Forwards IE Insp Repts 50-289/80-02 & 50-320/80-02 on 800201-0316 & Notice of Violation
ML19352A011
Person / Time
Site: Crane  Constellation icon.png
Issue date: 05/28/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Arnold R
METROPOLITAN EDISON CO.
Shared Package
ML19351G574 List:
References
NUDOCS 8102250409
Download: ML19352A011 (2)


See also: IR 05000289/1980002

Text

a

.

UNITED STATES

.

o

NUCLEAR REGULATORY COMMisslON

]

(~)

!"

aEciou l

~

g

$

g

631 PARK AVENUF

'

KING OF PRUS$3 A. PENNSYLVANIA 19406

/

MAY 2 8 1980

Docket Hos. 50-289

50-320

Metropolitan Edison Company

ATTN: Mr. R. C. Arnold

Senior Vice President

100 Interpace Parkway

Parsippany, New Jersey 07054

Gentlemen:

Subject:

Combined Inspection 50-289/80-02; 50-320/80-02

This refers to the inspection conducted by Messrs. D. Haverkamp, R. Conte

and M. Shanbaky of this office on February 1 - March 16, 1980, at Three

Hile Island Nuclear Station, Units 1 and 2, Middletown, Pennsylvania of

activities authorized by NRC License Nos. DPR-50 and DPR-73 and to the

discussions of our findings held by Mr. A. Fasano of this office with

Mr. G. Miller of your staff and by Mr. Conte with Mr. J. Barton of your

staff at the conclusion of the inspection.

Areas examined during this inspection period are described in the Office

of Inspection ana Enforcement Inspection Report which is enclosed with

this letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

licensee and contractor personnel, measurements made by the inspectors,

and observations by the inspectors.

i

Based on the results of this inspection, it ' ppears that certain of your

a

activities were not conducted in full compliance with NRC requirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix A.

These items of noncompliance have been categorized into the levels as

' described in our correspondence to you dated December 31, 1974. This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

,

!

and the results achieved; (2) corrective steps which will be taken to

avoid further items of noncompliance; and (3) the date when full compliance

will be achieved.

- 810 225 0 h

.

.

- .. .-.

_

. . . -

-

.- -

.

.

Metropolitan Edison Company

2

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosures will be placed in the NRC's Public Document Room.

If

this report contains any information that you (or your contractor)

believe to be proprietary, it is necessary that you make a written

application within 20 days to this office to withhold such information

from public disclosure. Any such application must be accompanied by an

affidavit executed by the owner of the information, which identifies the

documant or part sought to be withheld, and which contains a statement

of reasons which addresses with specificity the items which will be

considered by the Commission as listed in subparagraph (b)(4) of

Section 2.790. The infonnation sought to be withheld shall be incorporated

as far as possible into a separate part of the affidavit.

If we do not

hear from you in this regard within the specified period, the report

will be placed in the Public Document Room.

-

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

,

,

'

4

e-

.,

.

ce H. Grier

Director

Enclosures:

i

l

1.

Appendix A, Notice of Violation

l

2.

Office of Inspection and Enforcement Combined Inspection Report

L

Numbers 50-289/80-02 and 50-320/80-02

'

cc w/ encl:

J. G. Ferbein, Vice President Nuclear Operations

G. K. Hovey, Director, TMI-2

..

R. J. Toole, Manager, TMI-l

J. J. Barton, Manager Site Operations, TMI-2

W. E. Potts, Radiological Controls Manager, TMI-l

R. W. Heward, Radiological Controls Manager, TMI-2

J. J. Colitz, Manager Plant Engineering, TMI-l

..

,

B. Elam, Plant Engineering Manager, TMI-2

R. F. Wilson, Director, Technical Functions, TMI-2

'

L. W. Harding, Supervisor of Licensing

E. G. Wallace, Licensing Manager

I. R. Finfrock, Jr.

!

R. W. Conrad

J. B. Lieberman, Esquire

G. F. Trowbridge, Esquire

Ms.' Mary V. Southard, Chairperson, Citizens for a Safe Environment (Without Report)

i