O Public Service Company of Colorado Docket No. 50-267 Fort St. Vrain j
i Based on the results of an NRC inspection conducted October 1-31, 1980, and in accordance with the Interim Enforcement Policy, 45 FR 66754 (October 7, 1980),
the following violation was identified:
Technical Specification 7.4.a, Procedures, Administrative Controls, states, in part that " written procedures shall be established, implemented, and maintained.
.." Overall Plant Operating Procedure I contains the Sealed i
Valve Check List which requires certain valves to be locked in position prior to plant startup.
Section B.31.6, sealed valve list, contains the System Pre-operational Valve Check List for the Secondary Coolant System which requires proper valve positioning prior to plant startup.
Contrary to the above, two valves requires to be sealed in position were found on October 26, 1980 at 10:46 a.m. with no locking device inposition with the Reactor at approximately 4% power.
This is a severity level V violation.
(Supplement I.E.)