ML19350C000

From kanterella
Jump to navigation Jump to search
Responds to NRC Re Violations Noted in IE Insp Repts 50-269/80-38,50-270/80-35 & 50-287/80-32.Corrective Actions:Stopped Spill,Decontaminated Area & Counseled Personnel About Procedures.No Proprietary Info
ML19350C000
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/06/1981
From: Parker W
DUKE POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19350B995 List:
References
NUDOCS 8103240628
Download: ML19350C000 (3)


Text

e..

1

,_i-D. UKE POWER COdiPANY,

Powra Butt.ntxo 4ce SocTn Cucacu SrazzT. C1unt.orTz, N. C asa4a

~.:

gj WI LLIAM O. PAR KER, J R.

Wct Pats 6 DENT TELEPmO N E:Anta 704 2 ' 3-'

  • sve-p.oowc" "

March 6, 1981 Mr.' James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, Suite 3100 Atlanta.. Georgia._30303 Re: RII:FJ 269/80-38

^

50-270/80-35 50-287/80 -

Dear Sir:

With regard to R. C. Lewis' letter of February 11, 1981 which transmitted the subject inspection report, Duke Power Company does not consider the information

. contained.therein to be proprietary.

Please find attached a response to the cited item of noncompliance.

Very ruly yours,

~ > -.

T W,4 n m m.

-er William O. Parker, Jr.

JLJ:pw Attachment

~.,

5 r

.v.~.<*

,~;'

r

'a.

g1032

I i

Mr. James P. O'Reilly, Director March 6, 1981 Page Two WILLIAM 0. PARKER, JR., being duly sworn, states that he is Vice President of Duke Power Company; that he is authorized on the part of said Company to. sign and file with the Nuclear Regulatory Commission this response to IE Inspection Pepert 50-269/80-38, 50-270/80-35, 50-287/80,-32 with respect to onee Nuclear Station; and that all statements and matters set forth t rein are true and correct.to the best of his knowledge.

1 /'

/

~ ~

0%.A 6. clr LL L.- A.

/

William O. Parker, Jr.,L91ce President Subscribed ~and sworn to before me this 6th day of March,1981 b'

40

.h

]

Notary Public a-,

My Comission ' Expires:

September 20, 1984 9

[-A e'

T+

,-p

.e

  • .=#

j, *-,

k.4 s4 g

s.

A' s.j.'

DUKE POWER ('ftfPANY

~e OCONEE NUCIIAR STATION Response to I.E. Inspection Report 50-269/80-38, -270/80-35, -287h 0-32 Violation

- Technical Specification 6.4.1 requires that the station be operated and main-tained in accordance with current written approved procedures; including.the operation of radioactive waste management systems.

Contrary to the above, on November 21, 1980, the Oconee Interim Radioactive Waste system was operated without an adequate procedure, resulting in a.

radioactive spill.

No NRC limits were exceeded.

This-is.a Severity Level V Violation.

(Supplement I. E.)

._.~

s

. Response-This' incident resulted-from personnei: error and' procedural deficiency. As

- stated in the details ofJthe inspection report, personnel'were simultaneously draining the Condensate'Demineralizer and purging the resin transfer line.

The proceduta used did'not adequately specify valve lineups or address the.

purging.of'the resin line.

Immediate corrective. action included stopping the actions causing the spill and containment of_the spilled water.

The contaminated arca was :then decontaminated.

- The personnel involved were counseled about their performance. All personnel

. involved have reviewed -- Station. Directive 4.2.1, ~ '! Procedures", and the need for planning and coordination in'the.use of procedures has been stressed to them.

The procedure used has: been revised to address valve lineup while purghg' the.

~

resin'line'..

~

t 4'

Dose. calculations for airborne activity releases as a result'of this event-.

- revealed'that no Technical' Specification or NRC limits lwe're exceeded.

I t -

a

+

4 q

s s

4, 7

_ es

.-w5 6

}

f 6

0 5

w e

9 n

O.

+,4

.7