Text
.
.?pn u:ugm#o,
UNITED STATES
,
,( }
NUCLEAR REGULATORY COMMISSION
t[g
<,e
REGION V
-s
-
g
1990 N. CALIFORNIA BOULEVARD
o,% W
e
SUITE 202, WALNUT CREE K PLAZA
- ,,,*,
WALNUT CREE K, CALIFORNIA 94698
MAY 2 21981
,\\
%
Docket Nos. 50-361, 50-362
,
gao
D
^5
Southern California Edison Company
j
.
/61 g.
P. O. Box 800
'
2244 Walnut Grove Avenue
Rosemead, California 91770
Attention:
Dr. L. T. Papay, Vice President
Advanced Engineering
Gentlemen:
Subject: NRC Inspection at San Onofre Units 2/3
This rt Iers to the inspection conducted by Messrs. J. H. Eckhardt and
J. F. Burdoin of this office on April 7-10, 1981 of activities authorized
by NRC Coutruction Permit Nos. CPPR-97 and 98, and to the discussions
-
of their findings held with Mr. D. E. Nunn and members of your staff
on April 10, 1981.
Areas examined during this inspection are described in the enclosed
inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, inter-
views with personnel, and observations by the inspector.
No items of noncompliance with NRC requirements were identified within
the scope of this inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC's
Public Document Room.
If this report contains any information that you
believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is
necessary that you (a) notify tnis office by telephone within ten (10)
days from the date of this letter of your intention to file a request
for withholding; and (b) submit within 25 days from the date of this
letter a written application to this ofdice to withhold such information.
8105270 %
Q
.
-
-
.
.
MY !d U3I
'
Southern California Edison Company
-2-
If your receipt of this letter has been delayed such that less than seven (7)
days are available for your review, please notify this office promptly so
that a new due date may be established. Consistent with section 2.790(b)(1),
any such application must be accompanied by an affidavit executed by the owner
of the information which identifies the document or part sought to be withheld,-
and which contains a full statement of the reasons on the basis which it
is claimed that the information should be withheld from public disclosure.
This section further requires the statement to address with specif ..ty the
considerations listed in 10 CFR 2.790(b)(4). The information sought to be
withheld shall be incorporated as far as possible into a separate part of
the affidavit.
If we do not hear from you in this regard within the specified
periods noted above, the report will be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be glad
to discuss them with you.
Sincerely,
--
-
-
6.)
Av)$$ -
Ch'--
B. H. Fau kenber -,
'
Reactor Constru tion Projects Branch
,
Enclosure:
'
IE Inspection Report
Nos. 50-361/31-07
50-362/81-02
cc w/o enclosure:
R. Dietch, Vice President
Nuclear Engineering & Operations, SCE
.
--
,
~w-
, , - , -
,
, , -
~w
,- -, ,--
a