflower, Site QA Supervisor

W. A. Widn?r, Vice President and

General Manager-Nuclear Generation

. , _ . _ . . . _ - _ - - - - . - . . - - -