ML19350E130
| ML19350E130 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 04/08/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19350E131 | List: |
| References | |
| NUDOCS 8106170030 | |
| Download: ML19350E130 (2) | |
See also: IR 05000413/1981006
Text
.
,,
.
.
/
h
UNITED STATES
$
1
WUCLEAR REGULATORY COMMISSION
-
r
REGION 11
k
I
101 MARIETTA ST., N.W.. SulTE 3100
ATLANTA, GEORGIA 30303
APR 0 81981
'
Duke Power Company
ATTN: W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
Subject: Report Nos. 50-413/81-06 and 50-414/81-06
This refers to the routine safety inspection conducted by P. K. VanDcorn of this
office on February 26 - March 25, 1981, of activities authorized by NRC
Construction Permit Nos. CPPR-116 and CPPR-117 for the Catawba facility. Our
preliminary findings were discussed with D. G. Beam at the conclusion of the
inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain acitivities under your license
appear to violate NRC requirements.
These items and references to pertinent
requirements are listed in the Notice of Violation enclosea herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
One new unresolved item is identified in the enclosed inspection report. This
item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC " Rules of Practice," Part 2, Title
10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC Public Document Room. If this report
contains any information that you believe to be proprietary, it is necessary that
you make a written application within 20 d /s to this office to withhold such
information from public disclosure. Any such application must include the basis
-
i
for claiming that the information is proprietary and the proprietary information
l
should be contained in a separate part of the document.
If we do not hear from
you in this regard within the specified period, the report will be placed in the
Public Document Room.
t
b
l
i
l '8106 17 0 @
'
4.
-
I
,
, _ .
. . _ ,
_ - _ _ _ _
. - - _ - _ _ _ _ _ _ . -
O
o.
4
Apg 0 B M
Duke Power Company
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
.
I-
I
R. C.
ew s, Acting Director
Division of Resident and
i
Reactor Project Inspection
l
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/81-06
and 50-414/81-06
cc w/ enc 1:
J. W. Hampton, Station Manager
D. G. Beam, Project Manager
,
,
-
l
,
i
.l
t
.
-
i
-
i
i
!
I
t
!
l
!
\\
.
'
l
!
,'
l
-
- - -
-
- - -
.
.
. . ,
..-.., -.,_
- . .
. - . . . _ , . - . . ,