Forwards Response to NRC Re Compliance W/ NUREG-0612, Control of Heavy Loads at Nuclear Plants - Resolution of Task Action Plan A-36. Twenty-nine Oversize Drawings Encl.Aperture Cards Are Available in PDR
ML19354C473
Person / Time
Site: Limerick  
Issue date: 06/18/1981
From: Kemper J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Eisenhut D
Office of Nuclear Reactor Regulation
Shared Package
ML19354C474 List:
References
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR NUDOCS 8106230479
Download: ML19354C473 (57)


Text

PHILADELPHIA ELECTRIC COMPANY 2301 M ARKET STREET P.O. BOX 8699

  • IO PHILADELPHIA. PA.19101 June 18, 1981 [1,.CDheg, som s. xrwen v.ca....iosur

.. =................

,y Mr. Darrell G. Eisenhut, Director Division of Licensing h{ UL L

gs 9

Office of Nuclear Reactor %gulations M dg.., n o 1981 * ~'

U.S. Nuclear Pegulatory Cartnissicn

" " ' ~

-7 c}^ u.s.fy',lljo.i[

Washington, D.C.

20555 ca

.~

Reference:

Limerick Generating Station, Units 1 & 2 '

f/

Docket Nos. 50-352 and 50-353

/@T

Dear Mr. Eisenhut:

Your letter dated Decetter 22, 1980 transnitted NUREG-0612, " Control of Heavy Icads at Nuclear Power Plants - Resolution of TAP A-36", and requested that certain information be provided. These requircrnents are restated below followed by our responses:

1.

"Subnit a report documenting the results of your review and the required changee and modificaticns. This report slruld include the informaticn identified in Section 2.1 thrcugh 2.4 of Enclosure 3, on how the guidelines of NURE-0612 will be satisfied. This report should be subnitted in tm parts according to the following schedule":

"Subait the Section 2.1 information within

(

six months fran the date of this letter".

"Subnit the Section 2.2, 2.3 and 2.4

(

infornuticn within nine acnths".

.y Resoonse LG ny 8

Encloscd is the first part of the requestai reprt, which I&* O OW1 provides the information identified in Section 2.1 of.

The second part of this report will be subnitted by Septmier 22, 1981 and will provide the information identified in Se::tions 2.2 and 2.3 of Enclosure 3 to your Decanber 27, 1980 letter.

2.

" Furnish confirnution within six nonths that implanentation of trose charg;es and mor'.ifications you find are necessary will cmmence as soon as possible withcut waiting on staff review, so that all such changes, beiend the above interim actions, will be ccupleted within tm lers of subnittal of Section 2.4 for the above report".

8106230 NN

__ _ _ _ _ _ Response Nece==ary changes and modifications will be initiated as soon as practicable with the goal of conpleting the task prior fo fuel load. It is recognized that the analysis required for the next phase of this study will be the major determinant of changes and modifications.

3.

"Eurnish justificaticn within six mont.hs for any changes or modifications that would be required to fully satisfy the guidelines of Enclosure 1 which you believe are not necessary".

Response

Our review has, to this point, determined only one change or modification which we feel is not necessary.

'Ihis is the requirenent for the marking of safe load paths on the floors. It is felt that training, procedures, interlocks and other indications such as signs provide a sufficient level of safety.

In addition, we are presently investigating the requiremnts that special lif'dng devices and slings meet ANSI ta4-6,1978 or A?GI B20.9-1971 as appropriate as supplanented by NtBEG-0612, Section 5.1.l(4).

Based upon the results of this investigaticn, exceptior s i

to this requirenent may be taken.

Sincerely, f/

e Pb41=daiphia Electric Cbnpany L

Limerick Atanic Power Staticn Docket Nos. 50-352 ard 50-353 Information Requested in Section 2.1 of m closure 3 l

to NRC Ietter dated Decenber 22, 1980 regarding ompliance with NURBG-0612, "Cbntrol of Heavy Icads at Nuclear Plants assoluticn of TAP A-36" It s 2.1.1 l

"Reprt the results of your review of plant arrarxrements to identify all overhead handling systens from which a load l

drop may result in damage to any system required for plant shutdown or decay heat removal (taking no credit for any interlocks, technical spex:ificaticos, operating procedures, or detailed structural analysis)."

Response

l l

The following overhead handling systens were identified as l

potentially hazardous in that a lord dcM frcm than might l

damage fuel or systems required for safe shutdown or decay heat removal (Itsu numbers refer to Table 1 titled Index of overhead IIandling Systens, mpy attached):

1)

Crane / hoists which carry heavy loads over reactor l

fuel: For Limerick, a heavy load is defined as a load greater than 700 pounds.

i a.

Reactor Enclosure Crane (Iten 20) 2)

Cranes / hoists which carry heavy loads over systens or components required for safe shutdown or decay heat I

renoval; (hatches under load paths are assumed to be either open or innable of stopping the fall of a heavy load):

a.

Diesel Generator Building Bridge Cranes l

(Itsa 44-Diesel generators and audliaries l~

are under the load path).

b.

Spray Pond Pump lbuse Ibists (Iten 49-RHR Service Water valves and under the load path).

c.

Spray Pord ME and ESW Pump Yard Crane (Itsu 61-RIE and ESW puups are under the load path).

t l

l 3)

Cranes / hoists which may carry heavy loads in the vicinity of safety-related electrical circuits or instnmentation..

a.

Control Roan HVAC Lift Bems (Itan 19) b.

Recirculation Pump Motor Hoists (Iten 21) c.

Core Spray.Put:p Hoist 10-H215 (Itan 25) d.

Core Spray Pump Holst 10-H-216 (Iten 26) e.

Contairunent Equipnent Door Hoist (Itan 29) f.

CRD Removal Platform Hoist (Itsn 33) g.

MSRV Service and Bemoval Hoists (Itan 34) h.

Contalment Hydrogen Pehiner Cover Hoists (Iten 36) 1.

Control Rocn HVAC RIuignent Hoist (Iten 58) 4)'

Table 1 (Index of Overhead Hardling Systers) identifies cranes and hoists where safety-related equignent has been identified on the next elevaticn below the elevation of the load path. It is assumed that a load dropped fran these overhead handling systers will not penetrate the floor, but may cause spalling of the concrete below, which could affect the safety-related equignent.

Itun 2.1.2

" Justify the exclusion of any overhead handling systen fran the above category by verifying that there is sufficient physical separation fran any load-impact point and any safety-related ccrnponent to pennit a determination by inspection that no heavy load drop can result in damage to any systen or cmponent required for plant shutdown or decay heat rotoval."

Response

Exclusion Criteria Cranes and hoists which are not listed in the response to itan 2.1.1 aluve do rot carry heavy loads in the vicinity of fuel or syst m s required for safe shutdown or decay heat ratoval. Specific reasons for exclusion of these overhead handling systes are given below. Exclusion criteria for each crane or hoist are listed in Table 1 (Index of Overhead Handl2ng Systans).

- Criterion A: h crre or hoist is located in a structure which does not contr.in syates or agtimant requirsi for safe shutdown or decay heat reoval. Structures included are the M rbine Enclosure, the R dwaste Enclosure, the Administration Biilding, the Auxiliary Boiler 9141 ding the Circulating Water Purrp House, and the Schuylkill River PLmp House. mis designation is based cn the Limerick Fire Protection Evaluation Report which identifies safety-related equignent in each fire area and evaluates the effect of the loss of this eqMmt cn plant safe slutdown capability (including decay heat remwal).

Criterion B: 'Ihe load carried by this crane or hoist is not greater than_700 pounds. B erefore, it is not a heavy load.

Criterion C: For these cranes and hoists there is no equipnent required for safe shutdown or decay heat removal located in the load path. Absence of safe shutdown equignent was determined by review of the Fire Protection Evaluation Report and the results of the Separation Program. Ioad paths are defined on the drawings attached to this report. Except where limited by walls or other barriers load paths are at least twice as wide as the widest load or hatch opening m us, the load will still land in the load path if swinging occurs before it is droppai. For a load whose height is nore than twice its width, it is asstrod that the load can tip over in any direction fran an impact point below the centerline of the normal or crane hoist. In these cases the load will also land within the load path. Therefore, dropped Joads cannot damage safe-shutdown or decay heat renoval systens or cmponents.

Item 2.1.3:

"With respect to the design and operaticn of heavy-load-handling syst e s in the reactor building and those load-handling systms identified in 2.1-1, above, provide your evaluation concerning empliance with the gnidalines of NUREG-0612, Section 5.1.1.

The following specific informa-tion should be included in your reply":

Item 2.1.3.a

" Drawings or sketches sufficient to clearly identify the location of safe load paths, spent fuel, and safety-related equipaent."

ir :-

~4-Besponse

, Safe Ioad Paths Equipnent location drawings which identify re- "ded safe load paths and locations of fuel and safety-relatal equipnent are attached to this report. 'Ihese drawings identify each crane or hoist by the aqnir=mt its number used in Table 1.

It s 2.1.3.b "A discussion of measures taken to ensure that load-handling operations reain within safe load paths, including procedures, if any, for deviation frcm these paths".

Response

'Ihis information is not currently available but will be considered in the developnent of load handling procedures.

It s 2.1.3.c-

"A tabulation of heavy loads to be handled by each crane which includes the load Mentification, load wight, its designated lifting device, and verificaticn that the handling of such load is governed by a written procedure containing, as a mimimin, the information identified in NUREn-0612, Sectica 5.1.l(2)".

Response

1)

Ioad Tabulation A load tabulation for each crane or hoist, including load identification, load weight and special lifting device (if any), is included in Table 2 titled Ioad Tabulation.

2)

Lifting Device Design For purposes of this review a lifting device is defind as the load carrying connection between the crane or hoist hook and the load. A special lifting device is a lifting device specifically designed to handle a particular load. Special lifting devices to he used at Limerick are identifial in Table 3 titled Limerick Special Lifting Devices.

3).

Verification that the handling of such load is governai by a written procedure in au.u dance with NUREG-0612.

Sch 5.1.l(2) will be available prior to fuel load.

j

1 l

l i It s 2.1.3.d

" Verification that lifting devices identified in 2.1.3-c, above ocmply with the requirenents of ANSI N14.6-1978, or ANSI B30.9-1971 as appropriate.. For lifting devices where these standards, as supplemented by IK1 REG-0612, Section 5.1.1(4) or 5.1.l(5), are not met, describe any proposed alternatives and denenstrate their equivalency in tems of load-handling reliability."

Response

te special handling devices in Table 3 titled Limerick Special Lifting Devices are not certified to MEI N-14.6 1978 as supplanented by NURBG-0612. - Shipping cask okes are l

designed to be single failure proof, which is superior to meeting the ANSI specification dircctly.

Current requiranents for slings utilized by Construccion and Maintenance Division for Q-listed equipnent will meet ANSI N45.2 - 1972.

Please refer to our respcmse to itan 3 of the cover letter to this document for further discussion.

Itan 2.1.3.e

" Verification that ANSI B30.2-1976, Chapter 2-2 has been invoked with respect to crane inspection, testing and maintenance. Where any exception is taken to this standard, sufficient information should be provided to danonstrate the equivalency of proposed alternatives."

Response

% e Limerick facility is still being constructed. ANSI B30.2, 1976, will be considered in the preparation of the crane inspection, testing and mintenance modures at the time the cranes and luists are turned over for plant use.

l Itan 2.1.3.f

" Verification that crane design emplies with the galde-lines of CMAA Specification 70 and Chapter 2-1 of Anet B30.2-1976, including the danonstration of equivalency of actual design requiranents for instances where specific conpliance with these standards is not providcri".

w

._ Respmse h procurment specifications for cranes identified in 2.1.1 require e m pliance with all specifications and standards issued by the Crane Manufacturers Association of America (C4AA) and the American National Standards Institute (MEI) which were in effect prior to the date of the purchase order. 'Ihe reactor enclosure crane was purchased in 1973 and therefore was designal to C4AA Specification 70 and an earlier version (1967) of MEI B30.2. The diesel generator cranes were purchased in 1972 and designed to the same standards as the reactor enclosure crane.

h cranes were designed according to Chapter 2-1 of MEI B30.2-1967. NURED-0612 requires verification of cogliance with Chapter 2-1 of ANSI B30.2-1976. The two editions of MEI B30.2 were compared. Based on this cmpariscn and review of the crane technical specifications and mEnufacturers' data it is concluded that the cranes above generally ccmply with the applicable requiranents of Chapter 2-1 of MEI B30.2-1976, with the following exceptions (listed by ANSI B30.2-1976 Section number):

2-1.4.1 Welded Constartion - The cranes welding proce-dures conform to AWS D2.0-66 rather than Ah5 Dl.l.

2-1.5.2 d Design of guard rails and toe bards emplies with USAS A12-1932 rather than MEI A12.1.

2-1.7.3 2-1.8.3.a.1 Trolley huupers designed with energy absorbing capacity for 40% of rated trolley speed rather than 50%.

2-1.10.1 Wiring and equipnent emplies with USAS Cl-1965 rather than Article 610 of National Electrical Code, MEI C-1 (?FPA 70).

We do not consider the above differences to te significant with respect to safe operation of the cranes. Crane design should be considered to be in empliance with the guidelines of ANSI B30.2-1976.

WJA/cw

Page 1 of 9 -

CNElulEAD !!ANDLItO SYSTEM REVIEW TABIE 1 INEEX OF CNEldlEAD llAPIDLItG SYSTDtS - LUIT I s, CCNMCU Fire Crane Safety-Protection or Safety Related Related Areas:

lloist Material Max.

Item In Item On Ioad Path Equip.

Reg.

Vert.

Ioad Exclusion Next [cwer Next i m r Item tiumber flarre/ Service Area

Elev, Drug. Capacity Number Lift Path?

Criteria Elevation? Elevation 1

10-11101 lbactor Feet 7

217' M-111 10-ton M-28 16'-0" to A

to 94B,94C,94D Punp Area 89A Bridge Crane 2

OA-il102

'Ibrbine Bldg.

1,2,3,4,5 269' M-113 110/15 M-15 90'-0" to A

to 114 08-11102 Cranes ton 95,96,88A,ll30 3

10-11105 ccwdensate 2,3 217' M-111 20-ton M-28 43'-0" to A

NO 87 Punp Bridge 87 Crane 4

10-11107 Coniensate 6,7 239' M-112 16-ton M-38A 38'-6" to A

to 97 Filter-89B,94A Demnera1izer lloist 5

00-11108 lecanbiner 8

200' M-110 15-ton M-38A 27'-0" 10 C

to It!

Service M-125 1C,lD,lE,lF lloist 6

00-11112 Preheater 8

180' M-116 1-1/2 M-38BB 11'-0" to C

N/A IC Iknoval ton Iloist N/A 7

10-11113 Reactor 7

200' M-110 1/2 ton M-38BB 12'-4 to A

N/A 89A Feed Pune N/A ibrbine

{

Iaibe Oil Punp floist i

I P-240/4

Page 2 of 9 l

t OVEI41EAD liANDLItG SYSTEM REVIEW TABIE 1 INDEX OF OVFRiiEAD llA!!DLItG SYSTEMS - t14IT I & COMMOt1 i

Fire I

l Crane Safety-Protection or Safety Related Related Areas:.

l Iloist Matetial Max.

Item In item Ort Ioad Path Bluip.

Reg.

Vert.

Ioad Exclusion Next Iower Next Iower -

Item timber flame / Service Area

Elev, Drug. Camcity Number Lift Path?

Criteria Elevation? Elevation 8

10-11116 Turbine 6

217' M-111 5-ton M-38BA 30'-0" to A

to 94A l

Enclosure 89A Aux. Bluip.

itatch Iloist 9

00-11117 Condensate 9

217' M-lll 1-ton M-38BB 22'-9" to A

to 94A Filter 89A,89B Demineralizer iblding Pmps lloist t

10 00-11118 Main tube Oil 1

239' M-ll2 4-ton M-38BA 43'-0" FO A

to 95 TatA Iloist 93 11 OA-!!119 Recirc. Punp 6,7 269' M-113 24-ton M-38BA 25'-0" to A

to 98A 08-11119 M-G Set Ibist ca.

555,88C,88D,97 1

12 00-11120 1x,fwell 7

302' M-ll5 6-ton M-38BA 10'-3" 10 A

to 99A Chiller 98A,98C,98D 4

floist 13 10-11122 Dryw 11 7

302' M-115 6-ton M-38BA 42'-0" to A

to 99A Chiller 98A flatch lloist 14 00-11124 14C0 Pilter 11 313' M-121 5-ton il-38BC 17 ' - 4 "

MO C

YES 48A Demineralize r 473 Ilois t I

Page 3 of 9 OVERilEAD liANDLING SYSTDi PEVIEW TABIE 1 INDEX OF OVERIIEAD flat 3DLItC SYSTERS - UNIT I & COMJt3 4

Fire l

Crane Safety-Protection Safety Related Related Areas:

or Material Max.

Item In Item On load Path iloist Equip.

Req.

Vert.

Inad Exclusion Next Iower Next Lower Item thmher flame / Service Area Elev Drug. Capacity thmter Lift Path?

Criteria Elevation?

Elevation 15 00-11126 IIVAC Erjulp.

8 350' M-124 2-ton M-38BB 53'-9" to

'C YES 28A Ilatch floist 27A 16 OA-lil27 lbt Machine Mmin.

217' A-7001 2-ton M-38BB 10'-11" r0 A

10 N/A 08-!!127 Shop Monor-Bldg.

Sht. 1 N/A OC-ill27 rail lloists 17 00-11129 Control IW.

8 200' M-110 5-ton M-38BB 26'-0" to C

to IL,1M 00-11130 Chiller M-125 4-ton 7'-4" lA,B,J,K,C,Il l

Iloists 18 10-11131 Reactor Encl.

16 313' M-121 6-ton M-38BC 106'-6" 10 C

YES 48A Erluip. Ilatch 47A Iloist 19 00-11133 Control Ibam 8

217' M-111 3-ton M-38BC 21'-0" YES YES 2

IIVAC Lift M-126 IL Beams 20 00-11201 Heactor Bl<kj.

11-16 352' M-122 125/15 M-16 165'-6" YES YES 78A,B,C Overhead Crane ton 48A,E,C,78A,30A 21 1A-Il203 lecirculation Drywell 253' M-119 24-ton M-3RA 41 '- 0" YES YES 30A,45A 1B-11203 Pump Motor ca.

29A,43,44 lbists 22 OA-II208 Fuel Pool 12 352' M-122 1/2-ton M-1 50' N/A B

N/A 78A 0B-11208 Jib Cranes (GE)

'iaA l

~

i P-240/4

Page 4 of 9 OVEN!!EAD flat 3DLItG SYSTEM REVIEW TABIE 1 IIIDEX OF OVERl!EAD IIA!!DLItC SYSTEMS - IIIIT I & 00MMOt1 Fire l

Crane Safety-Protection Safety Related Related Areas:

or i

iloist Material Max.

Item In Item On Ioad Path Equip.

Req.

Vert.

Ioad Exclusion 13 ext Iower tJext lower Item tiunber flarae/ Service Area Elev.~ trug. Capacity tiumber Lift Path?

Criteria Elevation?

Elevation l

23 00-11213 CRD Pune 6

200' M-110 5-ton M-38A 7'-2" 10 A

N/A 89A Iloist N/A 24 10-11215 IIPCI/RCIC 11,15 217' M-ll8 10-1/2 M-38BC 56'-0" YES YES 44 B uip,lloist ton 42A l

25 10-11216 Core Spray 11 217' M-118 5-ton M-38BA 59'-3" YES YES 44

~

Punps lloist 42A,42B 26 10-11217 Core Spray 12 217' M-ll8 5-ton M-38BA 59'-3" YES YES 44 Punp Iloist 41 27 1A-II218 Reactor Encl.

12,16 217' M-ll8 12-1/2 M-38BC 32'-0" YES YES 44 1B-11218 Cooling Water ton ca.

56'-0" 41 IIX & Core Spray Punp iloist 28 10-11219 RIIR Punps 15,16 217' M-ll8 10-ton M-38BA 55'-9" YES YES 44 Iloist 31,32,42A 29 10-11220 Containment 11 253' M-119 6-ton M-38BA 16'-0" YES YES 45A,30A Bluip. Door 44,29A Iloist 30 1A-fl221 Personnel Inck 16 253' M-119 20-ton M-38BC 16'-6" t10 C

YES 4SA,30A 18-11221 Iloist ea.

43,44,29A P-240/4

Page 5 of 9 i

OVEIulEAD llANDLING SYSTEM REVIEN TABIE 1 ItJDEX OF OVER!!EAD IIANDLItU SYSTEMS - UNIT I & OOiMOt3 Fire Crane Safety-Protection l

or Safety Relatal Related Areas:

lloist Material Max.

Item In Item On Ioad Path lijuip.

Req.

Vert.

Ioad Exclusion Next Iower Next lower t

Item tiumber flame / Service Area Elev.

Dtwq. Capacity Ilumber Lift Path?

Criteria Elevation? Elevation 31 00-11223 IMCU lleat 15 283' M-119 8-ton M-38BA 12'-7" tO C

YES 47,II,J,K, L Excharvjer 45A,45C lloist 32 10-11224 Puel Channel 12 352' M-122 500 lb.

M-38BC 10'-3" N/A B

N/A 78A Jib Crane 78A 33 10-11229 CIO Platform 15 253' M-119 l-ton M-33 20'-0" YES N/A 30A Iloist 29A 34

1All233, MSRV Service 11,12, 273' M-234 1-ton M-38BA 8'-0" YES YES 30A,47H 234,235, Iloists 15,16 286' 2-ton M-38BB 50'-0" 30A,46
1811233, MSitV Rerroval 234,235, lloists 10i!230, 232 35 10-11236 Disposal Cask 15 253' M-119 1-ton M-38BC 20'-7" NO C

YES 30A Cart Retroval 29A ticist 36 10-11237 Containment 11,16 283' M-120 1-ton M-38BB 10'-8" YES YES 47A Ilydrogen 45A Itecombiner j

Cover lloists 37 10-11238 Equipnent 16 283' M-120 25-ton M-28 74'-0" NO C

YES 47A IIatch Bridge 45A Crane 1

j P-240/4

Page 6 of 9 OVER!!EAD llMIDLItO SYSTEM REVIEW TABIE 1 INDEX OF OVEH11FitD IIAtIDLItU SYSMtS - LR11T I & CCIt10t1 Fire Crane Safety-Protection or Safety Related Related Areas:

floist Material Max.

Item In Item On Inad Path Equip.

Reg.

Vert.

Iozxl Exclusion Next Iower Next Lower Item flamber flame / Service Area Elev.

Drug. Canacity Number Lift Path?

Criteria Elevation? Elevation 38 10-11239 CRD Main-15 253' M-119 1-ton M-38BA 14'-0" tD C

YES 45C tenance Area 44 Crane 39 00-11302 fulwaste 22 237' M-143 20-ton M-37 23'-0" 10 A

10 120N llandling 120t1 Crane 40 00-11306 Pr(xluct Cylin-19 195' M-141 4-ton M-38BC 22'-6" NO A

to 119A der /Pipeway 117 Iloist l

41 00-11307 Ihiwaste Build--

20 257' M-143 2-ton M-38BA 51'-0" 10 A

to 12111 ing !!VAC lloist 121A i

i 42 00-11308 lulwaste 1: quip.

22 257' M-143 2-ton M-38B 50'-1" 10 A

to 121M IIatch 1101st 121A,120N 43 00-11310 Radwaste Demi-20,22 217' M-142 4-ton M-38BB 66'-0" to A

tO 120L 3

~

neralizer &

ll80-X Equip. Iloist 44 1A-fl501 Diesel D.G.

217' M-145 15-ton M-28 20'-9" YES N/A 79-86 1B-l!501 G2nerator Bldg.

N/A 1C-Il501 Building 11>-11501 Cranes 45 00-11502 Machine Shop Admin.

217' A-7001 15-ton M-28 20'-0" NO A

N/A N/A Bridge Crane Bldg.

Sht. I a

P-240/4

Page 7 of 9 DVEIGIEAD !!ANDLIto SYSTEM REVilM TABIE 1 INDEX OP OVEFdIEAD !!AriDLIto SYSTENS - UNIT I & CCNMON l

Fire Crane Safety-Protection or Safety Related Related Areas:

lbist Material Max.

Item In Item On Ioad Path Equip.

Reg.

Vert.

Ioad Exclusion Next Iower Next Iower Item Number Name/ Service Area

Elev, Drwt. Capacity 11 umber Lift Path?

Criteria Elevation? Elevation 46 00-11503 Circulating 00 217' M-5101 30-ton M-28 40'-0" 1D A

to N/A Water Bldg.

M-5102 Bridge Crane M-5103 47 00-11508 Machine Shop Admin.

217' A-7001 5-ton M-28 20'-0" 10 A

N/A N/A Decon. Area Bldg.

Sht. 1 Bridge Crane 48 00-11510 Auxiliary A.B.

217' M-1290 2-ton M-38A 30'-0" NO A

N/A N/A Boiler Bldg.

Bldg.

Iloist 49 00-11511 Spray Ibnd Spray 268' M-388 3-ton M-388 12'-4" YES YES 122A,D,123A,D 00-11513 Pump Ilouse Ibrx]

ea.

1228,E,123B,E lbiets Pump llouse 50 00-11514 Control Ibam 8

200' M-110 3-ton Field 15' to C

to IL, IM,IN,115D Chi 11er Ibrt-M-125 1A-lK able Gantry Iloist i

51 00-11521 IIEPA Filter 19 191' M-141 15-ton M-38B 34'-0" to A

to 119A Iloist 117 52 00-11530 Schuylkill S. R. P.li. 147' M-4302 5-ton M-38BA 48'-0" 10 A

to N/A River Bulk-head floist l

P-240/4 I

Page 8 of 9 O/ERilEAD llANDLING SYSTEM REVIEW TABIE 1 9

INDEX OF OVEF!!EAD IIANDLIt1G SYbW - Ut1IT I & C01M01 Fire Crane Safety-Protection or Safety Related Related Areas:

lloist Material Max.

Item In Item On Ioad Path Bluip.

Req.

Vert.

Ioad Exclusion Next Lower Next Lower Item Nunber llame/ Service Area Elev.

Drug. Capacity

!! umber Lift Path?

Criteria Elevation? Elevation 53 Steam Tunnel 11,12 280' M-234 35' fD C

YES 46 Monorail 46 Iloists 54 8031-M-Itefueling 11-18 352' M-122 1200 lb.

M-1 50' N/A B

N/A 78A l-F19-Platform 1000 lb.

(GE) 48B,C,78A,30A E003 Grapple &

iloists i

55 N/A YES YES N/A Spray Ibnd Spray 268' M-388 RI1R & ESN Ibnd 122A,D 123A,D Pumps Yard Pump Crane llouse 56 Feedwater 2

239' M-ll2 25' to A

to 88A

{

lleater Tube 86A Iknlle lloist

'Ibrbine Encl.

7 302' M-115 1-ton 20' to A

FO 99A 57 M-G Set Area 98A,98C Surply Air Cooling Coils 11oist i

58 (00-Control Room 8

302' H-ll5 2-ton M-38BC 17' YES YES 27 j

11124)

IIVAC Equip.

M-130 3-ton 25A floist 59 Wetwell 11,12, 217' M-118 2-ton 50' to C

to 29A Monorai1 15,16 29A Iloist

  • lloist/ Crane to be borrowed f ran other locations when needed l

P-240/4

Page 9 of 9 OVER11EAD flNiDLI?G SYSTEM REVIEW TABIE 1 ItirEX CF O/EI<!!EAD flANDLItG SYSIDG - Lt3IT I & EMMCri Fire Crane Safety-Protection or Safety Related Related Areas:

lioist Material Max.

Item In Item On Ioad Path Equip.

Reg.

Vert.

Ioad Exclusion tiext Iower Next lower Item thrrier 13ame/ Service Area Elev.

Drwo. Capacity tiumber Lift Path?

Criteria Elevation? Elevation 60 Control Struc.

8 321' M-124 2-ton 8'

ID C

YES 27 Fans Liftirs) 24A Beam floist

  • lloist to be tx>rrowed from another location when bed P-240/4

P.

1/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Reactor Enclosure Overhead Crane (00-II201)

  • Location Reactor Enclosure - Unit 1 Impact Refteling Floor Area Columns 15.5-23, D-J Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equip:nent Equipment Reactor Well Irradiated Fuel Shield Plugs 352'-0" (Up to 90 tons)

Strongback I O<e H

r Drvwell Ilead a,

(104 tons) m D

D O.

Yu d3 (A

M l

Reactor Vessel Ilead I e

(92 tons)

n j

RPV ilead e

Strongback d

i 1(

m l

C I

l l

l

  • Table 1 - Item 20

P.

2/39 TABLE 2 LOAD TABULATION CRANE / HOIST:

Reactor Enclosure Overhead Crane (00-!!201)

  • U" Reactor Enclosure - Unit 1 i

Impact Refueling Floor Area Columns 15.5-23, D-J Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Steam Dryer (45 tons) 352'-0" Irradiated Fuel Dryer / Separator Sling o4e c

r Steam Separator (74 tons) tc Dryer / Separator g

Sling n

U

s un in
  • <m Puel Pool Stop g

Logs 3"

(35 tons) 5 Lifting Assembly II r

}

i r

C

~

  • Table 1 - Item 20 1

P.

3/39 TABLE 2 LOAD TABULATION CRANE /liOIST:

Reactor Enclosure Overhead Crane (00-11201)*

Location Reactor Enclosure - Unit 1 Impact Refueling Floor Area Columns 15.5-23, D-J Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Dryer / Separator Storage Pit 352'-0" Irradiated Fuel Canal Plujo (45 tons) 1 Strongback II o<

e Puel Pool Gates

(~3 tons each) m sa s

u 1

b ue m

1 Refueling Shield (22 tons) 2 Refueling Shield y

Lift Rig if V'

eC 1

i i

  • Table 1 - Item 20 i

1 I

P.

4/39 TABLE 2 LOAD. TABULATION CRANE / HOIST:

Reactor Enclosure Overhead Crane (00-11201)*

ca don l

Reactor Enclosure - Unit 1 l

i i

Impact Refueling Floor Refueling !!oistway Area Columns 15.5-23, D-J Columns 22.5-23.5, D-F Loads Safe-Shutdown Safe-Shutdown j

Elevation Elevation Equipment Equipment i

Spent Fuel 352'-0" Irradiated Fuel 217'-0" None 5 hipping Cask (100 tons)

Cask Yoke o<e E

Service Platform-(6 tons)

P'

I:

Service Platflerm Sling

>~

.3*

.l sn IU2 V il e a d Insulation (9 tons)

U 5<

if a

c

  • Table 1 - Item 20 4

P.

5/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Recctor Enclosure Overhead Crane (00-11201)*

Location Reactor Enclosure - Unit 1 Impact Refueling Floor Area Columns 15.5-23, D-J Loads Sdfe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment llead Stud 352'-0" Irradiated Tensioner Fuel

.k 5

Ilead Stud g

Rack (l-1/2 tons)

E an.

5 s

I en en seal q n r ' ace 8.*

Protector g

(

){

C

  • Table 1 - Item 20 l

t

P.

6/39 TABLE 2 LOAD TABULATION CRANE / HOIST:

pe3ct,r Enclosure Overhead Crane (00H201)

  • 4 I

Location Reactor Enclosure - Unit 1 Impact Refueling Floor Area Columns 15.5-23, D-J l

_ =,. _

LO43' Safe-Shutdown Sa e-Shutdown Elevation Elevation Equipament Equipment r

Crane Load, 352'-0" Irradiated Fuel Block (5 tons) 2 I

E Fuel Pool &

i Service Platform 4

Jib Cranes

c (2.2 tons) o,

>=

i

s I

in Fuel Channel l

Ilandling Boom i

(~3/4 tons) i

s e

l V

)f

.C i

l j

  • Table 1 - Item 20 i

P.

7/39 TABLE 2 LOAD TABULATION CRANE /llOIST:

Recombiner Service lloic' (00 '11108)*

Location Control Structure - Common Impact Area 8, Elevation 200' Area Columns 20-26.5, M-N Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment floist Capacity:

200' 7ione

_15 tons Ilatch Plugs 180' None i

(Under 200' Slab)

$e N

,a Recombiner Cover 200' None g

se 3

i 180' None D

(Under 200' Slab) y e

in l

'<a i

Catalyst 200' None g

j i

=

1 e

i None 180' (Under 200' Slab) 7 t

C i

1 i

i l

l

  • Table 1 - Item 5 i

P.

8/39 TABLE 2 LOAD TABULATION CRANE / HOIST:

Preheater Removal lloist (00-11112)*

i Mca tion Control Structure - Common Area 8 - Elevation 180' Impact Area Columns 22-23, M-N 24-25, M-N Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment lioist Capacits 180' None

. 1-1/2 ton Preheater k.

E.

mm i

Ma 1

D l

H i

i 3

e I

en m

ate E

F<

eo 1

I

  • Table 1 - Item 6 i

i e

I P.

9/39 TABLE 2 LOAD TABULATION CRANE /if0IST:

Reactor Water Clear.up Filter /Demineralizer lioist (00-11124)*

i Location Reactor Enclosure - Unit 1 Area 11, Elevation 313' Impact Area Columns 15-18, 11 Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Iloist Capacityl 313' None

_5 ton Filter /Demin.

Vessel Installation 283' Yet, unidentifiet (Under 313' Slab) ko es

r llatch Plugs (3 ton) 313' None 6
c i

eon.

283' Yes, unidentifiet 5

(Under 313' Slab) sn wa fte9m

o d

e<re l

j I

i

  • Table 1 - Item 14 I

. = _.

P.

10/39

' LOAD TABULATION TABLE 2 CRANE / HOIST:

liVAC Equipment flatch floist (00-11125)*

Location Control Structure - Common l

Isapact Area 8, Elevation 350' l

Area Columns 19-21, M Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipement Iloist Capacity:

350 None 2 ton Miscellaneous 1

'I 321' Yes Q

Unidentified

'on:r*

I' s&

c*ua H

W o

4 M

/

g m

3 er e

E

o 1

i

<r e

i l

i

  • Table 1 - Item 15 b

I I

l

P. 11/39 TABLE 2

- LOAD TABULATION CR/RE/IlOIST:

Control Room, Chiller lioists (00-11129/00-11130)*

Location Control Structure - Common Impact Area 8, Elevation 200' Columns 20.5-25.5, K-M Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment IIoist Capacitiesi 200' None 5 ton /4-ton 7

Chillers 180' None o

(Under 200' Slab) 5 e

=

i

n mun.

l W

t.-

ue in

'<m tee i

Ba i

  • o

,e i

d e

1 C

1 i

i

  • Table 1 - Item 17 j

1

t l

P.

12/39 l

TABLE 2 LOAD TABULATION l

CRANE /llOIST:

Reactor Enclosure Equipment llatch !!oist (10-11131) l Location Reactor Enclosure - Unit 1 Area 16, Elevation 3133 Impact Area Columns 21.5-22.5, D-E f Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Iloist Capacity:

i 6 ton 313' None i

Misc. Loads RilR Instrumentation 200' (Below 217' Slab)

O<

O N

'.T Ilaten Plugs (5-1/4 ton ca.)

313' None m

i

=

l RilR l

200' Instrumentation

[

j (Below 217' Slab)

J i

sn 1

'<a re

.l e

U i

i

o i

e

  • I a

f i

j

^

  • Table 1 - Item 18 i

l 1

P.

13/39 TABLE 2 LOAD TABULATION Control Room IIVAC Lif t Beams ( 00-1113 3) f CRANE / HOIST:

Location Control Structure - Common Impact Area 8, Elevation 217' Area Columns 22-24, K-M Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment lloist Capacity :

217'

Yes, 3, ton Unidentified Fans & Cooling Coil Assemblies None 200 (Below 217' Slab) o<e et
r e>

o, m

i eap.

Hr a

e b

(n 1

m ate i

i w

1 m

l eI e

C i

i

  • Table 1 - Item 19 I,

P.

14/39 TABLE 2 LOAD TABULATION CRANE /liOIST:

Recirculation Pump Motor lloists ( l A-11203, 1B-1120 3)

  • i Location Reactor Enclosure (Drywell) - Unit 1

\\

Impact Drywell, Elevation 253' Area Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Iioist Capacity;"

253' Unidentified 24 ton each

~

Safety-related Electrical Recire. Pump Yes, Unidentifieil ton)

238, (Below 253' Slab.

o<e

  • 1
r Recirculation 253' Unidentified Pump Safety-related (13-3/4 ton)

Electrical m

e a

sb Yes, Unidentified 238' (Below 253' Slab)

'8 51 i

Va 1

m o

F e

i l

l

" Table 1 - Item 21 1

P.

15/39 TABLE 2 LOAD TABULATION l

CRANE /IIOIST:

Fuel Pool Ji b Cranes ( OA-Il20 8, 0B-1120 8)

  • l Location Reactor Enclosure - Unit 1 i

l l

Impact Refueling Floor, Elevation 352' Area Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment IToist Capacity:

352' Irradiated Fuel

~"

1/2 ton ea.

Fuel Bundle (700 lbs.)

o<e et

ree j

in t

D n

i wrn e

i t/h i

N i

e i

ete 4

4

o

's 1

a i

i

>^-

e 1

8

}

" Table 1 - Item 22 i

)

4 i

P.

16/39 TABLE 2 LOAD TABULATION CRANE /if0IST:

11PCI/RCIC Equipment iloist (10-11215)*

Location Impact Areas 11, 15 - Elevation 217

^#**

Columns 14-15, D-li Lcada Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Yes, unidentifiec Iioist Capacity:

217' Safety-related 10-1/2 ton Electrical

!!PCI Turbine (10-1/2 ton) 201' Yes, Unidentifed (Below 217' Slab) o<

177' Yes, llPCI, RCIC

r 217' --~ eyes, See above IIPCI Pump (8-1/4 ton)

,201'/177' Yes, See above i

=

Da RCIC Turbine 217' Yes, See above U

(2-1'2 ton) ue 201'/177' Yes, see above N

217' RCIC Pump Yes, See above g

(3-1/4 ton) 201'/177' Yes, See above 217' i

llatch Covers Yes, See above I

g (9-1/4, e

}

8-1/2 tons) 201'/177' Yes, See above C

1

' Table 1 - Item 24

l P.

17/39 TABLE 2 LOAD TABULATION CRANE / HOIST:

Core Spt ay Pumps lloist (10-11216)*

Location l

Reactor Enclosure - Unit 1 j

Impact l

Area ll, Elevation 217' Area Columns 15-17, G-J Loads Elevation Safe-Shutdown l

Equipment Elevation Safe-Shutdown Equipment IIoist Capacityi-217' Yes, unidentified 5 ton Safety-related E;1ectrical Core Spray Pump ( 3 -l/2 ton) 201' Y"8'

""id*"'if1*d Below 217' Slab fes, unidentified S

177, Below 201' Slab e
r l

Core Spray Pump g

Motor 217' Yes, See above 3

M (3-1/4 ton) g i

201' Yes, see above

[

s*

177' Yes, See above N

201' Yes, See above ton E

(

E

<j.

201' Yes, See above e

177' Yes, See above 4

4 l

  • Table 1 - Item 25 i

)

l

P.

18/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Core Spray Pump Iloist (10-11217)*

Location Reactor Enclosure - Unit 1 I

Impact Area 12, Elevation 217' Area Columns 20-23, li-J Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Tioist Capacity:

Yes, unidentifiec 217' Safety-related j,i., ton Electrice,.

i Core Spray Pump (3-1/2 ton) es, unic entifie(

201, i

Below 213' Slab l

Yes, m lZientitiet 177' Belo" 201' Slab e

{

we Core Spray Pump 217' Yes, See above g,

Motor (3 -1/4 ton) a 201' Yes, See above S

t un j

177' Yes, See above Ncm 4

Ilatch Plug n

l l

( 5 -1/ 2 ton) 217' Yes, See above N

i 201' Yes, See above p.

e

{

C 1

177' Yes, See above i

" Table.1 - Item 26 i

s P.

19/39 TABLE 2 LOAD TABULATION CRANE /110IST:

Cooling Water ilX & Core Spray Pump lioist (10-11218)*

Location Reactor Enclosure - Unit 1 Impact Area 12, 16 - Elevation 217' Area Columns 22, E-Il Loads Safe-Shutdown I

Safe-Shutdown Elevation Elevation Equip:nent Equipment IToist Capacity: ~

None 217'

_ 12-1/2 ton ea._

Cooling Water tieat Exchanger 201' Yes, Unidentifie(

(24-1/2 ton) telow 217' Slab O<

177'

$eS6w3bY h a f a

Core Spray Pump D

Votor 217' None S

(3-1/3 ton) l (3-1/4 ton)

Dn 201' Yes, See above Uue 177' Yes, See above Nm et flatch Plugs 217' None n

(8-1/4 ton)

?

201' Yes, See above g

e i

177' Yes, See above C

i,

" Table 1 - Item 27 i

P.

2 0,

)

TABLE 2 LOAD TABULATION CRANE /llOIST:

RllR Pumps lloist (10-11219)*

Location Reactor Enclosure - Unit 1 i

Impact Areas 15, 16 - Elevation 217' Area Columns 14-22, D-E Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipmer.t lioist Capacity:-"

Yes, unidentifieC

- ton 217' Safety-related 10

~

Electrical RIIR Pump (9-1/2 ton) 201' Yes, Unidentifiet Below 217' Slab Yes, unidentifie<

k 177' Below 201' G ratir g e

r RilR Pump Motor 217' Yes, See above E

I (7 ton) g u

i i

201' Yes, See above

$u Q

177' Yes, See above m

217 Yes, See above llatch Plugs (8-1/4 ton) g (9-1/2 ton) ina 201' Yes, See above

  • I e

C 177' Yes, See above

  • Table 1 - Item 28

Po 21/39 TABLE 2 LOAD TABULATIOL CRANE / HOIST:

Containment Equipment Door lioist (10-11220)*

Location Reactor Enclosure - Unit 1 Impact Area 11, Elevation 253' Area Columns 15.5-17, li-J

)

Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Yes, unidentifiec iloist Capacity: -

253' Safety-related

6. ton Electrical Containment Equi [.

]

Door 217' Yes, unidentifie(

(Below 253' Slab) o<e

  1. 1
r
  • =S es

=

l

s i

S I

6*

i i

'a i

'<a ato 0

na<

s~

G c'

4

  • Table 1 - Item 29

j P.

.22/39 TABLE 2 LOAD TABULATION CRANE / HOIST: ' Personnel Lock lloist (lA-Il221/1B-Il221)

  • Location Reactor Enclosure - Unit 1 1

Impact Area 16, Elevation 253'

+

^#**

Columns 20-21.5, D-F Loads Safe-Shutdown Safe-Shutdewn Elevation Elevation Equipment Equipment 11oist Capacity:-

253' None l

20 ton ca.

Personnel Airlock 217 Yes, unidentifie(

(Below 253' Slab:

g e

.?eWo.

ta m

1 n

j D.

3 e

in

  • <m 4

I I

i

?

4 4

i W

l 8

1 C

1

'l

  • Table 1 - Item 30

\\

1

P.

23/39 TABLE 2 LOAD TABULATION CRANE / HOIST:

Reactor Water Cleanup IIX lloist (10-11223)*

Location Reactor Enclosure -Unit 1 Impact Area 12, Elevation 283' Columns 14-17, D-F Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment l

1

-Iloist Capacity:-

283' None l

8. ton liWCU Non-Regenerativo lleat Exchanger (7-1/4 ton-Dry) 253' tes, unidentified l

(Below 283' Slab) i N

re RWCU e

j Rbgenerative lleat.

283' None Exchanger g

(14 ton-Dry)

sp.

H 253' tes, unidentified y

l (Below 283' Slab) e l

en x

a l

re 1

E

oe d

aC I

I

  • Table 1 - Item 31

P.

24/39 TABLE 2 LOAD TABULATION l

CRANE / HOIST:

Fuel Channel llandling Jib Crane (10-11224)*

l Location Reactor Enclosure - Unit 1 Impact Refueling Floor - Elevation 352' Area l

Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipament oist Capacity:-

352' Irradiated Fuel 500 lbs.

1 Fuel Channel i

o4 i

en

r e

.en i.

c e

  • u D.

I

[u

'l e

ca 1

%m 4

tta j

i

o I

eI e

i I

1 i.

  • Table 1 - Item 32 1

i'

P.

25/39-TABLE 2 LOAD TABULATION CRANE / HOIST:

CRD Platform Iloist (10-11229)*

Location Reactor Enclosure (Drywell) - Unit 1 Impact Area 15 (Drywell), Elev. 253' Area Loads Safe-Shutdown Sa e-Shutdown Elevation Elevation Equipment Equipment I

]

Iloist Capacity:-

253' (es, unidentified j

1 ton s RIIR l

CRD Removal Platform e

et s

2-

rem i

o.

sc*n t

1 o,

I w

i

+-

4 a

1 l

m x

I "e

t I

oe

.I e

C I

  • Table 1 - Item 33 4

i 1

P. 26/39 TABLE 2 LOAD TABULATION /

\\n T l A-li2 3 3,23 4,2 3 5

, ],,1

,2 235 1

CRANE /liOIST:

MSRV Service / Removal lioists s

e Location Reactor Enclosure - Unit 1 I

Impact Drywell, Elevation 273' Area 286' I

Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipament Yes, unidentifiei l iloist Capacity:

Safety-related 1 ton /2 ton E~ain Steam 286' Relief Valves (1200 lbs. ca.)

Yes, unidentified

273, i

Safety-Related e

et:reea

sa D

Ow 6*

De s

m 1

i H

r i

t*-

a t

i

  • Table 1 - Item 34

P. 27/39 TABLE 2 LOAD TABULATION CRANE /flOIST:

Disposal Cask Cart Removal lloist (10-11236)*

Location Reactor Enclosure-Unit 1 Impact Drywell, Elevation 253' Area Loads Safe-Shutdown Sa fe-Shutdewn Elevation Elevation Equipment Equipment iioist Capacity:

253' None

~

L ton i

Disposal Cask Yes, unidentifiec Cart 238' (Below 253' Slab)

O

<:e 5

DE

x:

I t

D

s i

nv 6*

n i

m Mm rt i

e Bm

oa

>I e

4

  • Table 1 - Item 25 l

1 i

P.

28/39 TABLE 2 LOAD TABULATION CRANE /llOIST:

Containment flydrogen Recombiner Cover lloist (10-11237)*

I Location Reactor Enclosure - Unit 1 Impact Areas 11,16 - Elevation 283' Columns 15-17,II-J Area 20-21,F-G Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment

'IIoist Capacity:-~

283' Yes, unidentifiec I

1 ton Safety-related ti Recombiner Electrical C$ver Yes, uniden tifie(

i 253' (Below 283' Slab) 0<e i

H

re l

De 4

c, o

i u

l a

Un i

4 l

i wu tt e

B to l

na d

a l.

l^

i l

  • Table 1 - Item 36 l

w

P.

29/39 TABLE 2 LOAD TABULATION CRANE /flOIST:

Equipment Hatch Bridge Crane (10-11238)*

Location Reactor Enclosure - Unit 1 Impact Area 15 - Elevation 253' Area Columns 21.5 - 22.5, D-P Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Iloist Capacity:

~

i 253' None 25 ton t

Miscellaneous l

Loads RilR i

ns trumenta don 200' o

i (Below 217' Slab 4e M

re De S
c e

bu&

l w

i

-u 4

m

  • <m rte i

ain

o e

4 eI i

e

{

C i

  • Table 1 - Item 37 4

P 30/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

CRD Maintenance Area Crane (10-11239)*

Location Reactor Enclosure - Unit 1 Impact Area 15, Elevation 253' Area Columns 14.1 - 15.5, D-F Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment i

Iioist Capacity: '

l 1 ton Dontrol Rod 253' None l'

I Drive Yes, unidentifiet 217' (Below 253' Slab) 4 e

T 1

ee i

G 1

c 4

,u i

a a

w a

l e

4 i

tn M

1 1

re 4

e N

ta a

i

>e i

<e-e C

l I

t

  • Table 1 - Item 38 1

P.

31/39 TABLE 2 LOA 0 TABULATION CRANE /flOIST:

Diesel Generator Bridge Cranes (IA-H501, 1B-11501, IC-501,10-501)*

Location Diesel Generator Rooms - Unit 1 Impact Elevation 217' Area Columns 13.5-21.5, South of Reactor l

I Enclosure Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Diesel Generatort IIoist Capacity:

~

217' 15 ton Auxillaries Diesel Gen.

Parts O<e I

et

r a>

Q.

c mu O.

H F*-

u 1

4 4

f un M

m 1

at m

i I

o m

<r m

C 1

i t

l

  • Table 1 - Item 44

P.

32/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Spray Pond Pump floists ( 00-II511, 00-11513)*

Location Spray Pond Pump liouse - Common Impact Columns 1-3.5,B-C Columns 3.5-6, B-C Area (00-11513)

(00-11511)

Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment Unidentified Unidentified iloist Capacity:

268' Safety-related 268' Safety-related

-3' ton ea.

Electrical Electrical RilR Service RilR Service RiiR Service Water Valves 251' Water Valves, 251' Water Valves Loops A,C Loops B,D (Below 268' Slat. )

(Below 268' Slab)

re D.

Q.

c i

=

D 1

D.

5 De I

en a

g a

e i

n 1

m E

i.

C 1

  • Table 1 - Item 49 1

l P.

33/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Control Room Chiller Portable Gantry lioist (00-11514)*

Location Control Structure - Common i

Impact Area 8, Elevation 200' Area Columns 19-27, J-N l

t Loads Safe-Shutdown Sa fe -Shutdown I

Elevation Elevation Equipment Equipment I

Iloist Capacity:

200' None 3 ton Miscellaneous None Loads 180' l

(Below 200' Slab)

O<

e N

mn.

i I

c
  • u D.

5 m

4 l

4 4

m

'<a i

e B

i

  • oa 1

N e

\\

1 2

i

  • Table 1 - Item 50 1

i i

P.

34/39 TABLE 2 LOAD. TABULATION CRANE /if0IST:

Steam Tunnel Monorail Ibists*

Location Reactor Enclosure - Unit 1 Impact Areas 11, 12 - Elevation 279'-6" Area Columns 17. 5-19. 5, II-J Loads Safe-Shutdowia Safe-Shutdown Elevation Elevation Equipment Equipment 279'-6" None Misc. Valves 253' Yes, RCIC pipin< l g

j (Below 279'-6" Gra t inct)

roea
c

>ua H

F*

i u

W3 m

.N a

rte i

B

~

n

}

n i

fm C

i 4

1 4

+

  • Table 1 - Item 53 i

l 1

1

P.-

35/39 TABLE 2 LOAD TABULATION CRANE /IIOIST:

Refueling Platform Grapple & Ilois ts

  • Location Reactor Enclosuro - Unit 1 Impact Area 11-18, Elevation 352' Area Columns 14.5-23, F-li Loads Safe-Shutdown Safe-Shutdown Elevation Elevatiot.

Equipment Equipment Iloists Capacity:

352' Irradiated Fuel 1200 lb.

1000 lb.

Misc. loads s Wt. of fuel bundle plus handling tool o<e E

ea n,

te l

=

i D

i De H

n i*

s e

to M

t a

ree

=

l e<

\\

m l\\

K l

l

(.

  • Table 1 - Item 54 i

i

N P.

36/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Spr.4y Pond RIIRSW/ESW Pumps Removal Crane

  • Location Spray Pond Pump flouse - Common Impact Columns 1-3.5, B-C Columns 3.5-6, B-C Loads Safe-Shutdown Safe-Shutdown Elevation Elevation Equipment Equipment 4

RilRSW 287' None 287' None ESW Pumps RIIRSW & ESW 268' 268' A & C Pumps /

ll & D Pumps / Valves O

Valves (nelow Ploor Slab)

(Below Floor Slab)

r*

i 2

=

D.

l

n o
s l

D.

w i

n 3e En N

4 m

ese i

w l

ra l

C l-1 1

  • Table 1 - Item 55

P.

37/39 TABLE 2 LOAD TABULATION CRANE /IIOIST:

Control Room rf VAC Equipment lioist (00-11124)*

Location Control Structure - Common Impact Area 8, Elevation 302' Area Columns 20.5-26, K-M 1

Loads Safe-Shutdown Sa fe -Shutdrwn Elevation Elevation Equipment Equipment I

iloists Capacity:

302' Yes, unidentifiet i 2_ con /3 ton Safety-realted Electrical Misc. IIVAC l

Equipment Yes, unidentifie< l Safety-related 89, Electrical ke M:re D.

c i

=

=

3 i

D.

H

&ne m

M a

ete B

M i

w.<re I

1

  • Table 1 - Item 58 i

P.

38/39 TABLE 2 LOAD TABULATION CRAME/lf0IST:

Wetwell Monorail lloist*

4 Location Reactor Enclosure - Unit 1 Impact Areas 11, 12, 15, 16

.Elev. 217' Area Columns 16-21, E-J Loads Elevation Safe-Shutdown Safe-Shutdown Equipment Elevation Equipaent t

iloist Ca 2 city:

217' None 2 ton Ecuum Relief Valve Assemblies PSV-5 7-13 7A, B, C, I-None 182' S

(Below 217' Grating) e t

et i

ee D.

c i

i I

p.

U

s 2

I e

m I

Na j

rt.

wa<

I e

i c

l i

1

  • Table 1 - Item 59 1

P.

39/39 TABLE 2 LOAD TABULATION CRANE /IlOIST:

Control Structure Fans Lif ting Beam lloist*

Location Control Structure - Unit 1 Impact Area 8, Elevation 321' Area Columns 21-24.5, K-M Loads Safe-Shutdown Safe-Shutdown Elevation Elevation I

Equipment Equipment tioist Capacity:

321' None 2 ton i

Control Room Yes, unidentified liVAC Fans 304 (Below 321' Grati ng) g

<e et

reoa j
n D%

l

  • r D

i e

m m

a t

e i

9 m

Wa s

}

eI i

S i

i C

i i

i

  • Table 1 - Item 60 i

{

Ovarh cd Handling Syctema R3vicw TABLE 3 P.

1/1 LIMERICK SPECIAL LIFTING DEVICES Complies Load Design with Item Special Lifting Device

Weight, Safety ANSI 14.6 W

Factor *

-1978?

1 Dryer & Separator Sling 45/74 5xW No (GE-F19-E008) tons 2

RPV Head Strongback 92 tons 5xW No 3

Head Nut & WasNor Rack Sling 700 lbs.

5xW N/A**

4 Service Platform Rack Sling 6 tons 5xW No (GE-F21-E001) 5 i!ead Stud Rack Sling 1-1/2 tons (PECo)

(PECo)

PECo 6

General Purpose Grapple 600 lbs.

5xW N/A**

(GE-F21-E001) 7 Seal Surface Protector Sling 700 lbs.

(PECo)

N/A**

8 Refueling Shield Lift Rig 22 tons 3x(W+25%)

No (Bechtel 8031-C-90)

Reactor Well Shield Plugs &

9 Dryer / Separator Canal Plug Up to 3x(W+25%)

No Strongback I (Bechtel) 90 tons 10 Dryer / Separator Canal Plugs 45 tons 3x(W+25%)

No Strongback II (Bechtel) 11 Refueling Slot Shield Plugs 16 tons 3x(W+25%)

No Lifting Ass'y I (Bechtel)

' uel Pool Stop Logs 35 tons 3x(W+25%)

No 12 2

Lifting Ass'y II (Bechtel) 13 Spent Fuel Cask Yoke 100 tons j

  • GE design safety factors based on material ultimate strength.

Bechtel design safety factors based on material yield strength.

    • Not a heavy load.

P-240/4

lN l

aus num M b.

m

\\

\\

1-O.

NO. OF PAGES dk 4

REASON O PAGE ILLEGIBLE.

C HARD COPr FILED AT-PDR CF OTHER O BETTER COP ( REQUESTED ON

/

/

E 100 LARGE TO RLM.

e 4 DC e nttD e eDR @

OTHER O FILMED ON ADERTURE CARD NO -

O/- dk i

I

_ _ _ _. _.. _ _ _ _ _ _..... _,. _... _ _. _. _. _ _. _ _.