ML19350E786
| ML19350E786 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 06/05/1981 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19350E782 | List: |
| References | |
| NUDOCS 8106230520 | |
| Download: ML19350E786 (2) | |
See also: IR 05000254/1981006
Text
_ _ _ _ _ _ _ _ _
i\\
[1
-
i
UNITEJ STATES
/
o
NUCLEAR' REGULATORY COMMISSION
f
,
g
REGION lli
- a*
7se noossvsLT nos.a
i
GLEN ELLYN, ILLINOIS 64137
%.....o
June 5, 19S1
O
Docket No. 50-254
Docket No. 50-265
Commonwealth Edi.On Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
-
This refers to the routine safety inspection conducted by
Messrs. N. J. Chrissotimos and S. G. DuPont of this office on April 8, through
May 15,1981, of activities at Quad-Cities Nuclear Power Station, Units 1 and 2,
authorized by NRC Operating Licenses No. DPR-29 and E . DPR-30 and to the dis-
cussion of our findings with Mr. N. J. Kalivianakis at the conclusion of the
inspection.
~
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and in-
terviews with personnel.
1
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in enclosed Appendix A.
A
written response, submitted under oath er affirmation, is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you or
your contractors believe to be exempt frem disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within seven (7)
days from the date of this letter of your intention to file a request for
withholding; and (b) submit within twenty-five (25) drJs from the date of
this letter a written application to this office to withhold such infor-
'
mation. Section 2.790(b)(1) requires that any such application must be
I
accompanied by an affidavit exc'uted by the owner of the information which
identifies the document or part scught to be withheld, and which contains
a full statement of the reasons on the basis which it is claimed that the
s
alos230520
1
,
.
.
,
.
.
..
Commonwealth Edison Company
-2-
June 5,-1981
information should be withheld from public disclosure. 'This section further
requires the statement to address with specificity the considerations listed
in 10 CFR 2.790(b)(4). The information sought to be withheld shall be
incorporated as far as possible into a separate part of the affidavit.
If
we do not hear from you in this regard within the specified periods noted
above, a copy of this letter and the enclosed inspection report will be
placed is the Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
R. F. Heishman, Acting Director
Division of Resident and Project
Inspection
Enclosures:
1.
Apperdix A, Notice
of Violation
2.
IE Inspection Reports
.
No. 50-254/81-06 and
No. 50-265/81-06
cc w/encls:
J. S. Abel, Director
-
.
of Nuclear Licensing
N. Kalivianakis,
Plant Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Mary Jo Murray, Office of
Assistant Attorney General
RII
RI
RIII
RI
kr
l^ b
{
rissotimos/so
etmann
p
H
un
6/4/81
f g-gj
.
-
.
- ...
.
..
- - .
..
-.
. . - - -
. .