05000219/LER-1980-040-03, /03L-0:on 800904,north Core Spray Sys Snubber 51/6 Failed to Lock in Either Tension or Compression Directions. Caused by Loose Socket Head Screws Permitting Hydraulic Fluid to Leak.Snubber Replaced & Screws Tightened

From kanterella
(Redirected from ML19351D249)
Jump to navigation Jump to search
/03L-0:on 800904,north Core Spray Sys Snubber 51/6 Failed to Lock in Either Tension or Compression Directions. Caused by Loose Socket Head Screws Permitting Hydraulic Fluid to Leak.Snubber Replaced & Screws Tightened
ML19351D249
Person / Time
Site: Oyster Creek
Issue date: 10/01/1980
From: Gasbarro D
JERSEY CENTRAL POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
Shared Package
ML19351D248 List:
References
LER-80-040-03L, LER-80-40-3L, NUDOCS 8010090322
Download: ML19351D249 (1)


LER-1980-040, /03L-0:on 800904,north Core Spray Sys Snubber 51/6 Failed to Lock in Either Tension or Compression Directions. Caused by Loose Socket Head Screws Permitting Hydraulic Fluid to Leak.Snubber Replaced & Screws Tightened
Event date:
Report date:
2191980040R03 - NRC Website

text

..

__-a

., N ~ C FIEU E6 U. S. NUCLEAR GEGULATT,RY COMMISSION i17 771

- )

LICENSEE EVENT REPORT CONTROL BLCCK: l l

l 1

l l Jh (PLEASE PRINT OR TYPE ALL AEQLREO INFf,RMATIONI l

1 6

lo lil l N) Jl 0l C l P l 1l@l 0 l0 l-l 0 l 0l 0l 010 l -l 010 l@l 4 l 111 l 1 l 1 l@l l

l@

Y 8 2 L CErd!EE CCDE le 15 LICENSE NUMSER 2$

26 LICENSE TYPE JO

$7 GA T $4 con'T lotil

[ "c{ l l}@l 0 ; 5 l0 l0101211 19 )@{ 0l 9101418101@ll l 01 l

18lol@

7

'l 64 64 COCK ET NUMS E R 68 69 EVENT DATE 74 75 REPCRT QATE 80 EVEN T DESCRIPTION AND PROBABLE CoNSEOuENCES i

,,,73g On September 4, 1980, during functiona testing inspection of snubbers-1 installed on' safety related systems, snubber'51/6 (Serial No. F93502)

I o 13 i I g,

, located on Core Spray System North failed to lock up in either the 1

tension or compression directions. As a result of this snubber failure, I

~

it can be assumed that seismic restraint was lost in the direction for I

c ;;;. which the inubber was designed thereby increasing probability of system I

de-me in the event of a seismic occurrence.

I

,o,,,,

80 g 9

,, C CO;E susC E CO*.*?ONENT OCDE S'Ed Dt s'

E jaj,j IS i Fl@ l E l@ l B l@ l SI Ul Pl 01 R l T lO [QJ@ [Z.j @

g 9

10 11 12 12 18 19 20 sEQUENTI AL OCCURRENCE REPCRT R EvtsION

~

Lg EVENT vg AR R EPORT NO.

CCDE TYPE N O.

@ gy'R a0 18 10 I l-l 1 014 10 l LcJ lof3I I Ll

[-j [QJ

.g

_ 21 22 22 24 26 27 28 29 30 31 32 T

A TC P NT ME MOURs s8 i FOR 8.

SUPPL MANU8f. TLRER lC l@l Z l@

lZl@

IZ l@

l01010101 I Yl@

LNJO LILl@

ls121019I@

22 24 as sa 27 4o 4:

42 42 a

47 CAUSE DESCRIPT1oN AND CORRECTIVE ACTIONS I l i i i o l l Cause of this occurrence was attrihutad +n inneo endet ha=d er rer which permitted hydraulic fluid to leak past the seals along the control i

valve assembly seat. The snubber was replaced with an operable spare.

l After screws were tightened and hydraulic fluid replaced, the snubber l

y was retested and performed satisfac.torily.

y OTutRsTATus @"is"Cevifv'

' C'e?

s,0wER oiscovtRv oEsCRimeN A

g [EJ @ l0 19 10 l @ ]

NA l

lBl@l Surveillance Test l

12 u

a e

80 8, g,y g,,

T F RE(East AucuNT OF ACTivtTY LOCATION OF RELEASE ITTO IRELYsEl_4l@l NA

.l l

NA l

I

,ERsONNEL ExeosOEs eEsCRimoN @

NuuSE R TvPE It171l010l0l@l2l@l NA l

PERsONN EL INJU IEs cavesER

DESCRIPTION

li la l l 010 l 01@l NA l

7 8 9 11 12 80

'S'E ' *Sfs*C"',T ON' ' '' " @

T I t 191 l Z i@l NA

]

3 e 9 10 80 [T]T] 's E @l EsCRIPTION I[

NA l

l l l l l l l l l l l l l' Domenick P. Gasbarro 609-693-6038 NAME OF PREPARER PHON E:

8010090312.