f 5219 March 14, 1981 United States Nuclear Regulatory Commission Division of Licensing Washington, DC 20555 Attn:
Mr. Dennis Chaney
Reference:
Beaver Valley Power Station - Unit No. 1 Docket No. 50-334, License No. DPR-66 Technical Specification Change Request No. 60 Additiona1 Information
Dear Mr. Chaney:
Attached hereto is the supplemental test data related to the performance history of the Residual Heat Removal pumps at Beaver Valley Unit No. 1.
As you can see from this data, the RHR pumps have met, and continue to meet the discharge pressure versus flow acceptance criteria as set forth in the ASME Code,Section XI, Table IWP-3100-2. The proposed technical specification, as transmitted to you on March 13, 1981, adequately reflects the intent of the ASME Code with respect to RHR pump performance.
Should you have further comments or questions, do not hesitate to contact me.
Very truly yours, D. Sieber Superintendent Licensing and Compliance Attachment
/Joal
.s I(
C108230 %\\
9
~
J I
Attachment A Residual Heat Removal Pump Performance Data
,1 I
RHR Pump Test Data Test Data 1/19/79 3/22/79*
3/08/81 3/13/81 Both run Both run LA 1A Pumps Tested
,,,,g,
,,,,g,
1B 1B time time Indicated Flow (gpm) 0 500 3900 3972 Recire Flow ** (gpm) 120 12 500 gpm 500 Based on Recire Line AP 120 120 0
Pump AP (psid) 125 122 94 E
ATHeight Correction (psi)
+ 5.84
+ 5.84 equired equired 96 95.42 Vendor's preducted AP (psid) 130.84 127.84 100 99.57 0.97 1.01 Ratio Calc. AP/ Vendor's AP 0.95 0.94 Calculations performed by NSL.
On 3-06-81, BVPS-1 experienced c.n incident which involved air-binding of the RHR pumps.
- There is no instrumentation which will directly indicate recirculation flow rate.
Recirculation flow has been imputed based upon calculations.
- Pump D/P measured by installed discharge pressure gage less the loop pressure, corrected for elevation for tests conducted on 1-19-79 and 3-22-79.
For tests run on 3-08-81 and 3-13-81, a d/p cell installed to measure pump d/p was used and no elevation correction factor was applied.