Text
O
- "%
g
UMTED SMTES
$e
NUCLEAR REGULATORY COMMISslON
f*
- I
REGION I
f
G31 PARK AVENUE
KING OF PRUSSI A. PENNSYLV ANI A 19406
~~~'
mise
Docket Nos. 50-352
'
50-353
Philadelphia Electric Company
ATTN: Mr. John S. Kemper
Vice President
Engineering and Research
2301 Market Street
Philadelphia, Pennsylvania
19101
Gentlemen:
Subject:
Corbined Inspection 50-352/80-19 and 50-353/80-17
This refers to the routine inspection conducted by J. Durr of this office on
October 7 - 30, 1980 at Limerick Generating Station, Unit Nos. I and 2, Limerick,
Pennsylvania of activities authorized by NRC License Nos. CPPR-106 and CPPR-107
and to the discussions of our findings held by J. Durr with J. Corcoran of your
staff at the conclusion of the inspection.
Areas examined during this inspection are described in the Office of Inspection
and Enforcement Inspection Report which is enclosed with this letter. Wi thin
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, measurements made by the
inspector, and observations by the inspector.
-
Based on the results of this inspection, it appears that one of your activities
was not conducted in full compliance with NRC requirements, as set forth in the
Notice of Violation, enclosed herewith as Appendix A.
This item of noncom-
pliance has been categorized into the levels as described in our correspondence
to you dated December 31, 1974.
This notice is sent to you pursuant to the
provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10,
Code of Federal Regulations. Section 2.201 requires you to submit to this
office, within thirty (30) days of your receipt of this notice, a written state-
ment or explanation in reply including:
(1) corrective steps which have been
taken by you and the results achieved; (2) corrective steps which will be taken
to avoid further items of noncompliance; and (3) the date when full compliance
wili be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosures will
be placed in the NRC's Public Document Room.
If this report contains any
information that you (or your contractor) believe to be proprietary, it is
necessary that you make a written application within 20 days to this office to
withhold such information from public disclosure. Any such application must be
810 22309Ph
.
w-
wm
.
.. - - - _
-
-_. .
.
.
.
.
Philadelphia Electric Company
2
<
accompanied by an affidavit executed by the owner of the information, which
identifies the document or part sought to bc withheld, and which contains a
statement of reasons which addresses with spe .;ificity the items which will be
considered by the Commission as listed in subparagraph (b) (4) of Section 2.790.
The information sought to be withheld shall be incorporated as far as possible
into a separate part of the affidavit.
If we do not hear from you in this
regard within the specified period, the report will be placed in the Public
Document Room.
>
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
f,
Sv-
'
Robert T. Carlson, Chief
Reactor Construction and Engineering
Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Combined Office of Inspection and Enforcement Inspection Report
Number 50-352/80-19 and 50-353/80-17