ML19350C002
| ML19350C002 | |
| Person / Time | |
|---|---|
| Site: | Oconee |
| Issue date: | 02/11/1981 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19350B995 | List: |
| References | |
| NUDOCS 8103240635 | |
| Download: ML19350C002 (2) | |
See also: IR 05000269/1980038
Text
-
}
UNITED STATES
- o
.
E
t,
NUCLEAR REGULATORY COMMISSION
,
5
i
REGION 11
o,
[
101 MARIETTA ST., N.W.. sulTE 3100
ATLANTA, GEORGIA 30303
-
,
- ,*
FEB 111981
. .
Duke Power Company
'
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
Charlotte, NC 28242
,
-
Gentlemen:
i~
l.
Subject: Report Nos. 50-269/80-38, 50-270/80-34 and 50-287/80-32
i
I
This refers to the routine safety inspection conducted by F. Jape of this office
on - December 1 - December 31, 1981 of activities authorized by NRC Operating
,
l
License Nos. DPR-38, DPR-47 and DPR-55 for tLe Oconee facility. Our preliminary
1
findings were discussed with J. E. Smith at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the in=pection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
,
During the inspection, it was found that certain activities under your license
!
appear . to violate NRC - requirements.
This item and references to pertinent
'
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
- Elements to be included in your response are delineated in
'
-Appendix A.
-
t
We have examined actions you have taken with regard to previously identified
enforcement matters. These are discussed in the enclosed inspection report.
Two new unresolved items are identified in the enclosed inspection report. These
items will be examined during subsequent inspections.
,
i
In accordance with Section 2.790 of the NRC " Rules. of Practice," Part 2, Title
(
10,fCode of Federal Regulations, a' copy of this letter and the enclosed inspec-
L
tion report will be placed 'in the NRC Public Document Room.
If this report
contains. any information that you believe to be proprietary,- it is necessary
!
that you make.a written application within 20' days to this office to withhold
i
such information from public disclosure. Any such application must include the
. .
basis for claiming : that the information is proprietary and the proprietary
i'nformation should be contained in ' a separate part of the - document. If we do
not hear from you in tais regard within the specified period, the report will be
,
- placed in the Public Document Room.
,
I
B10324 0 'O
. a .. =
.
. - - -
. _ _
_.
- _
_- .
..
. . . .
-
--
- = _ -
. .
c.
.
Duke Power Company
-2-
FEB111981
1
- ..
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
4
1
E.c.
-
R. C.
w s, Acting Chief
Reactor Operations and Nuclear
,
Support Branch
I-
Enclosures:
1.
Appendix A, Notice of Vic
.mn
2.
Inspection Report Non
P" -269/80-38,
50-270/80-34 and 50 .87/80-32
cc w/ enc 1:
J. E. Smith, Station Manager
+
t
i
,
e
'
l
r
s
l-
'
_