UNITED STATES 8
NUCLEAP. o.EGULATORY COMMISSION n
,E REGION I
,\\ \\g g {
S 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA 19406 gf/7 Docket No. 50-219 MAR 2 1981 6f
/
la T
Jersey Central Power and Light Company 2.
3 ATTN: Mr. Ivan R. Finfrock, Jr.
Vice President
@l r[
3 Oyster Creek Nuclear Generating Station P. O. Box 388 b
Forked River, New Jersey 08731 Gentlemen:
The enclosed IE Circular No. 81-03, " Inoperable Seismic Monitoring Information" is forwarded to you information.
No written response is required.
If you desire additional informatien regarding this matter, please contact this office.
Sincerely, Q
Boyce H. Grier Director
Enclosures:
1.
IE Circular No. 81-03 2.
List of Recently Issued IE Circulars CONTACT:
S.-D. Ebneter (215-337-5266) cc w/encls:
M. Laggart, Licensing Supervisor J. Knubel, BWR Licensing Manager o
SSINS No.: 6830 Accession No.:
8008220271 IEC 81-03 UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.
20555 March 2, 1981 IE Circular No. 81-03: INOPERABLE SEISMIC MONITORING INSTRUMENTATION Description of Circumstances:
On November 8, 1980, an earthquake occurred off the coast near Eureka, California.
The earthquake was reported to have a magnitude of 7.0 on the Richter Scale at the epicenter, approximately 25 to 75 miles from the Humboldt Bay Power Plant facility. There were 12 separate seismic events above a magnitude of 3.5 that occurred within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> of the earthquake, the largest event measuring 5.2.
Reported damage to structures included several house, that were moved off supporting pasts, various chimneys that were knocked down, one highway overpass that collapsed, and unspecified damage that occurved at two pulp mills.
There were three potentially different sources of plarc response data: three sets of magnetic tape triaxial accelograph recorders; chree sets of triaxial film recorders (passive device); and one set si triaxial response spectrum recorders (passive device). A review of the records from these instruments indicated the following: the magnetic tape triaxial recorders did not produce useful records due to a degraded low-voltage power supply in the recording system (previously scheduled for routine servicing one week after the earthquake);
a buildup of dirt and dust appeared to make inoperable six of the nine tilm recorders (the readings from the other three are considered highly unreliable and were not obtained from the same set of triaxial recorders); the triaxial response spectrum recorder was the only instrument believed to produce reliable data.
On January 24, 1980, an earthquake measuring 5.5 on the Richter Scale occurred about 10 miles north of Lawrence Livermore. Laboratory (near San Francisco, California). Numerous aftershocks also occurred with one measuring 5.2 on January 26. The damage to civil structures w:
.;o n s
- ed minor.
Rancho Seco Nuclear Plant, located approximately 45 mises nortneast of the earth-quake area, reported no physical damage, although plant personnel felt slight building motion.
Rancho Seco was shutdown for refueling during these earthquakes.
During this period, the electrical seismic. instrumentation system was inoperable because
- not e sp d
e oe I
seismic instrumentation would have activ U.S. Geological Survey equipment close t~