Responds to NRC 810318 Ltr Re Violations Noted in IE Insp Repts 50-413/81-03 & 50-414/81-03.Corrective Actions: Implemented Correct Acceptance Criteria & Developed & Implemented Weld Insp Program
ML19350D876
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 04/08/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19350D874 List:
References
NUDOCS 8105190604
Download: ML19350D876 (2)


Text

.

  • , .j p/

DUKE PowEn COMPANY 2 t . .

Powen Dutwnwo 422 Sourn Cnuncu SrazzT, CHAnwTTE, N. C. 2824a , ,

,, . ., g. .G , 3' wiw4u o. ,4anca,sa. April 8, 1981 WCt Passiotut Tttt PuoN E
Anta 704 SetAu PaoouctioN 373 4083 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303 -

Re: RII:PKV 50-413/81-03 50-414/81-03

Dear Mr. O'Reilly:

I 1 lease find attached a response to Infrsetion No. 413-414/81-03-01 which was identified in the above referenced Inspection Report. Duke Power Company does not consider any information contained in this inspection report to be proprietary.

I declare under penalty of perjury that the statements set forth herein l are true and correct to the best of my knowledge.

Very truly yours, .

hw . V William O. Parker, Jr.

RWO:scs Attachment '

cc: NFC Resident Inspector Catawba Nuclear Station l

l l

l l

810539g(,0y

.g. .

DUKE POWER COMPANY CATAWBA NUCLEAR STATION Infraction:

As a result of the inspection conducted on February 2-25, 1981, and in accordance with the Interic Enforcement Policy, 45 FR 66754 (October 7,1980), the following violation was identified.

10CFR 50, Appenddx B, Criterion V as implemented by Topical Report Duke-1-A, Section 17, paragraph 17.1.5 requires that procedures include appropriate quantitative acceptance criteria for determining that important activities have been satisfactorily ace'omplished. ,

~

Contrary to the above, quantitative acceptance criteria were not specified on January 15, 1981 in that butt weld reinforcement re-quirements for safety related supports and restraints were not specified in the applicable licensee visual inspection procedure (L80, Rev. 7). This resulted in the use of les4 restrictive require-ments than those of the code of record for supports and restraints (ASME,Section III, Paragraph NF-4426).

Response

(1) The visual inspection of butt weld reinforcement on NF Support /

Restraints was performed using incorrect acceptance criteria. ,

(2) The correct acceptance criteria wds included in Table 1 of Quality "

Assurance Procedure L-80, Rev. 7, (" Visual Workmanship Standards for Welds") but because the procedure body did not adequately reference the correct table incorrect requirements were used by the inspector.

(3) Duke Power Company Nonconforming' Item Report.No. 10945.was initiated on February 3, 1981 and the Quality Control inspectors were immediately notified of the discrepancy. The correct acceptance criteria was implemented. Quality Assurance procedure L-80, Rev. 9, has incorporated corrections to reference the correct acceptance criteria and received at Catawba March 19, 1981.

(4) The NF Support / Restraint records will be reviewed and all questionable -

butt welds will be identified. An inspection program will be developed '

and bnplemenced for the welds.

(5) Full compliance will be achieved by July 1, 1981.

!