ETEmL TRANS!hiiTED HERE%TTH l
Iq:S%q CONTAINS 2.7M INFORMATION e
UNITED STATES e
./ " '
NUCLEAR REGULATORY COMMISSION o
oE REGION il j
C o
101 MARIETTA sT., N.W., SUITE 3100 j'
ATL ANTA, GEORGIA 30303 In Reply Refer To:
RII:DWJ 70-1113/80-17 General Electric Company ATTN:
J. A. Long, General Manager Wilmington Manufacturing Department P. O. Box 780 Wilmington, NC 28402 Gentlemen:
This refers to the inspection conducted by D. W. Jones of this office on September 8 through 11, 1980, of activities authorized by NRC License No. SNM-1097 at General Electric Company, Nuclear Fuel Department, Wilmington, North Carolina and to the discussions of our findings held with W. J. Hendry at the conclusion of the inspection.
Areas examined during this inspection included your program for nuclear material control and accountability under the applicable provisions of Title 10, Code of Federal Regulations, Part 70, "Special Nuclear Material", and specific license conditions. Within these areas, the inspection consisted of selective examina-tions of procedures and representative records, interviews with personnel, performance tests, and observations by the inspector.
We have examined actions you have taken with regard to previously identified enforcement matters. These are discussed in the enclosed inspection report.
During the inspection, it was found that certa 9 activities under your license appear to be in concompliance with NRC requirements. This item and references to pertinent requirements are listed in the Notice of Violation enclosed herewith as Appendix A.
This notice is sent to you pursuant to the provisions of Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-tions. Section 2.201 requires you to submit to this office, within 20 days of your receipt of this notice, a written statement or explanation in reply including:
(1) corrective steps which have been taken by you and the results achieved; (2) corrective steps which will be taken to avoid further noncompliance; and (3) the date when full compliance will be achi(ved. Details of activities involving safeguards and security measures are exempt from disclosure in accordance with 10 CFR 2.790(d). Therefore, your responsd should be incorporated in a separate paper and referenced in your reply.
In accordance with Section 2.790(d) of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations, activities involving safeguards and security measures are exempt from public disclosure; th refore, the enclosures to this letter with the exception of the report cover page, which is an inspec-tion summary, will not be placed in the Public Document Room.
8011200 ETERIAL TFJJIS!'ITTED HEREWITH CONTAINS 2.733INFORMTION
_. ~ -..
ETER!AL TRANSLTTED HEREWITH CONTAlKS 2.7931NFORMT10N SEP 261980
. General Electric Company *:
Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,.
b
'.'$.Kenna, Chief afeguards Branch
Enclosures:
1.
Appendix A, Notice of Violation j
(Exempt from Disclosure) 2.
Inspection Report No. 70-1113/80-17 (Exempt from Disclosure) 3.
Inspection Summary (Not Exempt)
I.
cc w/ enc 1:
A. L. Kaplan, Manager:
Licensing and Compliance Audits C. M. Vaughan, Manager l