Text
.
O
~
U.S. NUCLEAR REGULATORY CCMMISSION OFFICE OF INSPECTICN AND ENFORCEMENT REGION IV Report No. 99900030/81-01 Program No. 51300 Company:
Borg Warner Inc.
Engineered Products Group 2300 East Vernon Avenue Vernon, California 90058 Inspection Conducted:
January 12-15, 1981 A
Inspectors N., hi fs,-
C//9?/h/
~
v.
H. Hunter, contractor Inspector Date Components Section !
Vendor Inspection Brar.ch Other:
ObiO.\\
r m.#.t.
-=f_A, e ' N / 3i D. 0. Oriskill Gate-NRC Investigator C//.2#6f/
Approved b.
y
- 0. E. whitesell, Chief Date ComponentsSection I Vendor Inspection Brancn Summary Inspection on January 12-15, 1981 (99900030/80-01)
Areas Insoected:
Implementation of 10 CFR 50, Aopendix B, criteria, and applicacle codes and standards, including special process control and welder qualification control.
The inspection involved thirty (30) inspector hours on site by two (2) inspectors.
Results:
In the two (2) areas inspected, there were no socarent deviations er unresolved items identified.
81033.101%
L' 2
DETAILS SECTION A.
Princioal Persons Contacted "H. T. Thomoson, Executive Vice President J. F. Adams, Presicent
- A. W. Snodgrass, Vice President
- R. L. Romero, Director - Quality Assurance
- E. W. Ybarra, Quality Assurance Manager "J. E. King, Manager, Manufacturing Operations "R. W. Supernaugn, Manager, Employee Relations
- 0. C. Tacb, legal-Counsel C. S. Boster, Manager, Nuclear Engineering C. L. Speed, General Foreman, Quality Control C. Marsnal, Welder I. Hoiquin, Welder W. Foster, Nuclear Clean Rocm Sucervisor
'J.
W. McKenna, Welcer J. M. Maneth, Superintendant M. H. Casaco, Quality Control Inspector
- Denotas those who attended the exit meeting.
3.
General Engineered products is a division (EPO) of Borg Warner, Incorporated, employing 809 hourly and 475 administrative personnel.
The facility covers acproxi-mately 365,000 square of manufacturing and 80,000 square feet for office space which is selfcontained in that most all ASME required services, i.e.,
design, welding, machining, NDE and hycrostatic/ performance testing are provided.
Any required heat treat / stress relieve projects are contracted locally to approved contractors.
-EPO holds ASME certifications for both the "N" and "NPT" stamps tnat expire in 1981.
l EPO manufactures such pumps and components as:
1.
Pr'.. nary circularing 2.
Resicual heat removal 3.
Low pressure core' spray 4
3 5.
Low head safety injection 6.
Decay heat removal The above types of components comprise approximately TE of EPO current capacity and have been supolied to as many as fifty (50) nuclear facili-ties.
The Authorized Inspection Agency is he Fictory Mutual Insurance Comcany.
Due to a reduction of nuclear reist.ed comoonents, the status of tne Autnorized Nuclear Inspector has been.ecuced from full time, to an as needed basis.
C.
Welder Qualification (Trainino) 1.
Objective The objective of this area of the inspection was to verify that the welders and welcing ocerators are qualified in accoroance with NRC rules and regulations, ASME Code recuirements and the vendor's cccmitments in the ASME accepted Quality Assurance Program.
2.
Method of Accomolishment The cojectives of the inspection were acremnlisned cy:
a.
Review of the ASME accepted QA Manual, Revision 10 (1).Section 10 titled " Personnel Qualification (Welder and NOE)
(27 4ction 27 titled " Filler Metal and Welding Control" to verify that procedures _ had been established for the qualifi-cation of welders and welding operators.
b.
Review of th2 Record of Performance Qualification tests of welders and welding operators to verify accuracy and conformance with ASME Code requirements.
c.
Review of welders qualification log to verify the vendor has a system for maintaining a continuous recora of the welder quali-fications and the welders have been and are currently qualified to weld under the respective procecures.
A d.
Interviews with personnel to verify they were kncwledgeable in the procedures acplicable to welder qualification.
3.
Findinos a.
The inspector verified tnat for plant 13, tne welders anc welding operators were cualified in accorcance with NRC rules and regulations, ASME Coce recuirements, and the vendor's commitments in the ASME accepted Quality Assurance Program for commercial nuclear power.
b.
Within this area of tne inscection, there were no acparent deviations or unresolved items identified.
O.
Control of Scecial Crocesses Weicinc Procecure Scecification 1.
Obiective The ocjective of this area of tne i.acection was to determine if the welcing procedure scecificstions used ty the vendor in production welding hac been prepared, qualifiec and controlled in accordance witn the acclicable NRC regulation, the ASME accepted Quality Assurance Program, and ASME Coce requirements.
2.
Methed of Accomolishment The cbjective of this area of the inspection was accomplished by:
a.
Review of the ASME accepted Quality Assurance Manual Revision; (1) Section 25 titled " Control of Manufacturing and Special Process Procedures" (2) -Section 27 titles " Filler Metal and Welding Control" (3) Section 10 titled " Personnel Qualifications" to verify.whether the vendor had-established procedures for the precaration, qualification, certification, districution, and revision of welding procedure specifications.
3.
. Review of Welding procedures, to verify that all essential variaoles, supplementry essential.variaoles and nonessential variables are in accordance with the acclicable Sections of the ASME Code.
^
5 c.
Review of Certifications for four (4) welders to verify that:
(1) The procedures had been cualified in accordance with Section IX of the ASME Code and the supoorting procedure cualification records were on file.
(2) The procedures qualification records had oeen certified by the vendor and the mechanical test results meet or exceed the minimum ASME Code requirements.
.(3) The procedure qualification record list the essential variables for the scecific welding processes and the values and ranges of the variaoles are consistant within the limits of Section IX of the ASME Code.
d.
Review of the Welding Procedure Specifications and Procedure Qualification Records listed in paragracns b. and c. above te verify that:
(1) All mechanical tests, required by Sections III and IX of the ASME Code, had been completed and are procerly documented in the procedure cualification records.
(2)- Changes and/or revisions of essential variables in any welding procedure specification, is sucported by requali-fication' documents.
(3) Changes in the nonessential variables of the welding procedure specification are properly identified and documented.
f.
Cbservation in the shop to verify that the welding procedure specifications are available to the welcers and the specifi-cations are properly followed.
g.
Interviews with personnel to ' verify they are knowledgeable in the procedures applicable to welding.
3.
-Findings a.
The inspector l verified that the welding procedure scecifications used by the vendor in production welding had been preparea, quali-fiec and controlleo in accordance with the acplicacie NRC regu -
lations the ASME accepted-Quality. Assurance Program, and the ASME Code.
6 b.
Within this area Of the inspection, no ceviat1ons or unresolved items were 1centifled.
E.
Exit Interview The inspector met with management re0resentatives at the c0nciusion of the inspection on January 15, 1981. The inspector summarized the scope and findings identified curing the inspection.
Management ackncwledged the inspector's comments regarding the secpe and findings as presented.