Forwards IE Insp Rept 50-369/80-35 on 801110-14.No Noncompliance Noted
ML19351G177
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 01/12/1981
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19351G172 List:
References
NUDOCS 8102230225
Download: ML19351G177 (2)


See also: IR 05000369/1980035

Text

. _

. _ _ _ . . - _ . - _ _ . ~ _ . , _ _

_ . . _

'

. s*

/

o

UNITED STATES

!"

1

NUCLEAR REGULATORY COMMISSION

,

E

REGION ll

I

~

8

101 MARIETTA ST., N.W., SUITE 3100

o

8

ATLANTA, GEORGIA 303o3

o

.....

In Reply Refer To:

RII:DLA

50-369/80-35

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

l

Charlotte, NC 28242

Gentlemen:

4

This refers to the inspection conducted by D. L Andrews of this office on

November 10-14, 1980, of activities authorized by MtC Construction Permit No.

l

CPPR-83 for the McGuire facility, and to the discussion of our findings held

with W. M. Sample at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the insp;ction consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

i

Title 10, Code of Federal RegulStions, a copy of this letter and the enclosed

inspection repo? t will be placed in the NRC's Public Document Room.

If this

report contains any iaformation that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

(

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

'

l

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document. If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

Sincerely,

l

l

9

I\\ h--

-

J. Philip Stohr, Chief

4 Fuel Facility and Materials

Safety Branch

!

Enclosure:

(See Page 2)

e onaac225

p____.__.__

_ ._ _

. _ _

-

'

.

, . '

I

Duke Power Company

-2-

Enclosure:

Inspection Report No. 50-369/80-35

cc w/ enc 1:

M. D. McIntosh, Plant Manager

J. C. Rogers, Project Manager