/03L-0:on 810222,reactor Core Isolation Cooling Auto Flow Controller Did Not Control Turbine Properly While in Auto Position During Quickstart Test.Caused by Loose Ribbon Connector on Flow Control M-4 Station
ML19350A323
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 03/05/1981
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19350A322 List:
References
LER-81-010-03L, LER-81-10-3L, NUDOCS 8103130469
Download: ML19350A323 (2)


LER-1981-010, /03L-0:on 810222,reactor Core Isolation Cooling Auto Flow Controller Did Not Control Turbine Properly While in Auto Position During Quickstart Test.Caused by Loose Ribbon Connector on Flow Control M-4 Station
Event date:
Report date:
3661981010R03 - NRC Website

text

_ - _________-____ _______ ___-__-___________ -._-

f217)

LICENSEE EVENT REPORT j

CoNTRot BLoCl<: l l

l l

l l lh (PLEASE PRINT OR TYPE ELL REQUIRED INFO 7WATioN) 1 6

!c I A I E ll IH l 2 l@l010 l-1010101010 l-1010 l@l4 l 11 11 Il ll@l l

l@

}

F S 9 UCENSEE COOL 14 15 LICENSE Nv& bed

6 UCEN5E TvPE 4 57 CAT 64 C

'T l IT R l' "C' LL)@l 0 I s I o I o lo I 316 I 6 l@l o ! ? I ? I? I 11 l@l 01310 !s !811 I@

?

8 60 61 DOCK ET NuveER 64 63 EVENT CATE 74 7b REPORT DATE 83 l

EVENT DESCRIPTION AND PROBABLE CONSEcuENCES h o 2 10n 2-22-81, Uni t 2 was operatino at steady state 15% thermal power.

An I o 3 lRCIC quickstart test was performed in reoards to RCIC auto flow control I l problems.

The flow controller would not control the RCIC turbine prop-I o n o s lerly while in the AUTO position.

HPCI, ADS, core soray, and LPCI were 1

o s loperable at the time of the event.

There were no effects upon oublic l

o 7 lhealth and safety due to this event.

This is a nonrepetitive occurrencel lisTT1 I I

7 8 9 30 CE DE SL COOE COMPONENT COOE SLSCCdf S

E ICIEl@ [E_j@ lEl@ II N l S i T IR l U l@ LC_l@ LZ_J @

o 9 7

8 9

10 11 12 13 18 19 20 SEOV ENTI AL oCCU R R E NCE REPORT R EVISION LER EVENTYEAR REPORTNO.

COOE TYPE NO.

@,ay,/RC I 81 11-l-l I of 11 01 1/l lOI3I LL_]

l-1 10i g

_ 23 22 23 24 26 27 3

M 33 31 32 N ACT CN P

T U T 3 HOURS SB 1 FC B.

L MA F CTLRER [B_j@lZl@

l Zl@

l ZI@

l0 l0 l 0l 0l l yl@

[_y j@

lNl@

lGl018lOl@

33 34 36 36 3J 40 48 42 _

43 44 4;

CAUSE oESCRIPTioN AND CORRECTIVE actions 27 litolIThe flow controller would not function procerly while in the AUTO due toI la loose ribbon connector on the flow control M/A station.

The connec-I i i l tion was repaired, and a quickstart test was cerformed successfully.

I

, 2 litalIRCIC was declared coera<le.

The unit is now in full comoliance with thel l requirements, and no further reportino is reouired.

'" l i 4 7

8 9 80

$7A

% Pon E R OTHERSTATUS C5Q RY C15COVERY C ESCRIPTiCN L.i Ls.J LE.J@ lo 11 13 l@l Na l

la_.J@l Failure durino ranual initiation I

42nviTv Cc' TENT Lz ] @ L.zJ @ l AvocNT or ACTiviTv @ I LOCATicN Cr Rett AsE @

r.ELEAsto c aELE AsE NA l

NA I

i e PEasoNsEt E xecsOES oEsCRiPTicN@

NuveER TY,E l0l0l0l@ W @l NA I

i 7 PE RsONsE t iN,u?iE s cEsCR,TicN@

Nu.u E R l0l0l0l@l NA l

7 8 9 11 12 to LCSS OF OR DAVAGE TO FACILITY TYPE CESCR4Pf aON Q [Z_j@l NA l

7 a,

ea ISSUE]@DE RIPT ON LN l

NA l

llll!ll!lll!l,1 2 a

'*810aisotM een o rmerr.nm C. t.I C<incinmSuoL12iUL_Erasthrem rmm _ _%t _RE7/-7fd5R o

9 O

LER #:

50-366 /1981 - 010 Licensee:

Georgia Power Company Facility Name:

Edwin I.

Hatch Docket #:

50-366

Narrative

Report for LER 5 0-3 66 /19 81 - 010 On 2-22-81, Unit 2 was operating in the RUN mode at 15% ther-mal power.

The unit was preparing to roll the main turbine.

An RCIC quickstart test was performed as a result of apparent RCIC auto flow controller problems experienced following a

manual initiation during a scram from 13% -thermal power at 14:46 on 2-21-81.

The flow controller would not control -the RCIC turbine properly while in the AUTO position.

RCIC was declared inoperable and was determined reportable under plant Tech Specs section 6 9 1 9.b.

HPCI,, ADS, core spray, and LPCI were operable at the time of the event.

There were no effects upon public health and safety due to this event.

This is a

.noncepetitive occurrence.

'~

The flow controller would not function properly while in the AUTO position due to a loose ribbon connector on the flow control M/A station (vendor GE, part #547121FAAZ2, MPL 2E51-K612).

The connection was repaired, and a quickstart test was performed successfully.

RCIC was declared operable and the unit is now in full compliance with the requirements and no further reporting is required.