Forwards IE Insp Repts 50-361/81-07 & 50-362/81-02 on 810407-10.No Noncompliance Noted
ML19350D951
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 05/22/1981
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Papay L
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML19350D952 List:
References
NUDOCS 8105270337
Download: ML19350D951 (2)


See also: IR 05000361/1981007

Text

.

.?pn u:ugm#o,

UNITED STATES

,

,( }

NUCLEAR REGULATORY COMMISSION

t[g

<,e

REGION V

-s

-

g

1990 N. CALIFORNIA BOULEVARD

o,% W

e

SUITE 202, WALNUT CREE K PLAZA

  • ,,,*,

WALNUT CREE K, CALIFORNIA 94698

MAY 2 21981

,\\

%

Docket Nos. 50-361, 50-362

,

gao

D

^5

Southern California Edison Company

j

.

/61 g.

P. O. Box 800

'

2244 Walnut Grove Avenue

Rosemead, California 91770

Attention:

Dr. L. T. Papay, Vice President

Advanced Engineering

Gentlemen:

Subject: NRC Inspection at San Onofre Units 2/3

This rt Iers to the inspection conducted by Messrs. J. H. Eckhardt and

J. F. Burdoin of this office on April 7-10, 1981 of activities authorized

by NRC Coutruction Permit Nos. CPPR-97 and 98, and to the discussions

-

of their findings held with Mr. D. E. Nunn and members of your staff

on April 10, 1981.

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC's

Public Document Room.

If this report contains any information that you

believe to be exempt from disclosure under 10 CFR 9.5(a)(4), it is

necessary that you (a) notify tnis office by telephone within ten (10)

days from the date of this letter of your intention to file a request

for withholding; and (b) submit within 25 days from the date of this

letter a written application to this ofdice to withhold such information.

8105270 %

Q

.

-

-

.

.

MY !d U3I

'

Southern California Edison Company

-2-

If your receipt of this letter has been delayed such that less than seven (7)

days are available for your review, please notify this office promptly so

that a new due date may be established. Consistent with section 2.790(b)(1),

any such application must be accompanied by an affidavit executed by the owner

of the information which identifies the document or part sought to be withheld,-

and which contains a full statement of the reasons on the basis which it

is claimed that the information should be withheld from public disclosure.

This section further requires the statement to address with specif ..ty the

considerations listed in 10 CFR 2.790(b)(4). The information sought to be

withheld shall be incorporated as far as possible into a separate part of

the affidavit.

If we do not hear from you in this regard within the specified

periods noted above, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be glad

to discuss them with you.

Sincerely,

--

-

-

6.)

Av)$$ -

Ch'--

B. H. Fau kenber -,

'

Reactor Constru tion Projects Branch

,

Enclosure:

'

IE Inspection Report

Nos. 50-361/31-07

50-362/81-02

cc w/o enclosure:

R. Dietch, Vice President

Nuclear Engineering & Operations, SCE

.

--

,

~w-

, , - , -

,

, , -

~w

,- -, ,--

a