ML19353A117
| ML19353A117 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 11/14/1980 |
| From: | Madsen G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Millen C PUBLIC SERVICE CO. OF COLORADO |
| Shared Package | |
| ML19353A118 | List: |
| References | |
| NUDOCS 8101070215 | |
| Download: ML19353A117 (2) | |
See also: IR 05000267/1980021
Text
CEtlTRAL FILES
POR:HQ
g m,'er
UNITED STATES
(pDR
g
[.~
+- $
NUCLEAR REGULATORY COMMISSION
M
1
i
k^
dh!f
REGION IV
1 'r
E
?,
-
511 RYAN PLAZA DRIVE. SUITE 1000
I
STATE
%,, ,,#
ARLINGTON. TEXAS 76011
Novemoer 14,198u
)
,-i
In Reply Refer To:
1
Occket No. 50-267/80-21
~
>
U
~,
v
1
,
m
J
k
Public Service Company of Coloraco
Attn:
Mr. C. X. Millen
Senior Vice President
P. G. Box 840
Cenver, Colorado 80201
Gentlemen:
This refers to the inspection conducted under the Resident Inspection Program
by Messrs. M. W. Dickerson and R. E. Collins of this office during the period
October 1-31, 1980, of activities authori::ed by NRC Operating License No. CPR-3a
and to their discussions of the findings with members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in our report, which is
enclosed with this letter.
Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews
with cersonnel, and observations by the inspectors.
During this inspection it was found that certain of your activities were not
conducted in full compliance with NRC requirements, as set forth in the Notice
of Violation enclosed herewith as Enclosure (1).
Pursuant to the provisions
of 10 CFR 2.201, you are required to submit to this office within 25 days of
the date of this Notice, a written statement or explanation in reply, including:
(1) admission or denial of the alleged items of noncomoliance; (2) the reasons
for tne items of noncomoliance if acmitted; (3) One corrective steos wnicn have
been taken and the results achieved; (4) corrective steos wnich will be taken
to avoid further items of noncomoliance; and (5) the date wnen full compliance
will be achieved. Under the authority of Section 182 of the Atcmic Energy Act
of 1954, as aroenced, this response shall be submitted under oath of affirmation.
- n ac::oreance witn Iection 2.790 of the NRC's ' Rules of Practice,' ? art 2,
Title 10, Coce of Feceral Regulations, a copy of 2is letter anc .he enclosed
inspection report will be placed in the NRC's Public Document Rocm.
If this
report contains any information that you or your contractors believe to De
proprietary, it is necessary that you submit a written aoplication within 20
days of the date of this letter to this office to withhold such information
from public disclosure. Any such application must include a full statement
of the reasons on the basis of which it is claimed tnat the infomation
8101070 Q$
.
_
-
.
.
?ublic Service Company of Colorado
2
November 14, 1980
identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the
report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be cleased
to discuss them with you.
Sincerely,
f b k a h A -v 0
G. L. Madsen, Chief
Reactor Operations and
Nuclear Support Branch
Enclosures:
1.
2.
IE Inspection Report No. 50-267/80-21
cc w/ enclosures:
D. W. Warembourg, Nuclear Production Manager
Fort St. Vrain Nuclear Station
P. O. Box 368
Platteville, Colorado 80601
L. Brey, quality Assurance
1
4
-,
, ,
,--e
.e-1
-- , av
,-
,
-