Forwards IE Insp Repts 50-317/81-07 & 50-318/81-07 on 810302-0405 & Notice of Violation
ML19352B097
Person / Time
Site: Calvert Cliffs  
Issue date: 05/14/1981
From: Keimig R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Lundvall A
BALTIMORE GAS & ELECTRIC CO.
Shared Package
ML19352B098 List:
References
NUDOCS 8106030079
Download: ML19352B097 (2)


See also: IR 05000317/1981007

Text

.

__

Ife-

a n ne

.

/

o

UNITED STATES

g

8

NUCLEAR REGULATORY COMMISSION

o

$

,I

REGION 1

431 PARK AVENUE

o,

% ****. &y

.

KING OF PRUSSIA, PENNSYLVANIA 19406

MAY 141981

8*

~

Docket Nos.

50-317

N

'4

eg

/

L

50-318

-

W

E3

3@ 0l[p

Baltimore Gas and Electric Company

6

ATTN: Mr. A.E. Lundvall, Jr.

9.$ ge

Vice President, Supply

-

w

P.O.

Box 1475

'

Baltimore, Maryland

21203

g

Gentlemen:

Subject:

Inspection Nos. 317/81-07

318/81-07

This refers to the routine safety inspection conducted by Mr. R. Architzel

of this office on March 2-April 5,1981 at the Calvert Cliffs Nuclear Power

Plant, Lusby, Maryland of activities authorized by NRC License Nos. DPR-53

and OpR-69 and to the discussions of our findings held by Mr. Architzel

with Mr. L. Russell and other members of your staff at the conclusion of

the inspection.

Areas examined during this inspection are described in the Office of Inspection

and Enforcement Inspection Report which is enclosed with this letter.

~

Within these areas, the inspection consisted of selective examinations of

procedures and representative records, interviews with personnel, measurements

made by the inspector, and observations by the inspector.

Our inspector also verified the steps you have taken to correct the item of

noncompliance brought to your attention in the enclosure to our letter

dated October 15, 1980. We have no further questions regarding your action

on Item C at this time.

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forch in

tne Notice of Vfolation, enclosed herewith as Appendix A.

This item of

noncomplia".ce has been categorized into the levels described in the Federal

Register Notice (45 FR 66754) dated October 7, 1980.

You are required to

respond to this letter and in preparing your re::ponse, you should follow

the instructions in Appendix A.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy

of this letter and the enclosures will be placed in the NRC's Public Document

Room.

If this report contains any information that you (or you contractor)

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is necessary

that you (a) notify this office by telephone within ten (10) days from the

date of this letter of your intention to file a request for withholding;

8106030077

@ n

-

, .

-

MAY 141981

,:

and (b)-submit within 25 days from the date of this letter a written application

to this office to withhold such information.

Consistent with section

2.790(b)(1), any such application must be accompanied by an affidavit

executed by the owner of the information which identifies the document or

part sought to be withheld, and which contains a full statement of the

reasons on the basis which it is claimed that the information should be

withheld from public disclosure.

This section further requires the staten.ent

to address with specificity the considerations listed in 10 CFR 2.790(b)(4).

'The information sought to be withheld shall be incorporated as far as

possible into a separate part of the affidavit.

If we do not hear from you

in this regard within tne specified periods noted above, the report will be

placed in the Public Document Room. The telephone notificatica of your

intent to request withholding, or any request for an extension of the 10

day period which you believe necessary, should be made to the Supervisor,

Files, Mail and Records, USNRC Region I, at (215) 337-5223.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

.. .

R. R. K 1 mig, Ciief

.

Projects Branch #2, Division of

Resident and Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Combined Office of Inspection and Enforcement Inspection

"

Report Number 317/81-07; 318/81-07

cc w/encis:

R. M. Douglas, Manager, Quality Assurance

L. B. Russell, Plant Superintendent

T. Sydnor, General Supervisor, Operations QA

R. C. L. Olson, Principal Engineer

J. A. Tiernan, Manager, Nuclear Power

R. E. Denton, General Supervisor, Training and Technical Services

i

, , . -